Site Inspection Summary
Date: |
4 May 2006 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
42 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Fugitive dust was not observed along haul roads and during dumping of
waste. The Contractor had installed water sprinklers at tipping hall but
water supply was still awaiting. |
|
|
2. |
Silty material inside the trapezoidal channel was
found after heavy rains. Stagnant water was also found inside the trapezoidal
channel. The Contractor was reminded to remove the silty materials and stagnant
water after rain events. |
|
|
3. |
The Contractor was advised to
apply for the Water Discharge License as soon as possible. |
|
|
4. |
Wheel-washing bay at Area B2
was found mal-function. The Contractor was reminded to repair the
wheel-washing bay as soon as possible. |
|
|
5. |
Silty material inside the u-channel at area B2
had been cleared. |
|
|
6. |
Oil stains from oil buckets near tipping hall had
been removed. |
|
|
7. |
Bunding along the trapezoidal
channel had yet been provided. The Contractor was reminded to provide bunding
along the trapezoidal channel to prevent surface runoff and muddy water
release from site during heavy rains. |
|
|
|
New Observation |
|
|
8. |
Dark smoke was observed generated from the
generator set behind the Engineer’s site office at Area A. The Contractor was
reminded to repair / replace the generator set as soon as possible. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
10 May 2006 |
Time: |
10:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
44 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Fugitive dust was observed along haul roads and during dumping and
sorting activities. The Contractor had deployed a water truck to dampen the
haul road, yet the frequency should be increased. The Contractor had
installed water sprinklers at tipping hall but water supply was still
awaiting. |
|
|
2. |
Silty material and stagnant water was found
inside the trapezoidal channel after heavy rains. The Contractor was reminded
to remove the silty materials and stagnant water after rain events. |
|
|
3. |
The Contractor was advised to
apply for the Water Discharge License as soon as possible. |
|
|
4. |
Wheel-washing bay at Area B2 had
been repaired. |
|
|
5. |
Bunding along the trapezoidal
channel had yet been provided. Drainage pipe had been installed in the lower
portion of the trapezoidal channel and filling works was underway. The
Contractor was reminded to provide bunding along the trapezoidal channel and
at the ends of the filled area to prevent surface runoff and muddy water
release from site during heavy rains. |
|
|
6. |
The generator set behind the Engineer’s site
office had been repaired/replaced. No dark smoke was observed. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
Oil buckets were found placed on a drip tray
without cover near the tipping hall. The Contractor was reminded to provide
tarpaulin cover to the oil buckets. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
18 May 2006 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
46 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Fugitive dust was observed along haul roads and during concrete
breaking and sorting activities at Area A. The Contractor had deployed a
water truck to dampen the haul road, yet the frequency should be increased
and water spraying should be provided to dusty operation. The Contractor had
installed water sprinklers at tipping hall but water supply was still
awaiting. |
|
|
2. |
Small amount of rubbish, silty material and
stagnant water was found inside the trapezoidal channel after heavy rains.
The Contractor was reminded to remove the silty materials and stagnant water
after rain events. |
|
|
3. |
The Contractor was advised to
apply for the Water Discharge License as soon as possible. |
|
|
4. |
Bunding along the trapezoidal
channel had yet been provided. Drainage pipe had been installed in the lower
portion of the trapezoidal channel and filling works was underway. The
Contractor was reminded to provide bunding along the trapezoidal channel and
at the ends of the filled area to prevent surface runoff and muddy water
release from site during heavy rains. |
|
|
5. |
Oil buckets placed on a drip
tray without cover near the tipping hall had been removed. |
|
|
|
|
|
|
|
New Observations |
|
|
6. |
One wheel-washing bay at Area B1 site exit was
mal-function. The Contractor was reminded to provide manual wheel-washing as
an interim measure. |
|
|
7. |
The unpaved area next to Area
B1 (behind the container office) was found dry and fugitive dust was observed
during vehicle movement. The Contractor was reminded to dampen the unpaved
haul road during dry weather. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
25 May 2006 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
48 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Fugitive dust was observed along haul roads and during sorting
activities at Area A. The Contractor had deployed a water truck to dampen the
haul road, yet the frequency should be increased during dry weather and water
spraying should be provided to dusty operation. The Contractor had installed
water sprinklers at tipping hall but water supply was still awaiting. |
|
|
2. |
Stagnant water was found inside the trapezoidal
channel after heavy rains. The Contractor advised that the accumulated water
will be used for water spraying along haul roads. |
|
|
3. |
The Contractor was advised to
apply for the Water Discharge License as soon as possible. |
|
|
4. |
Bunding along the trapezoidal
channel had yet been provided. The Contractor was reminded to provide bunding
along the edge of the trapezoidal channel to prevent surface runoff and muddy
water release from site during heavy rains. |
|
|
5. |
Wheel-washing bay at Area B1
site exit had been repaired. |
|
|
6. |
The unpaved area next
to Area B1 (behind the container office) had been dampened. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
Water pondings were found at area A and in
tipping hall. The Contractor was reminded to fill the area or remove the
stagnant water after heavy rains. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |