1.1
This is the third Quarterly Environmental Monitoring and
Audit (EM&A) Summary Report for the Temporary Construction Waste Sorting
Facility at Tseung Kwan O Area 137 (the Project). This report presents a
summary of the environmental monitoring and auditing works carried out by the
ET for the Project for the period from May to July 2006.
Project
Organization and Contacts of Key Management
1.2
The project organization is shown in Appendix A. The key
personnel contact names and numbers are summarised in Table 1.1
Table
1.1 Contact Information of Key
Personnel
Party |
Position |
Name |
Telephone |
Fax |
CEDD |
Engineer |
Mr. Richard Ng |
2762 5307 |
2714 0113 |
IC(E) (BMT) |
IC(E) |
Mr. Ben Ridley |
2815 2221 |
2815 3377 |
Contractor (Paul Y -CREC(HK) JV) |
Project
Manager |
Mr.
Gene Cheung |
2831 8282 |
2623 9426 |
Project Engineer
(TKO137) |
Mr. Gao |
6501 4586 |
-- |
|
ET (MEMCL) |
ET Leader |
Mr. Y T Tang |
3105 8537 |
2891 0305 |
1.3
The construction phase under Contract CV/2004/13 – Temporary
Construction Waste Sorting Facility at Tseung Kwan O Area 137 commenced on
l
Temporary access road construction including road kerb and
U-channel;
l
Installation of steel fence along the temporary access road;
l
Construction of car parking shelter at Engineer’s office;
l
Operation of Construction Waste Sorting Facilities (CWSF) by
manual sorting;
l
Installation of water spraying system for dust suppression;
l
Forming end-tipping platform and access
ramp for mechanical sorting plant;
l
Erection of mechanical sorting plant;
l
Slope trimming to enlarge the operational area for the
mechanical sorting plant;
l
Testing and commissioning for mechanical sorting plant;
l
Construction of water meter applied from WSD;
l
Construction of planter area and by-pass ingress near
combined reception & exit office;
l
Landscaping works at Portion B1; and
l
General site formation for surface
runoff at Portion A.
1.4
The general layout plan of the Project sites showing the
contract areas are shown in Figure 1.1.
1.5
The construction programme is provided in Appendix B.