1.                  INTRODUCTION

 

Scope of Report

 

1.1               This is the third Quarterly Environmental Monitoring and Audit (EM&A) Summary Report for the Temporary Construction Waste Sorting Facility at Tseung Kwan O Area 137 (the Project). This report presents a summary of the environmental monitoring and auditing works carried out by the ET for the Project for the period from May to July 2006.

 

Project Organization and Contacts of Key Management

 

1.2               The project organization is shown in Appendix A. The key personnel contact names and numbers are summarised in Table 1.1

 

Table 1.1         Contact Information of Key Personnel

 

Party

Position

Name

Telephone

Fax

CEDD

Engineer

Mr. Richard Ng

2762 5307

2714 0113

IC(E)  (BMT)

IC(E)

Mr. Ben Ridley

2815 2221

2815 3377

Contractor

(Paul Y -CREC(HK) JV)

Project Manager

Mr. Gene Cheung

2831 8282

2623 9426

Project Engineer (TKO137)

Mr. Gao

6501 4586

--

ET (MEMCL)

ET Leader

Mr. Y T Tang

3105 8537

2891 0305

 

Construction Programme

 

1.3               The construction phase under Contract CV/2004/13 – Temporary Construction Waste Sorting Facility at Tseung Kwan O Area 137 commenced on 12 November 2005. The activities during this reporting quarter included:

 

l           Temporary access road construction including road kerb and U-channel;

l           Installation of steel fence along the temporary access road;

l           Construction of car parking shelter at Engineer’s office;

l           Operation of Construction Waste Sorting Facilities (CWSF) by manual sorting;

l           Installation of water spraying system for dust suppression;

l           Forming end-tipping platform and access ramp for mechanical sorting plant;

l           Erection of mechanical sorting plant;

l           Slope trimming to enlarge the operational area for the mechanical sorting plant;

l           Testing and commissioning for mechanical sorting plant;

l           Construction of water meter applied from WSD;

l           Construction of planter area and by-pass ingress near combined reception & exit office;

l           Landscaping works at Portion B1; and

l           General site formation for surface runoff at Portion A.

 

1.4               The general layout plan of the Project sites showing the contract areas are shown in Figure 1.1.

 

1.5               The construction programme is provided in Appendix B.