2.1
The EM&A Manual designated two monitoring stations
to monitor environmental impacts on air quality due to the Project. The
monitoring locations are depicted in Figures 2.1.
2.2
After review of the monitoring stations, ET proposed
to cancel the air quality monitoring station TKO1 due to its incapability in
reflecting the air quality impact arising from the Project upon the nearby
sensitive receiver (i.e.
2.3
The EM&A Manual also required environmental site
inspections for air quality, noise, water quality, chemical and waste
management and landscape and visual.
Environmental Quality Perfomance
Limits (Action/Limit Levels)
2.4
The environmental quality performance limits (i.e.
Action/Limit Levels) were derived from the baseline monitoring results of the
Fill Bank at Tseung Kwan O Area 137, and are given in Appendix C.
Environmental Mitigation Measures
2.5
Relevant environmental mitigation measures were stipulated
in the Particular Specification and EP (No.: EP-134/2002/F) for the Contractor
to adopt. A list of mitigation measures and their implementation statuses are
given in Appendix D.