Site Inspection Summary
Date: |
7 July 2006 |
Time: |
12:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
60 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The Contractor had applied for the Water
Discharge License. The approval was awaited. |
|
|
2. |
The Contractor was reminded
to provide bunding/preventive measures along the trapezoidal channel to
prevent waste/waste water from entering the drainage system. |
|
|
3. |
Water pondings were found in the construction area
near the sorting plant and at the open area of Area A. The Contractor was
reminded to fill the areas or remove the stagnant water. |
|
|
4. |
Fugitive dust was observed during sorting
activities at Area A. The Contractor was reminded to implement sufficient
dust suppression measures during dusty operation. |
|
|
5. |
Stagnant water was found
inside u-channel at area B2 and the trapezoidal channel. The Contractor was
reminded to clear the stagnant water. |
|
|
6. |
Paint buckets placed on bare
ground had been removed. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
An open hole was found on
drip tray for generator set at the sorting plant. The Contractor was reminded
to seal the hole on drip tray. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
13 July 2006 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
61 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The Contractor had applied for the Water
Discharge License. The approval was awaited. |
|
|
2. |
Rubbish was found runoff into
the trapezoidal channel. The Contractor was reminded to provide
bunding/preventive measures along the trapezoidal channel to prevent
waste/waste water from entering the drainage system. |
|
|
3. |
Water ponding at the open area of Area A had been
removed. Water ponding was still found in the construction area near the
sorting plant. The Contractor was reminded to fill the area or remove the
stagnant water. |
|
|
4. |
Water sprinklers were in operation at the tipping
hall. Fugitive dust was observed along the haul road and during sorting
activities at the open area of Area A. The Contractor was reminded to
increase the frequency of dampening the haul road and implement sufficient
dust suppression measures during dusty operation. |
|
|
5. |
Small amount of rubbish and
stagnant water was found inside u-channel at area B2 and the trapezoidal
channel. The Contractor was reminded to clear the stagnant water and the
rubbish. |
|
|
6. |
Drip tray with an open hole
near the sorting plant had been replaced. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
Some waste oil drums and oil
buckets were found placed on bareground near the tipping hall. The Contractor
was reminded to remove the chemical containers or store the chemicals in the
chemical storage. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
20 July 2006 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
64 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The Contractor had applied for the Water
Discharge License. The approval was awaited. |
|
|
2. |
Rubbish in the trapezoidal
channel had been cleared. The Contractor was reminded to provide
bunding/preventive measures along the trapezoidal channel to prevent
waste/waste water from entering the drainage system. |
|
|
3. |
Water ponding in the construction area near the
sorting plant had been removed. |
|
|
4. |
Fugitive dust was observed along the haul road in
Area A and B2 and during sorting activities at the open area of Area A. The
Contractor advised that 2 water trucks were deployed for dampening the haul
road. The Contractor was still reminded to increase the frequency of
dampening the haul road and implement sufficient dust suppression measures
during dusty operation. |
|
|
5. |
Rubbish inside the u-channel
at area B2 had been cleared. However, silty material was still found inside
the u-channel at area B2 and stagnant water was found in the trapezoidal
channel. The Contractor was reminded to clear the stagnant water and the
silty material. |
|
|
6. |
Waste oil drums and oil
buckets near the tipping hall had been removed. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
Stockpiles of general refuse
/ collected waste were found at Area B1 near the Contractor’s site office.
The Contractor was reminded to fence off the waste collection area at Area
B1. |
|
|
8. |
Two excavators operating in Area A were found
with the flap/cover opened. The Contractor was reminded to close the flap of
all plants on site during operation. |
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
27 July 2006 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
66 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The Contractor had applied for the Water
Discharge License. The approval was awaited. |
|
|
2. |
The Contractor was reminded
to provide bunding/preventive measures along the trapezoidal channel to
prevent waste water from entering the drainage system. |
|
|
3. |
Fugitive dust was not observed along the haul
road in Area A and B2. However, fugitive dust was observed during sorting
activities at the open area of Area A and during concrete breaking near the
tipping hall. The Contractor was reminded to implement sufficient dust
suppression measures during dusty operation. |
|
|
4. |
Clearing of silty material
inside the u-channel at area B2 was observed. Stagnant water was still found
in the trapezoidal channel. The Contractor was reminded to clear the stagnant
water in the trapezoidal channel. |
|
|
5. |
Stockpiles of general refuse
/ collected waste at Area B1 near the Contractor’s site office had been
removed. |
|
|
6. |
One breaker was found operating in Area A without
the cover. The Contractor was reminded to provide cover to all plants on site
during operation. |
|
|
|
|
|
|
|
New Observation |
|
|
7. |
Dark smoke was found emitted
from a Loader operating at Area A. The Contractor was reminded to well
maintain the on site equipment. |
|
|
|
|
|
|
|
|
|
|
|
Nil |