Site Inspection Summary
Date: |
4 May 2007 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
146 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Due to rain event, no fugitive dust was observed at non-inert
stockpile in Area A. |
|
|
2. |
No dark smoke was observed emitted from plants. |
|
|
|
|
|
|
|
New Observations |
|
|
3. |
The Contractor was reminded to clear the accumulated mud along the
edge of the access bridge (near the sorting plant) over the trapezoidal
channel in Area A. |
|
|
4. |
The Contractor was advised to relocate the blower for mist spraying
for excavation works next to the VGF tipping hall to a lower position to
increase the effectiveness of dust suppression. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
10 May 2007 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
148 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The Contractor was reminded to clear the accumulated mud along the
edge of the access bridge (near the sorting plant) over the trapezoidal
channel in Area A. |
|
|
2. |
The Contractor had relocated the blower for mist spraying for
excavation works next to the VGF tipping hall to a lower position. The
excavation area appeared wet. |
|
|
|
|
|
|
|
New Observation |
|
|
3. |
Minor fugitive dust was observed during dumping of non-inert waste at
Area A. The Contractor was advised to improve the water spraying at the
non-inert stockpile and to provide longer water spraying time to the load of
the trucks at the weigh-bridge in Area B1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
17 May 2007 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
150 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The accumulated mud along the edge of the access bridge (near the
sorting plant) had been cleared. |
|
|
2. |
Minor fugitive dust was observed during dumping and sorting of
non-inert waste at Area A. The Contractor was advised to improve the water
spraying at the non-inert stockpile and to provide longer water spraying time
to the load of the trucks at the weigh-bridge in Area B1 during dry weather. |
|
|
|
|
|
|
|
New Observations |
|
|
3. |
Oil stain and used batteries were found placed on bareground in Area
B1 near the workshop. The Contractor was reminded to properly store the
chemicals and batteries on site and clear the oil stain. |
|
|
4. |
Haul road at Area B1 behind the Contractor’s site office, at Area B2
and parts of haul road at Area A were found dry and dusty. Fugitive dust was
observed during vehicles movement. The Contractor was reminded to increase
the frequency of water spraying by water browser along the haul road or
extend the water sprinklers system for all haul roads on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
23 May 2007 |
Time: |
10:15 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
152 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
No fugitive dust was observed during sorting of non-inert waste at
Area A. |
|
|
2. |
Oil stain and used batteries found placed on bareground in Area B1 had
been removed. |
|
|
3. |
Haul road at Area B1 behind the Contractor’s site office, at Area B2
and parts of haul road at Area A were dampened. No fugitive dust was observed
during vehicles movement. |
|
|
|
New Observations |
|
|
4. |
Mud was found deposited along the access road in Area B2. Clearing of
the mud by BobCat was in progress. The Contractor was reminded to clear the
deposited mud along the access road frequently during wet season. |
|
|
5. |
Stagnant muddy water was observed inside the trapezoidal channel in
Area A. The Contractor was reminded to desilt the muddy water prior to
discharge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
31 May 2007 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
154 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Haul road at Area B1 behind the Contractor’s site office had been
dampened, minor fugitive dust was observed at Area B2 and parts of haul road
at Area A during vehicles movement. |
|
|
2. |
Mud deposited along the access road in Area B2 had been cleared. |
|
|
3. |
Mud was found deposited inside the trapezoidal channel in Area A. The
Contractor was reminded to clear the mud to prevent muddy water discharge. |
|
|
|
New Observation |
|
|
4. |
Dark smoke was observed emitted from a loader in Area B1. The
Contractor was reminded to properly maintain the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |