Interim Notifications of Environmental Quality Limits Exceedances

 

 

Incident Report on Action Level or Limit Level Non-compliance

 

Project

Contract No. CV/2004/13

Construction Waste Sorting Facilities at Tseung Kwan O Area 137 and Tuen Mun Area 38

Sampling Date

7 May 2007

Time

09:00 – 09:00

Monitoring Location

TKO2

Parameter

24-hr TSP

Action / Limit Level

260 / 260 µg/m3

Measured Level

275.9µg/m3

Major Construction Dust Source(s) During Measurement

·         Vehicles movement inside the CWSF.

Observed Construction Activities from Other Construction Site

·         Vehicles movement inside the Fill Bank.

Possible reason for Action / Limit Level Non-compliance

·         Major dust source was from dump truck traffic at the haul road behind the Contractor’s site office at Area B1 (Part of the haul road behind the Contractor’s site office was used and maintained by the Fill Bank, while the rest was maintained by the CWSF).

Actions taken / to be taken

·         The Contractor was advised to use the water hose or sprinklers for water spraying at the haul road behind the Contractor’s site office at Area B1;

·         One additional monitoring on 24-hr TSP had been arranged on 16 May 2007 to review the effectiveness of the mitigation measures.

ET Advice

·         Increase water spraying frequency at works area and all haul road especially during dry or sunny weather, including the haul road behind the site office at Area B1, being used by dump truck from the Project;

·         Regularly clear the deposited silt on the haul road behind the Contractor’s site office at Area B1;

·         Ensure wheel-wash is provided to all dump trucks leaving the site using site exit at Area B1;

·         Ensure the area near the site exit and all the haul roads to be sufficiently dampened;

·         Advise the dump truck drivers to travel on the dampened haul roads.

Remarks

·         Nil