Site Inspection Summary

 

Inspection Information

Date:

2 August 2007

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

172

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Most of the mud in the trapezoidal channel in Area A had been cleared. The Contractor was still reminded to clear the remaining mud inside the trapezoidal channel under the access bridge next to the Engineer’s Site Office.

 

 

2.

Minor fugitive dust was observed during dumping and manual sorting of non-inert waste in Area A and during vehicle movement along the haul road. The Contractor was reminded to increase water spraying frequency by water truck or provide more water sprinklers for dust suppression.

 

 

3.

No dark smoke was emitted from the excavator (C3) at Area A. (Closed)

 

 

4.

The removal of deposited mud and refuse inside the catchpit and u-channel in Area B2 was in progress. The Contractor was reminded to clear the remaining mud inside the catchpit and u-channel to avoid blockage.

444

 

 

 

New Observations

 

 

5.

General refuse was found accumulated near the site exit at Area B1. The Contractor was advised to clear the refuse.

 

 

6.

General refuse was found inside the desilting pits and u-channel next to the trapezoidal channel at Area A. The Contractor was advised to clear the refuse and maintain the drainage system properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

8 August 2007

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

174

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Minor fugitive dust was observed during dumping and manual sorting of non-inert waste in Area A and during vehicle movement along the haul road in Area A. The Contractor was reminded to increase water spraying frequency by water truck or provide more water sprinklers for dust suppression.

 

 

2.

The removal of general refuse near the site exit in Area B1 was in progress. The Contractor was still reminded to clear the refuse to avoid accumulation.

 

 

3.

Deposited mud and general refuse inside catchpit and u-channel in Area B2 had been cleared. (Closed)

4.

General refuse inside the desilting pits and u-channel next to the trapezoidal channel at Area A had been cleared. (Closed)

5.

Stagnant water and deposited mud was found inside the trapezoidal channel in Area A. The Contractor was reminded to clear the stagnant water and deposited mud.

 

New Observations

 

 

6.

Dark smoke was observed emitted from a bulldozer at Area A. The Contractor was reminded to properly maintain the plant on site.

 

 

7.

Mud was found deposited on part of the access road in Area B2. The Contractor was reminded to clear the deposited mud along the access road frequently during wet season.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

1.

Typhoon signal No.1 was hoisted during the site inspection.

 


Site Inspection Summary

 

Inspection Information

Date:

16 August 2007

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

176

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

No fugitive dust was observed during dumping and manual sorting of non-inert waste and during vehicle movement along the haul road in Area A due to heavy rainfall during the inspection. (Closed)

 

 

2.

No dark smoke was emitted from the bulldozer at Area A. (Closed)

 

 

3.

The removal of general refuse near the site exit in Area B1 was in progress. The Contractor was still reminded to clear the refuse to avoid accumulation.

 

4.

Deposited mud was left inside the trapezoidal channel under the access bridge next to CEDD’s site office in Area A. Waterflow was observed and no stagnant water was observed inside the trapezoidal channel in Area A due to heavy rainfall during the inspection. The Contractor was still reminded to clear the deposited mud.

5.

Mud was found deposited on part of the access road in Area B2. The Contractor was still reminded to clear the deposited mud along the access road frequently during the wet season.

 

New Observations

 

 

6.

Oil stain was found on ground in Area B1. The Contractor was reminded to clear the oil stain and contaminated soil/ aggregates and dispose of as chemical waste.

 

 

7.

General refuse was found inside the u-channel in Area B2 and Area A. The Contractor was advised to clear the refuse.

 

 

8.

Muddy water was observed discharged directly into the trapezoidal channel from the opening under the access bridge next to CEDD’s site office. The Contractor was requested to provide bunding along the trapezoidal channel to divert the muddy water to the desilting facilities prior to discharge.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

23 August 2007

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

178

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

The bunding along the trapezoidal channel next to CEDD’s site office was provided to divert the muddy water to the desilting facilities prior to discharge. (Closed)

 

 

2.

The oil stain on ground in Area B1 was cleared. (Closed)

 

 

3.

The removal of general refuse near the site exit in Area B1 was in progress. The Contractor was reminded to clear the refuse to avoid accumulation.

 

 

4.

The removal of general refuse inside the u-channel in Area B2 was in progress. The Contractor was reminded to clear the refuse to avoid accumulation.

 

 

5.

The removal of deposited mud on part of the access road in Area B2 was in progress. The Contractor was reminded to clear the deposited mud along the access road frequently during the wet season.

6.

Deposited mud was still left inside the trapezoidal channel under the access bridge next to CEDD’s site office in Area A. The Contractor was reminded to clear the deposited mud.

 

New Observations

 

 

7.

General refuse was found inside the catchpit in Area B2. The Contractor was advised to clear the refuse.

 

 

8.

Stagnant water and general refuse was found inside the trapezoidal channel in Area A. The Contractor was reminded to clear the stagnant water and the refuse.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

Site Inspection Summary

 

Inspection Information

Date:

30 August 2007

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

180

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow-up Observations

 

 

1.

The general refuse inside the catchpit in Area B2 was cleared. (Closed)

 

 

2.

The removal of general refuse near the site exit in Area B1 was in progress. The Contractor was reminded to clear the refuse to avoid accumulation.

 

 

3.

The removal of general refuse inside the u-channel in Area B2 was in progress. The Contractor was reminded to clear the refuse to avoid accumulation.

 

 

4.

The removal of deposited mud on part of the access road in Area B2 was in progress. The Contractor was reminded to clear the deposited mud along the access road frequently during the wet season.

 

 

5.

Deposited mud was still left inside the trapezoidal channel under the access bridge next to CEDD’s site office in Area A. The Contractor was reminded to clear the deposited mud.

6.

Stagnant water and general refuse was still found inside the trapezoidal channel in Area A. The Contractor was reminded to clear the stagnant water and the refuse.

 

New Observations

 

 

7.

Deposited mud was found inside the desilting pit in Area A. The Contractor was reminded to clear the deposited mud.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

Nil