1.1
This is the ninth Quarterly Environmental Monitoring and
Audit (EM&A) Summary Report for the Temporary Construction Waste Sorting
Facility at Tseung Kwan O Area 137 (the Project).
This report presents a summary of the environmental monitoring and auditing
works carried out by the ET for the Project for the period from November 2007
to January 2008.
Project Organization and Contacts of Key
Management
1.2
The project organization is shown in Appendix A. The key
personnel contact names and numbers are summarised in Table 1.1
Table 1.1 Contact
Information of Key Personnel
Party |
Position |
Name |
Telephone |
Fax |
CEDD |
Engineer |
Mr. Lawrence Ng |
2762 5582 |
2714 0113 |
IC(E) (MateriaLab) |
IC(E) |
Mr. Joseph Poon |
2450 8238 |
2450 6138 |
Contractor (Paul Y -CREC(HK) JV) |
Project
Manager |
Mr.
Joe Au |
9378 3331 |
2623 9426 |
Project Engineer
(TKO137) |
Mr. Robert Lui |
9588 2485 |
-- |
|
ET (ENSR) |
ET Leader |
Mr. Y T Tang |
3105 8537 |
2891 0305 |
1.3
The construction phase under Contract CV/2004/13 – Temporary
Construction Waste Sorting Facility at Tseung Kwan O
Area 137 commenced on
l
Operation of Construction Waste Sorting Facilities
(CWSF) by mechanical sorting plant;
l
Modification of road hump along haul road in Portions
A and B2;
l
Modification
of water sprinklers at Red Zone and haul road in Portion B2;
l
Modification
of tarpaulin sheeting cover to the mechanical sorting plant as fugitive dust
preventive measures;
l
Setting
up of additional area Portion B3 to facilitate night work operation of the Sorting
Facility;
l
Replacement
of tubular railing of drainage chamber;
l
Disposal
of sorted waste to Landfills and Fill Banks; and
l
Maintenance
work for haul road and mechanical sorting plants.
1.4
The general layout plan of the Project sites showing the contract
areas are shown in Figure 1.1.
1.5
The construction programme is provided in Appendix B.