5.1
Environmental monitoring of air quality (1-hr TSP and 24-hr
TSP) for the Project was performed in March 2008. There was no
exceedance of 1-hour and 24-hour TSP monitoring recorded in the reporting month.
5.2
Environmental site inspections were conducted 4 times
in the reporting month. Due to the dry weather conditions, minor
fugitive dust was occasionally observed during dumping and manual
sorting at the non-inert stockpile at Area A. The Contractor was reminded to
provide longer water spraying time to the load at the weigh-bridge at Area B1.
The Contractor was also reminded to properly maintain the plants on site to
prevent any dark smoke emission.
5.3
No environmental complaint, non-compliance or prosecutions
or notifications of summons were received in the reporting month.
5.4
According to the environmental site inspections performed in
the reporting month, the following recommendations were provided:
Air Quality
·
Ensure the frequency of water spraying on haul roads,
unloading areas and stockpiles to be sufficient to suppress the dust sources;
·
Provide proper maintenance for the powered mechanical
equipment and barges to avoid emission of dark smoke;
·
Provide water spraying onto the truckloads during inspection
of fill material;
·
Conduct road sweeping on the public
road and the main haul roads outside and near the site egress by the road
sweeper;
·
Undertake water spraying on
stockpiling area by water bowers;
·
Erect adequate speed limit signs to
advise the truck drivers of the speed limit;
·
Operate mist spraying systems and automatic water sprinklers
in the temporary CWSF;
·
Implement
the dust mitigation measures for the construction activities;
·
Designate proper haul roads to ensure effective water
spraying; and
·
Ensure all vehicles to be washed before leaving the site
egress by provision, operation and maintenance of automatic wheel washing
facilities.
Construction Noise
·
Conduct noisy activities at a farther location from the NSR.
Water Quality
·
Maintain the drainage system, including the trapezoidal
channels;
·
Operate and maintain the treatment system for the site
toilet; and
·
Remove the stagnant water or provide pesticide for the
stagnant water in the permanent desilting chambers, if any.
Chemical and Waste Management
·
Remove waste materials from site regularly to avoid
accumulation;
·
Handle and store chemical wastes properly;
·
Remove unwanted material in the existing stockpiles and
avoid further dumping of such material;
·
Provide and maintain sufficient drip trays for diesel drums,
chemical containers, chemical waste storage drums and diesel operated generator
set;
·
Maintain good housekeeping at the workshop area;
·
Ensure sufficient tarpaulin sheets are provided to cover
drip trays;
·
Avoid soil being polluted during oil filling and equipment
maintenance; hence, properly remove and store the contaminated soil, if any,
and
·
Provide a proper chemical waste store.
Landscape and Visual
·
Erect all the site hoardings/chaining fences in accordance