Site Inspection Summary
Date: |
6 March 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
234 |
|
Nil |
|
|
|
Follow-up Observations |
|
|
1. |
Deposited silt and mud inside the trapezoidal channel in Area A had
been removed. (Closed) |
|
|
2. |
Oil stains on the VGF tipping hall had been cleared. (Closed) |
|
|
|
New Observations |
|
|
3. |
Oil stains were found on ground near the sub-contractor site office at
Area B1. The Contractor was reminded to clear the oil stains / contaminated
soil and dispose of as chemical waste. |
|
|
4. |
Minor fugitive dust was observed during dumping
and manual sorting at the non-inert stockpile at Area A. The Contractor was
reminded to provide longer water spraying time to the load at the
weigh-bridge at Area B1. |
|
|
|
|
|
|
Nil |
|
Site Inspection Summary
Date: |
12 March 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
236 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Oil stains on ground near the sub-contractor site office at Area B1
had been cleared. (Closed) |
|
|
2. |
No fugitive dust was observed during dumping and manual sorting at the
non-inert stockpile at Area A. More sprinklers had been provided for dust suppression
at Area A. (Closed) |
|
|
|
New Observations |
|
|
3. |
Minor fugitive dust was observed at Area B3. The Contractor was
reminded to provide water spraying for dust suppression during dry weather at
the unpaved area of Area B3. |
|
|
4. |
Accumulation of silt was observed inside a desilting pit next to
trapezoidal channel in Area A. The Contractor was reminded to remove the silt
regularly and properly maintain the drainage system.. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
19 March 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
238 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
No fugitive dust was observed at Area B3. However, the Contractor was
still reminded to provide water spraying for dust suppression during dry
weather at the unpaved area of Area B3. |
|
|
2. |
Accumulated silt inside the desilting pit next to trapezoidal channel
in Area A had been cleared. (Closed) |
|
|
|
New Observations |
|
|
3. |
General refuse was observed inside the U-channel in Area B2 and a
desilting pit in Area A. The Contractor was reminded to remove the refuse and
properly maintain the drainage system. |
|
|
4. |
Dark smoke was observed emitting from an excavator (C6) in Area A. The
Contractor was reminded to properly maintain the plant on site. |
|
|
5. |
Minor fugitive dust was observed during unloading by a dump truck at
VGF in Area A. The Contractor was reminded to increase the water spraying
time at the VGF after unloading. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
26 March 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
240 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
No fugitive dust was observed at Area B3 and the ground was wet.
(Closed) |
|
|
2. |
General refuse inside the U-channel in Area B2 and the desilting pit
in Area A had been cleared. (Closed) |
|
|
3. |
The Contractor had provided water spraying at the VGF during unloading
by dump trucks, tipping hall in Area A and at weigh bridge in Area B1. No
fugitive dust was observed. (Closed) |
|
|
4. |
Dark smoke was observed emitting from an excavator (C6) and a dozer
(D2) at the non-inert stockpile in Area A. The Contractor was requested to properly
maintain the plant on site. |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |