Site Inspection Summary
Date: |
3 April 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
242 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
No dark smoke was observed emitted from excavator (C6) and dozer (D2)
at the non-inert stockpile in Area A. (Closed) |
|
|
|
New Observation |
|
|
2. |
Silt was found accumulated inside a desilting pit near the CEDD site
office next to the trapezoidal channel in Area A. The Contractor was reminded
to clear the mud more frequently to prevent muddy runoff. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
9 April 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
244 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
Deposited silt inside the desilting pit near the CEDD site office next
to the trapezoidal channel in Area A had been cleared. (Closed) |
|
|
|
New Observation |
|
|
2. |
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
16 April 2008 |
Time: |
10:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
246 |
|
Nil |
|
|
|
Follow up Observation |
|
|
|
Nil |
|
|
|
New Observations |
|
|
1. |
Oil spillage was found from the drip tray under generator no.1 (友興) in Area B1 and oil stain was observed under an
excavator (C7) next to the trapezoidal channel in Area A. The Contractor was
requested to clear the oil stain, seal the drip tray and properly maintain
the plants on site. |
|
|
2. |
Deposited silt was observed accumulated in the trapezoidal channel in
Area A. The Contractor was reminded to clear the silt regularly. |
|
|
3. |
Minor fugitive dust was observed during vehicle movement along the
haul road in Area B2 near the access bridge. The Contractor was reminded to
provide water spraying at the area, particularly during sunny and dry
weather. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
24 April 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
248 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The drip tray under generator no.1 (友興) in Area B1 had been repaired and the oil stain under excavator (C7)
next to the trapezoidal channel in Area A had been cleared. (Closed) |
|
|
2. |
Deposited silt was still observed in the trapezoidal channel in Area
A. The Contractor was reminded to clear the silt more frequently, especially
in rainy season. |
|
|
3. |
Haul road in Area B2 appeared wet. No fugitive dust was observed
during vehicle movement along the haul road in Area B2 near the access
bridge. (Closed) |
|
|
|
New Observation |
|
|
4. |
General refuse was observed in Area B1 next to Contractor’s site
office and inside the U-channel in Area B2. The Contractor was reminded to
remove the refuse and properly maintain the drainage system. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |
Site Inspection Summary
Date: |
30 April 2008 |
Time: |
14:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
250 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Deposited silt in the trapezoidal channel in Area A had been cleared.
(Closed) |
|
|
2. |
General refuse in Area B1 next to Contractor’s site office and inside
the U-channel in Area B2 had been removed. (Closed) |
|
|
|
New Observation |
|
|
3. |
Scrap metal was stockpiled underneath the VGF tipping hall in Area A.
The Contractor was advised to remove the scrap metal off site for recycling. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil. |