Site Inspection Summary

 

Inspection Information

Date:

3 April 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

242

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

No dark smoke was observed emitted from excavator (C6) and dozer (D2) at the non-inert stockpile in Area A. (Closed)

 

 

 

New Observation

 

 

2.

Silt was found accumulated inside a desilting pit near the CEDD site office next to the trapezoidal channel in Area A. The Contractor was reminded to clear the mud more frequently to prevent muddy runoff.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

9 April 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

244

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Deposited silt inside the desilting pit near the CEDD site office next to the trapezoidal channel in Area A had been cleared. (Closed)

 

 

 

New Observation

 

 

2.

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

16 April 2008

Time:

10:00

Site:

Tseung Kwan O Area 137

Inspection No.:

246

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

 

Nil

 

 

 

New Observations

 

 

1.

Oil spillage was found from the drip tray under generator no.1 (友興) in Area B1 and oil stain was observed under an excavator (C7) next to the trapezoidal channel in Area A. The Contractor was requested to clear the oil stain, seal the drip tray and properly maintain the plants on site.

 

 

2.

Deposited silt was observed accumulated in the trapezoidal channel in Area A. The Contractor was reminded to clear the silt regularly.

 

 

3.

Minor fugitive dust was observed during vehicle movement along the haul road in Area B2 near the access bridge. The Contractor was reminded to provide water spraying at the area, particularly during sunny and dry weather.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

24 April 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

248

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

The drip tray under generator no.1 (友興) in Area B1 had been repaired and the oil stain under excavator (C7) next to the trapezoidal channel in Area A had been cleared. (Closed)

 

 

2.

Deposited silt was still observed in the trapezoidal channel in Area A. The Contractor was reminded to clear the silt more frequently, especially in rainy season.

 

 

3.

Haul road in Area B2 appeared wet. No fugitive dust was observed during vehicle movement along the haul road in Area B2 near the access bridge. (Closed)

 

 

 

New Observation

 

 

4.

General refuse was observed in Area B1 next to Contractor’s site office and inside the U-channel in Area B2. The Contractor was reminded to remove the refuse and properly maintain the drainage system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.

 


Site Inspection Summary

 

Inspection Information

Date:

30 April 2008

Time:

14:30

Site:

Tseung Kwan O Area 137

Inspection No.:

250

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Deposited silt in the trapezoidal channel in Area A had been cleared. (Closed)

 

 

2.

General refuse in Area B1 next to Contractor’s site office and inside the U-channel in Area B2 had been removed. (Closed)

 

 

 

New Observation

 

 

3.

Scrap metal was stockpiled underneath the VGF tipping hall in Area A. The Contractor was advised to remove the scrap metal off site for recycling.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil.