Site Inspection Summary
Date: |
6 June 2008 |
Time: |
16:30 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
260 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
General refuse inside the trapezoidal channel in Area A2 had been
cleared. (Closed) |
|
|
2. |
Sand bund was found provided along the edge of the trapezoidal channel
in Area A2. However, the Contractor was still recommended to provide sandbags
to prevent site runoff from entering the drainage system. |
|
|
|
New Observations |
|
|
3. |
Excavators C7 and C13 next to the trapezoidal channel in Area A were
expected to undergo maintenance for weeks. The Contractor was reminded to
provide tarpaulin sheets under the plants. (Reminder) |
|
|
4. |
The u-channel next to the trapezoidal channel in Area A was found
blocked and muddy water was overflowed into the trapezoidal channel directly
without passing the desilting pit. The Contractor was requested to clear the
blockage in the U-channel and properly maintain the drainage system, particularly
during wet season. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
11 June 2008 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
262 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Sand bund was found provided along the edge of the trapezoidal channel
in Area A2. However, the Contractor was still recommended to provide sandbags
to prevent any silty runoff from entering the trapezoidal channel. |
|
|
2. |
No tarpaulin sheet was provided to excavators C7 and C13 next to the
trapezoidal channel in Area A and oil stain was observed under excavator C7.
The Contractor was reminded to provide tarpaulin sheets under the plants,
clear the oil stain and dispose of the contaminated soil as chemical waste. |
|
|
3. |
The blockage in the u-channel next to the trapezoidal channel in Area
A had been removed. (Closed) |
|
|
|
|
|
|
|
New Observation |
|
|
4. |
Deposited silt was observed accumulated in the desilting pit next to
the trapezoidal channel in Area A next to the CEDD site office. The
Contractor was reminded to clear the silt more frequently during rainy
season. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
19 June 2008 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
264 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Sand bund was found provided along the edge of the trapezoidal channel
in Area A2. However, site runoff was observed discharged directly to the
trapezoidal channel. The Contractor was requested to provide proper desilting
facility to Area A2 or divert the site runoff to desilting pit in Area A as
soon as possible. |
|
|
2. |
Excavator C7 next to the trapezoidal channel in Area A had been
removed and a bucket was provided underneath excavator C13. Oil stain under
excavator C7 has been cleared. (Closed) |
|
|
3. |
Deposited silt was still observed accumulated in the desilting pit
next to the trapezoidal channel in Area A next to the CEDD site office. The
Contractor was reminded to clear the silt more frequently during rainy
season. |
|
|
|
|
|
|
|
New Observations |
|
|
4. |
Oil stains were observed beside generator no.1 (友興) next to the Contractor’s site office in Area
B1. The Contractor was reminded to clear the oil stains and disposed of the
contaminated soil as chemical waste. |
|
|
5. |
General refuse was observed inside the u-channel in Area B2. The
Contractor was reminded to remove the refuse and properly maintain the
drainage system. |
|
|
6. |
A hole was found on the drip tray under a generator on the VGF tipping
hall in Area A. The Contractor was requested to seal the hole on the drip
tray to prevent oil leakage. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
26 June 2008 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
266 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Sand bund and temporary channel leading to a temporary soakaway pit
was provided along the edge of the trapezoidal channel in Area A2. Minor site
runoff without treatment was found discharged to the trapezoidal channel. The
Contractor was reminded to provide proper drainage system to collect the site
runoff water to prevent untreat runoff, divert all site runoff to soakaway
pits or divert all treated runoff to designated discharge point for
discharge. |
|
|
2. |
Deposited silt was still observed accumulated in the desilting pit in
Area A next to the CEDD site office. The Contractor was reminded to clear the
silt more frequently during rainy season. |
|
|
3. |
Oily water was observed beside generator no.1 (友興) next to the Contractor’s site office in Area
B1. The Contractor was reminded to clear the oily water and disposed of as
chemical waste. |
|
|
4. |
Deposited silt and general refuse were observed inside the u-channel
in Area B2. The Contractor was reminded to remove the silt and refuse, and
properly maintain the drainage system. |
|
|
5. |
The hole on the drip tray under a generator on the VGF tipping hall in
Area A had been sealed up. (Closed) |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |