Site Inspection Summary

 

Inspection Information

Date:

6 June 2008

Time:

16:30

Site:

Tseung Kwan O Area 137

Inspection No.:

260

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

General refuse inside the trapezoidal channel in Area A2 had been cleared. (Closed)

 

 

2.

Sand bund was found provided along the edge of the trapezoidal channel in Area A2. However, the Contractor was still recommended to provide sandbags to prevent site runoff from entering the drainage system.

 

 

 

New Observations

 

 

3.

Excavators C7 and C13 next to the trapezoidal channel in Area A were expected to undergo maintenance for weeks. The Contractor was reminded to provide tarpaulin sheets under the plants. (Reminder)

 

 

4.

The u-channel next to the trapezoidal channel in Area A was found blocked and muddy water was overflowed into the trapezoidal channel directly without passing the desilting pit. The Contractor was requested to clear the blockage in the U-channel and properly maintain the drainage system, particularly during wet season.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

11 June 2008

Time:

15:00

Site:

Tseung Kwan O Area 137

Inspection No.:

262

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Sand bund was found provided along the edge of the trapezoidal channel in Area A2. However, the Contractor was still recommended to provide sandbags to prevent any silty runoff from entering the trapezoidal channel.

 

 

2.

No tarpaulin sheet was provided to excavators C7 and C13 next to the trapezoidal channel in Area A and oil stain was observed under excavator C7. The Contractor was reminded to provide tarpaulin sheets under the plants, clear the oil stain and dispose of the contaminated soil as chemical waste.

 

 

3.

The blockage in the u-channel next to the trapezoidal channel in Area A had been removed. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

4.

Deposited silt was observed accumulated in the desilting pit next to the trapezoidal channel in Area A next to the CEDD site office. The Contractor was reminded to clear the silt more frequently during rainy season.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

19 June 2008

Time:

15:00

Site:

Tseung Kwan O Area 137

Inspection No.:

264

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Sand bund was found provided along the edge of the trapezoidal channel in Area A2. However, site runoff was observed discharged directly to the trapezoidal channel. The Contractor was requested to provide proper desilting facility to Area A2 or divert the site runoff to desilting pit in Area A as soon as possible.

 

 

2.

Excavator C7 next to the trapezoidal channel in Area A had been removed and a bucket was provided underneath excavator C13. Oil stain under excavator C7 has been cleared. (Closed)

 

 

3.

Deposited silt was still observed accumulated in the desilting pit next to the trapezoidal channel in Area A next to the CEDD site office. The Contractor was reminded to clear the silt more frequently during rainy season.

 

 

 

 

 

 

 

New Observations

 

 

4.

Oil stains were observed beside generator no.1 (友興) next to the Contractor’s site office in Area B1. The Contractor was reminded to clear the oil stains and disposed of the contaminated soil as chemical waste.

 

 

5.

General refuse was observed inside the u-channel in Area B2. The Contractor was reminded to remove the refuse and properly maintain the drainage system.

 

 

6.

A hole was found on the drip tray under a generator on the VGF tipping hall in Area A. The Contractor was requested to seal the hole on the drip tray to prevent oil leakage.

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

26 June 2008

Time:

15:00

Site:

Tseung Kwan O Area 137

Inspection No.:

266

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Sand bund and temporary channel leading to a temporary soakaway pit was provided along the edge of the trapezoidal channel in Area A2. Minor site runoff without treatment was found discharged to the trapezoidal channel. The Contractor was reminded to provide proper drainage system to collect the site runoff water to prevent untreat runoff, divert all site runoff to soakaway pits or divert all treated runoff to designated discharge point for discharge.

 

 

2.

Deposited silt was still observed accumulated in the desilting pit in Area A next to the CEDD site office. The Contractor was reminded to clear the silt more frequently during rainy season.

 

 

3.

Oily water was observed beside generator no.1 (友興) next to the Contractor’s site office in Area B1. The Contractor was reminded to clear the oily water and disposed of as chemical waste.

 

 

4.

Deposited silt and general refuse were observed inside the u-channel in Area B2. The Contractor was reminded to remove the silt and refuse, and properly maintain the drainage system.

 

 

5.

The hole on the drip tray under a generator on the VGF tipping hall in Area A had been sealed up. (Closed)

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil