Site Inspection Summary

 

Inspection Information

Date:

6 May 2008

Time:

15:00

Inspection No.:

006

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Oil container at Row D had been removed. (Closed)

 

 

2.

Construction waste at Row E had been sorted. C&D materials were sorted out for reuse on-site. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

3.

Small amount of construction waste and general refuse was found on slope of Row O. The Contractor was reminded to clear the waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

13 May 2008

Time:

15:00

Inspection No.:

007

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Construction waste and general refuse on slope of Row O had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

2.

Mud and construction waste was found inside the u-channel at Row J. The Contractor was reminded to clear the waste to prevent blockage of the drainage system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

20 May 2008

Time:

15:00

Inspection No.:

008

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observation

 

 

1.

Mud and construction waste inside the U-channel in Row J had been cleared. However, leaves were found inside in the U-channel. The Contractor was reminded to clear the leaves.

 

 

 

New Observations

 

 

2.

Drill rigs at Row I, Row J and Row P were found without drip trays. The Contractor was reminded to provide drip trays to the plants on site.

 

 

3.

Mud was found accumulated inside the U-channel at Row P. The Contractor was reminded to clear the mud to prevent muddy water discharge during rainfall.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

27 May 2008

Time:

15:00

Inspection No.:

009

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow-up Observations

 

 

1.

Leaves found inside the U-channel at Row J had been cleared. (Closed)

 

 

2.

Drip trays had been provided to the drill rigs at Row I, Row J and Row P. (Closed)

 

 

3.

The mud found inside the U-channel at Row P had been cleared. (Closed)

 

 

 

New Observations

 

 

4.

The soil nail workstation at Row O was not fully enclosed. Although immediate action had been taken to provide tarpaulin sheet for covering the soil nail extraction outlet, the Contractor was still reminded to fully enclose the workstation.

 

 

5.

C&D materials were observed scattered on the slope between Row O and Row P. The Contractor was reminded to properly collect and recycle the materials.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil