Site Inspection Summary
Date: |
6 May 2008 |
Time: |
15:00 |
Inspection No.: |
006 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Oil container at Row D had been removed.
(Closed) |
|
|
2. |
Construction waste at Row E had been
sorted. C&D materials were sorted out for reuse on-site. (Closed) |
|
|
|
|
|
|
|
New Observation |
|
|
3. |
Small amount of construction waste and general refuse was found on
slope of Row O. The Contractor was reminded to clear the waste. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
13 May 2008 |
Time: |
15:00 |
Inspection No.: |
007 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Construction waste and general refuse on slope of Row O had been
cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
|
2. |
Mud and construction waste was found inside the u-channel at Row J.
The Contractor was reminded to clear the waste to prevent blockage of the
drainage system. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
20 May 2008 |
Time: |
15:00 |
Inspection No.: |
008 |
|
Nil |
|
Follow-up Observation |
|
|
1. |
Mud and construction waste inside the U-channel in Row J had been
cleared. However, leaves were found inside in the U-channel. The Contractor
was reminded to clear the leaves. |
|
|
|
New Observations |
|
|
2. |
Drill rigs at Row I, Row J and Row P were found
without drip trays. The Contractor was reminded to provide drip trays to the plants
on site. |
|
|
3. |
Mud was found accumulated inside the U-channel at
Row P. The Contractor was reminded to clear the mud to prevent muddy water
discharge during rainfall. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
27 May 2008 |
Time: |
15:00 |
Inspection No.: |
009 |
|
Nil |
|
Follow-up Observations |
|
|
1. |
Leaves found inside the U-channel at Row J had been cleared. (Closed) |
|
|
2. |
Drip trays had been provided to the drill
rigs at Row I, Row J and Row P. (Closed) |
|
|
3. |
The mud found inside the U-channel at Row P had
been cleared. (Closed) |
|
|
|
New Observations |
|
|
4. |
The soil nail workstation at Row O was not fully enclosed. Although
immediate action had been taken to provide tarpaulin sheet for covering the
soil nail extraction outlet, the Contractor was still reminded to fully
enclose the workstation. |
|
|
5. |
C&D materials were observed scattered on the slope between Row O
and Row P. The Contractor was reminded to properly collect and recycle the
materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |