Site Inspection Summary
Date: |
5 August 2008 |
Time: |
15:00 |
Inspection No.: |
019 |
|
Nil
|
|
Follow Up Observations |
|
|
1. |
No C&D material was observed placed against the trees in the site. (Closed) |
|
|
2. |
Oil drums at Row R and Row S had been removed. (Closed) |
|
|
3. |
Debris and leaves inside u-channel had been cleared. (Closed) |
|
|
4. |
Water running down the u-channel in the site was clear. No muddy water was observed. (Closed) |
|
|
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil
|
Site Inspection Summary
Date: |
12 August 2008 |
Time: |
15:00 |
Inspection No.: |
020 |
|
Nil
|
|
New Observation |
|
|
1. |
Leaves and debris were observed accumulated inside the u-channel at Row D. The Contractor was reminded the clear the u-channel more frequently. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil
|
Site Inspection Summary
Date: |
19 August 2008 |
Time: |
15:00 |
Inspection No.: |
021 |
|
Nil
|
|
Follow Up Observation |
|
|
1. |
Leaves and debris inside u-channel at Row D had been cleared. However, debris was observed accumulated inside u-channel at Row R. The Contractor was reminded to clear the u-channel more frequently. |
|
|
|
|
|
|
|
New Observation |
|
|
2. |
Soil nail installation controllers were observed placed on ground without drip tray at Row C and Row AF. The Contractor was reminded to provide drip trays to the controllers on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil
|
Site Inspection Summary
Date: |
26 August 2008 |
Time: |
15:00 |
Inspection No.: |
022 |
|
Nil
|
|
Follow Up Observations |
|
|
1. |
Debris inside the u-channel at Row R had been cleared. (Closed) |
|
|
2. |
While the soil nail installation controller at Row AF had been provided with a drip tray, the soil nail installation controller at Row C and an oil drum at Row Y was found placed on ground without drip tray. The Contractor was reminded to provide drip tray to all soil nail installation controllers and chemical containers on site. |
|
|
|
New Observation |
|
|
2. |
Exposed earth was observed around the area of soil nail installation at Row Y and Row AF. The Contractor was advised to clean up the earth as soon as the operation was completed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|