Site Inspection Summary
Date: |
2 September 2008 |
Time: |
15:00 |
Inspection No.: |
023 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
The soil nail installation controller at
Row C and the oil drum at Row Y had been provided with drip trays. (Closed) |
|
|
2. |
Exposed earth around the area of soil nail installation at Row Y and
Row AF had been cleared. (Closed) |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
9 September 2008 |
Time: |
15:00 |
Inspection No.: |
024 |
|
Nil |
|
Follow Up Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
New Observation |
|
|
1. |
Small amount of cement slurry was found run off
into the u-channel at Row R. The Contractor was reminded to clean up the
slurry inside the u-channel and prevent further runoff. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A dead
tree was observed tiled and hanged against another tree next to Row Y. |
Site Inspection Summary
Date: |
16 September 2008 |
Time: |
15:00 |
Inspection No.: |
025 |
|
Nil |
|
Follow Up Observation |
|
|
1. |
Cement slurry inside the u-channel at Row R had been cleared. No
slurry runoff was observed. (Closed) |
|
|
|
|
|
|
|
New Observations |
|
|
2. |
Exposed earth was observed on the slope at Row Y.
The Contractor was reminded to clear the earth. |
|
|
3. |
An oil drum and a soil nail installation controller were found placed
on ground without drip tray at Row Z. The Contractor was reminded to provide
drip trays to all plants and chemical containers on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
23 September 2008 |
Time: |
15:00 |
Inspection No.: |
026 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
The condition of exposed earth on the slope at Row Y was to be
inspected. |
|
|
2. |
The condition of the oil drums and soil
nail installation controller placed on ground at Row Z was to be inspected. |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cyclone
typhoon signal no. 3 was hoisted. Strong wind and heavy rain occurred during
the inspection. No construction activity was taken place. |
Site Inspection Summary
Date: |
30 September 2008 |
Time: |
15:00 |
Inspection No.: |
027 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
Exposed earth was observed on the slope at Row Y and Row Z. The
Contractor was reminded to clear the exposed earth. |
|
|
2. |
Oil drums and oil nail installation
controllers at Row V, Row AA and Row AF were found placed on ground without
drip trays. The Contractor was reminded to provide drip tray to all chemical
containers and plants on site. |
|
|
|
|
|
|
|
New Observations |
|
|
3. |
Deposited silt was observed accumulated inside the u-channel at Row R
and Row V. The Contractor was reminded to clear the u-channel more
frequently. |
|
|
4. |
Sand bags at Row R and Row V were found damaged. The Contractor was
advised to replace the sand bags. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |