Site Inspection Summary

 

Inspection Information

Date:

4 November 2008

Time:

15:00

Inspection No.:

032

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Soil nail installation controllers at Row AF10 and Row PD19 had been provided with drip trays. The chemical container at Row AF10 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

11 November 2008

Time:

15:00

Inspection No.:

033

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

1.

Deposited silt was observed accumulated inside the u-channel at Row T. The Contractor was requested to clear the deposited silt more frequently.

 

 

2.

Soil nail installation controllers and chemical containers were found placed on ground without drip tray at Row AM, Row AO and Row AW. The Contractor was reminded to provide drip trays to all plants and chemical containers on site.

 

 

3.

Exposed earth / sediment was observed accumulated on the slope of Row AR. The Contractor was reminded to clear the earth more frequently.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

18 November 2008

Time:

15:00

Inspection No.:

034

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Deposited silt inside the u-channel at Row T had been cleared. (Closed)

 

 

2.

Soil nail installation controllers and chemical containers at Row AM, Row AO and Row AW had been provided with drip trays. However, two chemical containers at Row AF were found placed on ground without drip tray. The Contractor was reminded to provide drip trays to all chemical containers on site.

 

 

3.

Exposed earth / sediment on the slope of Row AR had been cleared. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

25 November 2008

Time:

15:00

Inspection No.:

035

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

A chemical container at Row AF and on the slope of Row AP respectively was observed placed on ground without drip tray. The Contractor was reminded to provide drip tray to all chemical containers on site.

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil