Site Inspection Summary

 

Inspection Information

Date:

2 December 2008

Time:

15:00

Inspection No.:

036

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The chemical container at the slope of Row AP had been provided with drip tray. However, a chemical container at Row AF and Row AS respectively were placed on ground without drip tray. The Contractor was reminded to provide drip tray to all chemical containers on site.

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

9 December 2008

Time:

15:00

Inspection No.:

037

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The chemical containers at Row AF and Row AS had been provided with drip trays. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

2.

Oil stains were observed on ground and over a drill rig at Row AS. The Contractor was reminded to clear the oil stains and properly maintain the plants on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

16 December 2008

Time:

15:00

Inspection No.:

038

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The oil stains observed, during the last site inspection, on ground and over a drill rig at Row AS had been removed. However, another two oil stains were found on ground at Row AS. The Contractor was reminded to clear the oil stains, dispose of as chemical waste and properly maintain the plants on site to prevent leakage.

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

23 December 2008

Time:

15:00

Inspection No.:

039

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The oil stains at Row AS had been cleared. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

2.

Several empty chemical containers were observed placed on the slope without drip tray at Row AT. The Contractor was reminded to dispose of the empty chemical containers as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

30 December 2008

Time:

15:00

Inspection No.:

040

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Several chemical containers were still observed placed on ground and on the slope without drip tray at Row AN, Row AS and Row AT. The Contractor was reminded to provide drip trays to all chemical containers and dispose of the empty chemical containers as chemical waste.

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil