Site Inspection Summary

 

Inspection Information

Date:

3 March 2009

Time:

15:00

Inspection No.:

048

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

1.

Exposed slope was observed below Row R. The Contractor was advised to compact the loose sediment on the slope and/or to cover the slope with tarpaulin sheets.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

10 March 2009

Time:

15:00

Inspection No.:

049

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The exposed slope at Row R had been covered with tarpaulin sheets. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

2.

Leaves were observed accumulated inside the u-channel at Row C. The Contractor was reminded to clear the u-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

17 March 2009

Time:

15:00

Inspection No.:

050

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Leaves were inside the u-channel at Row C had been cleared. However, leaves were observed accumulated inside the u-channel at Row R. The Contractor was reminded to clear the u-channel more frequently.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

24 March 2009

Time:

15:00

Inspection No.:

051

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Leaves and deposited silt inside the u-channel at Row R had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

31 March 2009

Time:

15:00

Inspection No.:

052

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil