1.1
The objective of the Project “Landslide Preventive
Works at Po Shan, Mid-levels – Design and Construction (Natural Terrain Risk
Mitigation Works)” under Contract CE 28/2004 (GE) is to carry out detailed
design and supervision of landslide preventive works on local repair of the
hillside to minimize slope deterioration and shallow instability.
1.2
The Project site is located at the mostly
undeveloped hillside above the residential development at Po Shan Road and
adjacent to the trimmed back slope on the site of the catastrophic 1972 Po Shan
Road failure. Previous studies had been carried out and results indicated that
the natural hillside above
1.3
The scope of works of this Project includes the
installation about 700 numbers of soil nails and about 60 numbers of raking
drains on the natural terrain within the concerned area. The length of the soil
nails is about
1.4
AECOM Asia Company Ltd., integrating the
operation of ENSR Asia (HK) Ltd. as of 1 May 2009, was employed by the
Contractor, China State – China Railway Joint Venture, as the Environmental
Team (ET) to undertake the Environmental Monitoring and Audit (EM&A) works
for the Project.
1.5
The construction of the Project and the EM&A
programme commenced on 1 April 2008. The construction
works, including compensatory planting of vegetations, had been completed in
December 2009 and the construction phase EM&A programme
was terminated on 31 December 2009, as approval by EPD. The operation phase
EM&A programme commenced on 1 January 2010.
1.6
This report documented the findings of Landscape
& Visual Audit and Monitoring works conducted in the operation phase period
between 1 and 31 January 2010.
1.7
The key personnel contact names and numbers are
summarized in Table 1.1
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name |
Telephone |
Fax |
CEDD |
Senior Engineer |
H. W. Sun |
2762 5375 |
2714 0247 |
ER (MGS) |
Resident Engineer |
Lawrence Shek |
2170 6607 |
2730 7110 |
Assistant Resident Engineer |
S. F. Chau |
2170 6621 |
2730 7110 |
|
IEC (ENVIRON) |
Independent Environmental Checker |
|
3743 0788 |
3548 6988 |
Contractor (CCJV) |
Project Manager |
C. Y. Mak |
2665 3232 |
2667 5666 |
ET (AECOM) |
ET Leader |
Edith Ng |
3105 8525 |
2891 0305 |
Monitoring
Requirement
2.1 During the operation phase of the Project, landscape and visual monitoring should be carried out monthly by a Registered Landscape Architect (RLA) to ensure the compensatory planting and horticultural maintenance operations are properly established during the 12 month establishment period. A detailed report is annexed in Appendix A.