ROUTE 8 BETWEEN CHEUNG SHA WAN AND SHATIN

ENVIRONMENTAL PERMIT AUDIT REPORT

 

TABLE OF CONTENTS

 

 

1. INTRODUCTION

 

2. MITIGATION MEASURES FOR TRAFFIC NOISE IMPACT

 

3. FINDINGS

 

4. CONCLUSION

 

5. APPENDICES


 

1.       INTRODUCTION                          

                                                           

 

·                    The general layout plan of Noise Barriers and Noise Enclosures for Route 8 (formerly Route 9) between Cheung Sha Wan and Sha Tin – Main Portion is shown in Appendix A.

 

·                    At the southern end, a Dual-2 lane carriageway which rises up over the Lai Wan Interchange linking directly with the Route 8 – Cheung Sha Wan and Tsing Yi section, will be provided.  In addition, a Dual-2 lane slip road rises up to merge with the Dual-2 direct connection, linking the Lai Wan Interchange, will be provided.  A Dual-3 carriageway will be formed after the Lai Wan slip roads and the Dual-2 direct connection completely merge/diverge.  The mainline will continue to rise up over the elevated structure at Lai Chi Kok Interchange and continues alongside Butterfly Valley Road.

 

·                    The Dual-3 mainline structure passes over Wai Man Tsuen at high level.  The viaduct continues through Butterfly Valley to an abutment located on the earthworks platform approximately 250m north of Ching Cheung Road.  At about 400m after crossing over Ching Cheung Road, the mainline carriageways begin to separate before joining the tunnel section, at which the northbound and southbound bores area approximately 30m apart.  The crossover will be provided after the slip roads completely merge/diverge with the mainline.  Slip road connections to Ching Cheung Road will be provided.

 

·                    The main tunnel section (Eagle’s Nest Tunnel), approximately 2000m long, runs underneath the Lion Rock Country Park and surfaces at the western end of Sha Tin.

 

·                    The Highways Department is implementing Contract HY/2003/01 – Lai Chi Kok Viaduct and Contract HY/2003/02 – Eagle’s Nest Tunnel and Associated Works for Route 8 between Cheung Sha Wan and Sha Tin.  The Works executed include construction of noise barriers, noise semi and full enclosures on Lai Chi Kok Viaduct and its associated slip roads, and at the tunnel approach road, to mitigate the traffic noise impact arising from the project.

 

·                    The Director of Environmental Protection (the Director) granted the Environmental Permit to Major Works Project Management Office, Highways Department (the Permit Holder) for the construction and operation of the Route 8 (formerly Route 9) between Cheung Sha Wan and Sha Tin – Main Portion.  A copy of the Environmental Permit No. EP-103/2001/D is enclosed in Appendix B.

 

·                    According to Condition 5.3 of the Environmental Permit, the Permit Holder shall deposit with the Director 3 copies of an audit report, certified by the ET Leader and verified by the IEC, demonstrating the satisfactory completion of the measures recommended in the submission approved under Condition 3.1 of the Permit. 

 

·                    This Audit Report serves to demonstrate the satisfactory completion of the noise mitigation measure as stated in Condition 3.1.

 

2.       MITIGATION MEASURES FOR TRAFFIC NOISE IMPACT

                                                                                                                                               

·                    Condition 3.1 of the Environmental Permit No. EP-103/2001/D stipulates that the noise barriers/enclosures/semi-enclosures shall be constructed as shown in Figures 2, 3, 4, 5 and 6 of the Permit (refer to Appendix B).

 

·                    The noise barriers/enclosures/semi-enclosures (refer to Appendix A) basically fall into 4 key areas including (1) Slip Road and Viaduct Portion above Lai Po Road; (2) Viaduct Portion above Butterfly Valley Road; (3) Slip Road Portion above Ching Cheung Road and (4) Tunnel Approach Road Portion near Eagle’s Nest Tunnel.

 

·                    The various types of noise barriers/enclosures/semi-enclosures are shown on Figures SK1, SK2, SK3 and SK4 in Appendix A.

 

 

3.       FINDINGS

 

3.1       Permit Figure 2 : Slip Road and Viaduct Portion above Lai Po Road (as-built layout in Figure SK1 of Appendix A)

 

·                    The Dual-2 lane viaduct which rises up over the Lai Wan Interchange linking directly with the Route 8 – Cheung Sha Wan and Tsing Yi section has satisfactorily installed with a series of noise barriers. [i.e. CH407.993-CH670.159 (L100) and CH391.886-CH712.870 (L200)]

 

·                    The Dual-2 lane slip road linking the Lai Wan Interchange has satisfactorily installed with a series of semi noise enclosure and full noise enclosure. [i.e. CH1070.000-CH1280.500 (S100) and CH1038.000-CH1318.400 (S200)]

 

·                    The Dual-3 lane viaduct after the Lai Wan slip roads has satisfactorily installed with a series of noise barriers. [i.e. area between noise enclosure at CH1280.500(S100) and noise enclosure at CH980.000(R900)]

 

·                    The as-built layout of noise barriers/enclosures/semi-enclosures in Figure SK1 is found matching with Figure 2 of the Permit.

 

·                    The photo showing the satisfactory completion of noise barriers/enclosures/semi-enclosures in this area is enclosed in Appendix C.

 

3.2       Permit Figure 3 : Viaduct Portion above Butterfly Valley Road (as-built layout in Figure SK2 of Appendix A)

 

·                    The Dual-3 mainline viaduct has satisfactorily installed with a series of noise barriers and semi noise enclosure. [i.e. CH980.00-CH1302.000 (R900)]

 

·                    The as-built layout of noise barriers/semi noise enclosure in Figure SK2 is found matching with Figure 3 of the Permit.

 

·                    The photo showing the satisfactory completion of noise barriers/enclosures/semi-enclosures in this area is enclosed in Appendix C.

 

3.3       Permit Figure 4 : Slip Road Portion above Ching Cheung Road (as-built layout in Figure SK3 of Appendix A)

 

·                    The slip road has satisfactorily installed with a series of noise barriers. [i.e. CH680.500-CH881.700 (S400) and CH662.210-CH791.210 (S300)]

 

·                    The as-built layout of noise barriers in Figure SK3 is found matching with Figure 4 of the Permit.

 

·                    The photo showing the satisfactory completion of noise barriers/enclosures/semi-enclosures in this area is enclosed in Appendix C.

 

3.4       Permit Figures 5 & 6 : Tunnel Approach Road Portion near Eagle’s Nest Tunnel (as-built layout in Figure SK4 of Appendix A)

 

·                    The tunnel approach road has satisfactorily installed with a series of noise barriers and semi noise enclosure. [i.e. CH1791.048-CH2202.705 (R900)]

 

·                    The as-built layout of noise barriers/semi noise enclosure in Figure SK4 is found matching with Figure 5 of the Permit.

 

·                    The as-built length dimension for the noise barriers at central divider/island is 150m and 35.35m respectively in Figure SK4.  These are in accordance with the dimensions given in Figure 6 of the Permit.

 

·                    The photo showing the satisfactory completion of noise barriers/enclosures/semi-enclosures in this area is enclosed in Appendix C.

 

 

 

4.       CONCLUSION

 

·                    Further to day-to-day supervision, it is confirmed that the noise mitigation measures as stipulated in Condition 3.1 of the Environmental Permit No. EP-103/2001/D have been satisfactorily completed under Contract HY/2003/01 and Contract HY/2003/02. 

 

·                    There has been no change to the alignment of noise barriers/noise enclosures completed on site as compared to the approved EIA Report and EP-103/2001/D.

 

·                    The noise barriers and enclosures of Route 8 between Cheung Sha Wan and Sha Tin section at the boundary with Route 8 – Cheung Sha Wan and Tsing Yi section have been constructed to the alignments under the approved EIA Report and EP-103/2001/D.

 

·                    A set of photos demonstrating the satisfactory completion of the noise mitigation measure is attached in Appendix C.

 

 

 

 

 

5.       APPENDICES

 

Appendix A                        As-Built Layout Plans of Noise Barriers/Noise Enclosures

Appendix B                        Environmental Permit No. EP-103/2001/D

Appendix C                        Photos of Noise Barriers/Noise Enclosures

 

 

                                          *****************