Site Inspection Summary

 

Inspection Information

Date:

2 October 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

294

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Stagnant water and deposited silt were observed accumulated inside the trapezoidal channel in Area A and Area A2. The Contractor was reminded to clear the stagnant water and deposited silt regularly.

 

 

2.

Stagnant water under the staircase of CRE office in Area B was removed. (Closed)

 

 

 

 

 

New Observation

 

 

3

An excavator T1 was observed operating without engine cover near the slope leading to the VGF tipping hall in Area A. The Contractor was reminded to close the engine cover during operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

9 October 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

296

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Stagnant water and deposited silt were observed accumulated inside the trapezoidal channel in Area A and Area A2. The Contractor was reminded to clear the stagnant water and deposited silt regularly.

 

 

2.

The engine cover of excavator T1 was present and kept closed during operation. (Closed)

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

16 October 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

298

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Clearing of deposited silt at trapezoidal channel in Area A2 was in progress but stagnant water and deposited silt were still observed accumulated inside the trapezoidal channel in Area A. The Contractor was reminded to clear the stagnant water and deposited silt inside the trapezoidal channel regularly.

 

 

 

 

 

New Observation

 

 

2.

Plenty of oil stains were observed on the tarpaulin sheet under excavator C13 (under maintenance) next to the trapezoidal channel in Area A. The Contractor was reminded to replace the oil stained tarpaulin sheet. (reminder)

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

22 October 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

300

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

General refuses and deposited silt were observed accumulated inside the trapezoidal channel in Area A and Area A2. The Contractor was reminded to clear the general refuses and deposited silt inside the trapezoidal channel regularly.

 

 

2.

The excavator C13 next to the trapezoidal channel in Area A had been removed. (Closed)

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

30 October 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

302

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

General refuse and deposited silt inside the trapezoidal channel in Area A2 had been cleared. However, general refuse and deposited silt were still observed accumulated inside the trapezoidal channel in Area A. The Contractor was reminded to clear the general refuse and deposited silt inside the trapezoidal channel regularly.

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

Nil