Site Inspection Summary
Date: |
2 October 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
294 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Stagnant water and deposited silt were observed accumulated inside the
trapezoidal channel in Area A and Area A2. The Contractor was reminded to
clear the stagnant water and deposited silt regularly. |
|
|
2. |
Stagnant water under the staircase of CRE office in Area B was
removed. (Closed) |
|
|
|
|
|
New Observation |
|
|
3 |
An excavator T1 was
observed operating without engine cover near the slope leading to the VGF
tipping hall in Area A. The Contractor was reminded to close the engine cover
during operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
9 October 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
296 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Stagnant water and deposited silt were observed accumulated inside the
trapezoidal channel in Area A and Area A2. The Contractor was reminded to
clear the stagnant water and deposited silt regularly. |
|
|
2. |
The engine cover of excavator T1 was present and kept closed during
operation. (Closed) |
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
16 October 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
298 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
Clearing of deposited silt at trapezoidal channel in Area A2 was in
progress but stagnant water and deposited silt were still observed
accumulated inside the trapezoidal channel in Area A. The Contractor was
reminded to clear the stagnant water and deposited silt inside the
trapezoidal channel regularly. |
|
|
|
|
|
New Observation |
|
|
2. |
Plenty of oil stains
were observed on the tarpaulin sheet under excavator C13 (under maintenance)
next to the trapezoidal channel in Area A. The Contractor was reminded to
replace the oil stained tarpaulin sheet. (reminder) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
22 October 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
300 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
General refuses and deposited silt were observed accumulated inside
the trapezoidal channel in Area A and Area A2. The Contractor was reminded to
clear the general refuses and deposited silt inside the trapezoidal channel
regularly. |
|
|
2. |
The excavator C13 next to the trapezoidal channel in Area A had been
removed. (Closed) |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
30 October 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
302 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
General refuse and deposited silt inside the trapezoidal channel in
Area A2 had been cleared. However, general refuse and deposited silt were still
observed accumulated inside the trapezoidal channel in Area A. The Contractor
was reminded to clear the general refuse and deposited silt inside the
trapezoidal channel regularly. |
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |