Site Inspection Summary
Date: |
5 November 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
304 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
General refuse and deposited silt inside the trapezoidal channel in
Area A had been cleared. (Closed) |
|
|
|
New Observations |
|
|
2. |
Trucks were observed
leaving the site without covering the load by impervious sheet. The Contractor
was reminded to entirely cover the load on vehicle by clean impervious sheet. |
|
|
3. |
Deposited silt was observed accumulated along the roadside of haul
road in Area B2. The Contractor was reminded to clear the deposited silt
along haul road in Area B2 more frequently. |
|
|
4. |
Deposited silt and
general refuse were observed accumulated inside the u-channel and blocking
the desilting pits along the haul road in Area B2. The Contractor was
reminded to clear the deposited silt and general refuse inside the u-channel
and desilting pits regularly. |
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
12 November 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
306 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Most of dump trucks
were still observed leaving the site without covering the load by impervious
sheet. The Contractor was reminded to entirely cover the load on
vehicle by clean impervious sheet before leaving the site. |
|
|
2. |
Deposited silt along
the roadside of haul road in Area B2 had been cleared. (Closed) |
|
|
3. |
Deposited silt and general refuse inside the u-channel and desilting
pits along the haul road in Area B2 had been cleared. (Closed) |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
17 November 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
307 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
Some dump trucks were
still observed leaving the site without covering the load by impervious
sheet. The Contractor was reminded to entirely cover the load on
vehicle by clean impervious sheet before leaving the site. |
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
26 November 2008 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
310 |
|
Nil |
|
|
|
Follow up Observation |
|
|
1. |
Dump trucks were still
observed leaving the site without covering the load by impervious sheet. The Contractor
was reminded to entirely cover the load on vehicle by clean impervious sheet
before leaving the site. |
|
|
|
|
|
New Observation |
|
|
2. |
Minor fugitive dust was
observed when dump trucks moved along the haul road in Area A2. The
Contractor was reminded to sufficiently dampen the road. |
|
|
|
|
|
|
|
|
|