Site Inspection Summary

 

Inspection Information

Date:

5 November 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

304

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

General refuse and deposited silt inside the trapezoidal channel in Area A had been cleared. (Closed)

 

 

 

New Observations

 

 

2.

Trucks were observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet.

 

 

3.

Deposited silt was observed accumulated along the roadside of haul road in Area B2. The Contractor was reminded to clear the deposited silt along haul road in Area B2 more frequently.

 

 

4.

Deposited silt and general refuse were observed accumulated inside the u-channel and blocking the desilting pits along the haul road in Area B2. The Contractor was reminded to clear the deposited silt and general refuse inside the u-channel and desilting pits regularly.

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

12 November 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

306

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Most of dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

2.

Deposited silt along the roadside of haul road in Area B2 had been cleared. (Closed)

 

 

3.

Deposited silt and general refuse inside the u-channel and desilting pits along the haul road in Area B2 had been cleared. (Closed)

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

17 November 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

307

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Some dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

26 November 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

310

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

 

 

 

New Observation

 

 

2.

Minor fugitive dust was observed when dump trucks moved along the haul road in Area A2. The Contractor was reminded to sufficiently dampen the road.

 

 

 

 

 

 

 

 

 

Remarks

 

Nil