Inspection Information

Date:

3 December 2008

Time:

15:05

Site:

Tseung Kwan O Area 137

Inspection No.:

312

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

2.

Water tuck had been deployed to dampen the haul road in Area A2. No fugitive dust was observed in the area. (Closed)

 

 

 

 

 

New Observation

 

 

 

NIL

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

10 December 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

314

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

 

 

 

 

 

New Observation

 

 

 

NIL

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

17 December 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

316

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

1.

Several dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

 

 

 

 

 

New Observation

 

 

2.

Tarpaulin sheet covers of the conveyor belt at the waste sorting facility were damaged. The Contractor was reminded to repair the tarpaulin sheet covers to avoid dust dispersion.

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

23 December 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

318

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Several dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

2.

Tarpaulin sheet covers of the conveyor belt at the waste sorting facility were still damaged. The Contractor was reminded to repair the tarpaulin sheet covers to avoid dust dispersion.

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

31 December 2008

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

320

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Dump trucks were still observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

2.

Tarpaulin sheet covers of the conveyor belt at the waste sorting facility had been repaired. (Closed)

 

 

 

New Observation

 

 

3

General refuse was observed accumulated along the roadside in Area B1. The Contractor was reminded to clear and dispose of the refuse properly.

 

 

 

 

 

 

 

 

 

Remarks

 