Site Inspection Summary
Date: |
7 January 2009 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
322 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The load on dump trucks
was covered by clean impervious sheet before leaving the site. (Closed) |
|
|
2. |
General refuse along the roadside in Area B1 had been cleared.
(Closed) |
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
13 January 2009 |
Time: |
15:00 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
324 |
|
Nil |
|
|
|
Follow up Observation |
|
|
|
Nil |
|
|
|
New Observations |
|
|
1. |
Dump trucks were
observed leaving the site without covering the load by impervious sheet. The Contractor
was reminded to entirely cover the load on vehicle by clean impervious sheet
before leaving the site. |
|
|
2. |
Small amount of general refuse was observed accumulated along the
roadside in Area B1. The Contractor was reminded to clear and dispose of the
refuse properly. |
|
|
3. |
Deposited silt and general refuse were observed accumulated inside the
u-channel and desilting pits along the haul road in Area B2. The Contractor
was reminded to clear the deposited silt and general refuse inside the u-channel
and desilting pits regularly. |
|
|
4. |
Minor fugitive dust generated from loading and unloading activities in
Area A was observed. The Contractor was reminded to increase the frequency of
water spraying during loading and unloading activities. |
|
|
|
Nil |
Site Inspection Summary
Date: |
19 January 2009 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
325 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
The load on dump trucks
was covered by impervious sheet before leaving the site. (Closed) |
|
|
2. |
General refuse along
the roadside in Area B1 had been cleared. (Closed) |
|
|
3. |
Deposited silt and general refuse were still observed accumulated
inside the u-channel and desilting pits along the haul road in Area B2. The
Contractor was reminded to clear the deposited silt and general refuse inside
the u-channel and desilting pits regularly. |
|
|
4. |
Fugitive dust generated from loading and unloading activities in Area
A was still observed. The Contractor was reminded to increase the frequency
of water spraying during loading and unloading activities. |
|
|
|
New Observation |
|
|
5. |
Stagnant water
accumulated in pot holes near CREO in Area B1 was observed. The Contractor
was reminded to remove the stagnant water and repair the pot holes. |
|
|
|
|
|
Nil |
Site Inspection Summary
Date: |
29 January 2009 |
Time: |
14:45 |
Site: |
Tseung Kwan O Area 137 |
Inspection No.: |
327 |
|
Nil |
|
|
|
Follow up Observations |
|
|
1. |
Deposited silt and general refuse were still observed accumulated
inside the u-channel and desilting pits along the haul road in Area B2. The
Contractor was reminded to clear the deposited silt and general refuse inside
the u-channel and desilting pits regularly. |
|
|
2. |
No fugitive dust was observed from loading and unloading activities.
(Closed) |
|
|
3. |
Pot holes had been repaired and no stagnant water was observed.
(Closed) |
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
Nil |