Site Inspection Summary

 

Inspection Information

Date:

7 January 2009

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

322

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

The load on dump trucks was covered by clean impervious sheet before leaving the site. (Closed)

 

 

2.

General refuse along the roadside in Area B1 had been cleared. (Closed)

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

13 January 2009

Time:

15:00

Site:

Tseung Kwan O Area 137

Inspection No.:

324

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observation

 

 

 

Nil

 

 

 

New Observations

 

 

1.

Dump trucks were observed leaving the site without covering the load by impervious sheet. The Contractor was reminded to entirely cover the load on vehicle by clean impervious sheet before leaving the site.

 

 

2.

Small amount of general refuse was observed accumulated along the roadside in Area B1. The Contractor was reminded to clear and dispose of the refuse properly.

 

 

3.

Deposited silt and general refuse were observed accumulated inside the u-channel and desilting pits along the haul road in Area B2. The Contractor was reminded to clear the deposited silt and general refuse inside the u-channel and desilting pits regularly.

 

 

4.

Minor fugitive dust generated from loading and unloading activities in Area A was observed. The Contractor was reminded to increase the frequency of water spraying during loading and unloading activities.

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

19 January 2009

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

325

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

The load on dump trucks was covered by impervious sheet before leaving the site. (Closed)

 

 

2.

General refuse along the roadside in Area B1 had been cleared. (Closed)

 

 

3.

Deposited silt and general refuse were still observed accumulated inside the u-channel and desilting pits along the haul road in Area B2. The Contractor was reminded to clear the deposited silt and general refuse inside the u-channel and desilting pits regularly.

 

 

4.

Fugitive dust generated from loading and unloading activities in Area A was still observed. The Contractor was reminded to increase the frequency of water spraying during loading and unloading activities.

 

 

 

New Observation

 

 

5.

Stagnant water accumulated in pot holes near CREO in Area B1 was observed. The Contractor was reminded to remove the stagnant water and repair the pot holes.

 

 

 

 

 

Remarks

 

Nil

 


Site Inspection Summary

 

Inspection Information

Date:

29 January 2009

Time:

14:45

Site:

Tseung Kwan O Area 137

Inspection No.:

327

 

Non-compliance

 

 

Nil

 

 

Observations

 

 

 

Follow up Observations

 

 

1.

Deposited silt and general refuse were still observed accumulated inside the u-channel and desilting pits along the haul road in Area B2. The Contractor was reminded to clear the deposited silt and general refuse inside the u-channel and desilting pits regularly.

 

 

2.

No fugitive dust was observed from loading and unloading activities. (Closed)

 

 

3.

Pot holes had been repaired and no stagnant water was observed. (Closed)

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

Remarks

 

Nil