APPENDIX B1 Data Record Sheet for TSP Monitoring
Monitoring Location |
|
|
Details of Location |
|
|
Sampler Identification |
|
|
Date & Time of Sampling |
|
|
Elapsed-time Meter Reading |
Start (min.) |
|
Stop (min.) |
|
|
Total Sampling Time (min.) |
|
|
Weather Conditions |
Sunny / Fine / Cloudy / Rainy |
|
Site Conditions |
|
|
Initial Flow Rate, Qsi |
Pi (mmHg) |
|
Ti (°C) |
|
|
Hi (in.) |
|
|
Qsi (Std. m3) |
|
|
Final Flow Rate, Qsf |
Pf (mmHg) |
|
Tf (°C) |
|
|
Hf (in.) |
|
|
Qsf (Std. m3) |
|
|
Average Flow Rate (Std. m3) |
|
|
Total Volume (Std. m3) |
|
|
Filter Paper Identification No. |
|
|
Initial Wt. of Filter Paper (g) |
|
|
Final Wt. of Filter Paper (g) |
|
|
Measured TSP Level (mg/m3) |
|
|
Other Dust Emission Source(s) Observed
|
|
|
Remarks /Other Observations
|
|
|
Name & Designation |
Signature |
Date |
Field Operator: |
___________________ |
_________________ |
______________ |
Laboratory Staff: |
___________________ |
_________________ |
______________ |
Checked by: |
___________________ |
_________________ |
______________ |
APPENDIX B2 Construction Noise Monitoring Field Record Sheet
Monitoring Location |
|
|
Description of Location |
|
|
Date of Monitoring |
|
|
Measurement Start Time (hh:mm) |
|
|
Measurement Time Length (min.) |
|
|
Noise Meter Model/Identification |
|
|
Calibrator Model/Identification |
|
|
Measurement Results |
L90 (dB(A)) |
|
L10 (dB(A)) |
|
|
Leq (dB(A)) |
|
|
Major Construction Noise Source(s) During Monitoring |
|
|
Other Noise Source(s) During Monitoring |
|
|
Remarks / Other Observations |
|
|
Name & Designation |
Signature |
Date |
Recorded by: |
___________________ |
_________________ |
______________ |
Checked by: |
___________________ |
_________________ |
______________ |
APPENDIX B3 Water Quality Monitoring Data Record Sheet
Monitoring Station |
|
Date |
|
Weather Condition |
Sunny / Fine / Cloudy / Rainy |
Sea Condition |
Calm / Moderate / Rough |
Tide Mode |
High Tide / Low Tide |
Start Time (hh:mm) |
|
Water Depth which sample is collected (m) |
|
pH |
|
Temperature (oC) |
|
Salinity (ppt) |
|
Turbidity (NTU) |
|
Sample Identification |
|
E.coli (cfu/100 mL) |
|
DO (mg/l) |
|
DO Saturation (%) |
|
Remarks / Other Observations |
|
|
Name & Designation |
Signature |
Date |
Recorded by: |
___________________ |
_________________ |
______________ |
Checked by: |
___________________ |
_________________ |
______________ |
Laboratory Staff: |
____________________ |
_________________ |
_______________ |
Notes:
1 The E.coli results are to be entered once they are available from the laboratory.
2 In-situ measurements shall be deployed at the designated location twice. The difference between the two consecutive measurements shall be within the range of 25%. If the difference is larger than 25%, the measurement shall be carried out again until the two consecutive readings agree to within 25%.