Appendix G

Statistics on Complaints, Notifications of Summons and Successful Prosecutions

 

 

Date Received

Subject

Status

Total no. followed up by ET during this period

Total no. followed up by ET since project commencement

Environmental complaints

4 November 2013

EPD referred a noise complaint from a resident living near Uptown Plaza at Tai Po on 4 November 2013. The complainant expressed that the construction work between late-night hours on 2 November and early morning of 3 November at Tolo Highway disturbed the resident’s sleep.

Closed

5

37

13 December 2013

EPD referred a complaint from a resident of Ma Wo Tsuen about the dust emission at the construction site of the Tolo Highway widening construction works at Ma Wo on 13 December 2013. The complainant has complained about the air pollution problem for three years and that no improvement has been seen.

Closed

13 January 2014

EPD referred a noise complaint on 13 January 2014 from a resident living in Grand Palisades at Tai Po. The complainant complained about the persistent construction noise emitted between late-night hours on Saturdays and early morning of Sundays at Tolo Highway.

Closed

21 January 2014

EPD referred a complaint on 21 January 2014. The complainant drove via Tai Po Tai Wo Road section of Tolo Highway on 21 January 2014 morning. He observed a lot of muddy water generated from the Tolo Highway widening construction works. Besides, he saw from Google Earth Image Satellite that a pipe was used to draw water for ground washing, causing the outflow of muddy runoff. As the mud on the road becomes dry, dust is generated when vehicles are passing by.

The complainant requests follow-up as soon as possible.

Closed

22 January 2014

(Follow-up)

EPD referred a follow-up complaint from a resident of Ma Wo on 22 January 2014. The complaint is about the dust emission at the construction site of the Tolo Highway widening construction works at Ma Wo on 21 January 2014 afternoon and 22 January 2014 morning. The complainant complained that there was insufficient water spraying and tarpaulin sheets were not used. He expressed that the air pollution problem has caused nuisance to him for three years. He requests improvements by the Contractor and follow-up by the EPD.

Closed

Notification of summons

-

 

-

0

0

Successful Prosecutions

 

 

 

0

0