Appendix
N
Cumulative
Statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
Cumulative
statistics on Exceedances
|
Total
no. recorded in this month
|
Total
no. recorded since project commencement
|
|
1-Hour TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
24-Hour
TSP
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Noise
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
|
Water
Quality
|
Action
|
-
|
1
|
Limit
|
-
|
1
|
|
Dolphin
Monitoring
|
Action
|
-
|
-
|
Limit
|
-
|
-
|
Remarks: Exceedances
which are not project-related are not presented in this table.
Cumulative
statistics on Exceedances, Complaints, Notifications
of Summons and Successful Prosecutions
|
Date Received
|
Subject
|
Status
|
Total no. received in this month
|
Total no. received since project
commencement
|
Environmental complaints
|
17
March 2014
|
EPD referred a
complaint on 17 March 2014 from complainant who advised that there was sea
water coloured in blue observed in vicinity of Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Facilities (HKBCF) where stone
column installation was taking place. The complainant suspected that the
filling material was stained and contaminated the sea water after being
filled into the sea. With reference to the available information, it is
indicated that the abovementioned sea water coloured
in blue observed in vicinity of HKBCF is unlikely to be project related. |
Closed
|
1
|
16
|
|
22
March 2014
|
EPD referred a
complaint from a complainant who advised that muddy water was found being
discharged from the construction site of Hong Kong-Zhuhai-Macau Bridge Hong
Kong Boundary Crossing Facilities (HKBCF) – Reclamation Works on 22 March
2014. After investigation, it is considered that the complaint is unlikely to
be project related. |
Closed
|
2
|
17
|
|
25
March 2014
|
As informed by the Contractor, a complaint
was received by the Contractor on 25 March 14 concerning sand and dust
emission from uncovered barges parking at the sea area off the Tuen Mun Ferry Pier. With refer to the available information; it
is unable to conclude whether the complaint is project related. |
Closed
|
3
|
18
|
Notification of summons
|
20
March 2014
|
One notification
of summons was received in the reporting month due to works carried out
contrary to conditions of NCO, Cap.400 on 6 October 13. No successful prosecution
was received in the reporting period. |
-
|
1
|
2
|
Successful Prosecutions
|
|
|
|
|
1
|