Sang Hing – Kuly Joint Venture
Environmental Management Plan for Contract No. YL/2015/01
Cycle Tracks from Tuen Mun to Sheung Shui – Remaining Works
Forecast of Total Quantities of C&D Materials to be Generated from the Contract*
Total
Quantity
Generated
in '000m ) (in '000m ) (in '000m ) (in '000m ) (in '000m )
HLaarrdgeRBocrokkaennd Reused in the
Reused in
other
Paper/
cardboard
packaging
Disposed as
Public Fill
Plastics
(see Note 3)
Others, e.g.
general refuse
Imported Fill
Metals
Chemical Waste
Contract
Concrete
Projects
3
3
3
3
3
3
3
(
(in '000m )
(in '000 kg) (in '000kg)
(in '000kg)
1
(in '000kg)
1
(in '000m )
5
2
1
1
1
10
3
3
3
*
Remark: Figure to be revised if necessary
Notes:
(
(
(
(
1)
The performance targets are given in ETWB Technical Circular PS Clause 6(14).
The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material
The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature
where the total amount of C&D materials expected to be generated from the Works is equal to or exceeding 50,000 m3. (ETWB Technical Circular PS Clause 5(4)(b) refers).
2)
3)
4)
[
Delete Note (4) and the table above on the forecast, where inapplicable].