10       CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

10.1  Environmental monitoring works were performed in the reporting month and all monitoring results were checked and reviewed.

 

Construction Noise Monitoring 

 

10.2  All construction noise monitoring was conducted as scheduled in the reporting month. No Action/Limit Level exceedance was record.

 

Site Audit 

 

10.3  4 times of ET joint weekly environmental site inspections were conducted in the reporting month.

 

Complaint and Prosecution

 

10.4  Twos environmental complaints were received in the reporting month.

 

10.5  No environmental prosecution was received in the reporting month.

 

Recommendations

10.6  According to the environmental audit performed in the reporting month, the following recommendations were made:

 

Air Quality

Ÿ   Water spraying should be provided frequently to unpaved and exposed area, and haul roads for dust suppression.

Ÿ   Proper tarpaulin coverage should be provided to all stockpiles in the Site to prevent dust generation.

 

Water Quality

Ÿ   Wheel washing bays in all Portions within the Site should be maintained as far as practicable by means of removing silty water or using cleaner water in order to enhance the effectiveness of wheel washing in every portion within the Site.

Ÿ   Embankment or dikes should be established at the site boundary to direct any untreated wastewater from the Site to wastewater treatment facility during rain events to perform water treatment before discharge.

Ÿ   Standing or ponding water within the Site should be cleared as far as practicable.

 

Waste/Chemical Management

Ÿ   General refuse should be removed regularly to prevent accumulation on-site. Proper enclosed bin should be provided with maintenance for collection of general refuse from workforce.

Ÿ   Drip tray should be provided to oil/chemical containers and generator to avoid oil leakage. Any oil stain observed on ground should be properly removed as chemical waste.

 

Landscape and Visual

Ÿ   Adequate tree protection zones should be established to protect retained and existing trees. Conspicuous signs of status of trees should be clearly shown to avoid damage from PMEs or workers.

 

Permits/Licences

Ÿ   Environmental licences should be properly displayed at every entrance.