Ref. No.
|
Title
|
EIA-061/BC |
North & South Kowloon Sewerage Stage 1 - Hung Hom Bay Pumping Station Environmental Impact Assessment
- Final Assessment Report |
EIA-062/BC |
Tseung Kwan O Development TKO Town Centre North - Roads, Bridge & Subways Environmental Impact
Assessment Final Report |
EIA-063/BC |
Improvement to Castle Peak Road from Siu Lam to So Kwun Tan Noise Impact Assessment - Final Report
(Issue 1) |
EIA-064/BC |
Low-Level Radioactive Waste Storage Facility Consultancy Study - Environmental Impact and Safety
Assessment Report (EISA) |
EIA-065/BC |
Tsung Pak Long Flood Protection Scheme Preliminary Environmental Assessment Final Assessment, Environmental
Monitoring & Audit Manual |
EIA-066/BC |
Environmental Impact Assessment for Chai Wan Road/Wing Tai Road Widening - EIA Report |
EIA-067/BC |
Engineering Infrastructure on Hung Hom Bay Reclamation Traffic Noise Assessment and Mitigation Measures
and Air Quality Impact Assessment and underpass along Hung Hom South Road |
EIA-068/BC |
Route 3 Tai Lam Tunnel & Yuen Long Approach - Southern Section Final Detailed Environmental
Impact Assessment Vol. 1 - The Main Line & Vol. 2 Conveyor System, Vol 3 EM&A Manual |
EIA-069/BC |
Sheung Shui Slaughter House Supplementary Environmental Impact Assessment Final Report, Environmental
Monitoring & Audit Manual |
EIA-070/BC |
Hong Kong Cement/Concrete Batching Plant and Material Storage Facilities at North-West Tsing Yi
Island Environmental Impact Assessment Final Assessment Report (Volume 1: Introduction and & Summary &
Environmental Monitoring and Audit Manual |
EIA-071/BC |
Reclamation Works for District Open Space and GIC Facilities in North Tsing Yi Environmental Impact
Assessment Study - Final Assessment Report |
EIA-072/BC |
HAECO Aircraft Engine Test Cell Facility at Tseung Kwan O - Environmental Impact Assessment |
EIA-073/BC |
Lantau Port Development Stage 1, design of Reclamation and Edge Structures for CT10 and 11 and Back-up
Areas - EIA Final Report
[ Executive Summary ]
[ EIA Report ] (August 1995) |
EIA-074/BC |
Lantau Port Development - Stage 1 Reclamation for Shipyard at To Kau Wan North Lantau EIA for Operational
Phase Final Environmental Impact Assessment Report |
EIA-075/BC |
Permanent Site for Mid-Stream Operation at Stonecutter's Island Supplementary Environmental Impact
Assessment Final Report |
EIA-076/BC |
Route 3 Tai Lam Tunnel & Yuen Long Approach Northern Section Vol. 1 Detailed Environmental Impact
Assessment & Vol. 2 Environmental,and Appendix A Environmental Section of Construction Requirements, Monitoring
& Audit Manual |
EIA-077/BC |
Ting Kau and Sham Tseng Sewerage Scheme Environmental Impact Assessment Study Final Report Volume
1 of 2 & Volume 2 of 2 |
EIA-078/BC |
Treatment and Disposal of Waterworks Sludge from Existing Water Treatment Works Environmental Impact
Assessment Final Assessment Report |
EIA-079/BC |
Environmental Impact Assessment Study on Shenzhen River Regulation Project - Study report for Stage
1 Works |
EIA-080/BC |
Environmental Impact Assessment Study on Shenzhen River Regulation Project - Final EIA Study Report
(I) Volume 1 to 3 |