Environmental Permit No. EP-101/2001
環 境 許 可 證 編 號 EP-101/2001


ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Section 10

環 境 影 響 評 估 條 例
(第 499章 )
第 10條

ENVIRONMENTAL PERMIT TO CONSTRUCT AND
OPERATE A DESIGNATED PROJECT

建 造 及 營 辦 指 定 工 程 項 目 的 環 境 許 可 證

PART A (MAIN PERMIT)
A部 (許 可 證 主 要 部 分 )

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the EIAO), the Director of Environmental Protection (the Director) grants this environmental permit to the Friends of the Earth (Charity) Limited (hereinafter referred to as the "Permit Holder") to construct and operate the designated project described in Part B subject to the conditions specified in Part C. The issue of this environmental permit is based on the documents, approvals or permissions described below :

根 據 環 境 影 響 評 估 條 例 (環 評 條 例 )第 10條 的 規 定 , 環 境 保 護 署 署 長 (署 長 )將 本 環 境 許 可 證 批 予 地 球 之 友 (下 稱 "許 可 證 持 有 人 ")以 建 造 及 營 辦 B部 所 說 明 的 指 定 工 程 項 目 , 但 須 遵 守 C部 所 訂 明 的 條 件 。 本 環 境 許 可 證 的 發 出 , 乃 以 下 表 所 列 的 文 件 、 批 准 或 許 可 作 為 根 據 ﹕

Application No.
申 請 書 編 號
AEP-101/2001
AEP-101/2001
Document in the Register :
登 記 冊 上 的 文 件 :
(1) Project Profile -
"Construction of Temporary Wind monitoring Station on Lamma Island"
(Register No. : PP-115/2001)
(1) 工 程 項 目 簡 介 -
"擬 建 南 丫 島 臨 時 風 力 監 察 站 "
(登 記 冊 編 號 : PP-115/2001)

(2) The Director's letter of permission to apply directly for environmental permit dated 17 March 2001 (Reference: EP2/ N9/Q/82)
(2) 署 長 於 2001年 3月 17日 發 出 批 准 直 接 申 請 環 境 許 可 證 的 信 件 (檔 案 編 號 : EP2/N9/Q/82)

(3) The supplementary information to address the potential bird strike risk submitted by the Permit Holder on 10 April 2001, 25 May 2001 and 8 June 2001 respectively.
(3) 許 可 證 持 有 人 分 別 於 2001年 4月 10日 、 2001年 5月 25日 及 2001年 6月 8日 所 提 交 用 以 避 免 潛 在 鳥 撞 風 險 的 補 充 資 料 。

(4) The Director's letter of approving the supplementary information on the potential bird strike risk dated 26 June 2001. (Reference EP2/N9/Q/82)
(4) 署 長 於 2001年 6月 26日 發 出 批 准 潛 在 鳥 撞 風 險 補 充 資 料 的 信 件 (檔 案 編 號 : EP2/N9/Q/82)
Director's Permission to Apply Directly for Environmental Permit
署 長 批 准 直 接 申 請 環 境 許 可 證
Letter Reference: EP2/N9/Q/82
信 件 檔 號 : EP2/N9/Q/82

Dated : 17 March 2001
日 期 : 2001年 3月 17日


___________________
Date
日 期


______________________________________
(Mr. Elvis W. K. AU)
Assistant Director of Environmental Protection
(Environmental Assessment and Noise)
for Director of Environmental Protection
環 境 保 護 署 署 長
(環 境 保 護 署 助 理 署 長 (環 境 評 估 及 噪 音 ) 區 偉 光 代 行 )

PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B部 (指 定 工 程 項 目 的 說 明 )

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the "Permit"):

下 列 為 本 環 境 許 可 證 (下 稱 "許 可 證 ") A 部 所 提 及 的 指 定 工 程 項 目 的 說 明 :

Title of Designated Project
指 定 工 程 項 目 的 名 稱
Construction of Temporary Wind Monitoring Station on Lamma [This project is hereinafter referred as "the Project".]

擬 建 南 丫 島 臨 時 風 力 監 察 站 [這 工 程 項 目 下 稱 "工 程 項 目 "]
Nature of Designated Project
指 定 工 程 項 目 的 性 質
A project wholly in an existing Conservation Area.

工 程 項 目 完 全 在 現 有 自 然 保 育 區 內 進 行 。
Location of Designated Project
指 定 工 程 項 目 的 地 點
The Project is located at Ngai Tau, Lamma Island. The location of the Project is shown in Figure 1 attached to this Environmental Permit.

工 程 項 目 位 於 南 丫 島 崖 頭 。 工 程 項 目 的 位 置 見 載 於 本 環 境 許 可 證 夾 附 的 圖 1。
Scale and Scope of Designated Project(s)
指 定 工 程 項 目 的 規 模 和 範 圍
Construction, operation and taking down of the temporary wind monitoring station. Construction works include installation of the wind monitoring tower for about thirteen months wind monitoring operation.

建 造 、 營 辦 及 拆 除 臨 時 風 力 監 察 站 。 建 造 工 程 包 括 裝 設 一 個 使 用 期 約 13個 月 的 風 力 監 察 站 。

PART C (PERMIT CONDITIONS)

1. General Conditions

1.1 The Permit Holder shall ensure full compliance with all conditions of this environmental permit. Any non-compliance may constitute a contravention of the Environmental Impact Assessment Ordinance and may become subject of appropriate action being taken under the Ordinance.

1.2 The Permit Holder shall ensure full compliance with all legislation from time to time in force including without limitation the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Dumping at Sea Ordinance (Cap. 466) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself constitute any ground of defense against any proceedings instituted under any legislation.

1.3 The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit or the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sites/offices covered by this Permit. Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register.

1.4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated by the Permit. The site(s) refers to the site(s) of construction and operation of the Project(s) and shall mean the same hereafter.

1.5 The Permit Holder shall display conspicuously a copy of this Permit on the construction site(s) at all site entrances/exits or at a convenient location for public information at all times. The Permit Holder shall ensure that the most updated information about the Permit, including any amended permit, is displayed at such locations. If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit. The suspended, varied or cancelled Permit shall be removed from the display at the construction site(s).

1.6 The Permit Holder shall construct and operate the Project in accordance with the project descriptions in Part B of this Permit.

1.7 The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and all recommendations described in the Project Profile (EIAO Register No. PP-115/2001); other relevant documents in the Register; and the information or mitigation measures described in this Permit. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit.

1.8 All submissions approved by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the Environmental Impact Assessment Ordinance.

1.9 The Permit Holder shall notify the Director in writing the commencement date of construction of the Project at least 1 week prior to the commencement of construction of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the construction. The Permit Holder shall also notify the Director in writing the date of taking down the monitoring station at least 1 week before the station is taken down.

2. Measures during the Construction and Operation of the Project

2.1 The Permit Holder shall use colored plastic strips in accordance with the scheme as proposed in the submission dated 10 April 2001 for all the guy wires to guard against potential bird strike incident.

2.2 The Permit Holder shall only use grey color for the tower to minimize visual impact.

2.3 The permit holder shall submit monthly report on any bird strike incident to cover the period from the commencement of construction to the completion of demolition of the project. The monthly report shall include details regarding the bird species involved and shall be submitted within 2 weeks after the end of the reporting month.

Notes :

1. This Permit consists of three parts, namely, PART A (Main Permit), PART B (Description of Designated Project) and PART C (Permit Conditions). Any person relying on this permit should obtain independent legal advice on the legal implications under the Ordinance, and the following notes are for general information only.

2. The Permit Holder may apply under Section 13 of the Ordinance to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the construction site by the amended permit.

3. A person who assumes the responsibility for the whole or a part of the designated project may, before he assumes responsibility of the designated project, apply under Section 12 of the Ordinance to the Director for a further environmental permit.

4. Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for the Environment and Food, suspend, vary or cancel this Permit. The suspended, varied or cancelled Permit shall be removed from display at the construction site.

5. If this Permit is cancelled or surrendered during construction or operation of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued. It is an offence under Section 26(1) of the Ordinance to construct or operate a designated project listed in Part I of Schedule 2 of the Ordinance without a valid environmental permit.

6. Any person who constructs or operates the Project contrary to the conditions in the Permit, and is convicted of an offence under the Ordinance, is liable: -

(i) on a first conviction on indictment to a fine of $ 2 million and to imprisonment for 6 months;
(ii) on a second or subsequent conviction on indictment to a fine of $ 5 million and to imprisonment for 2 years;
(iii) on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;
(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and
(v) in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $ 10,000 for each day on which he is satisfied the offence continued.

7. The Permit Holder may appeal against any condition of this Permit under Section 17 of the Ordinance within 30 days of receipt of this Permit.

[ Back to First Page ] / [ Back to Main Index ]