Environmental Permit No. EP-132/2002

環境許可證編號EP-132/2002

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

Section 10

 

環境影響評估條例

(499)

10

 

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED PROJECT

建造及營辦指定工程項目的環境許可證

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the EIAO), the Director of Environmental Protection (the Director) grants this environmental permit to the Civil Engineering Department The Hongkong Electric Co., Ltd. (hereinafter referred to as the “Permit Holder”) to construct and operate the designated project described in Part B subject to the conditions specified in Part C. The issue of this environmental permit is based on the documents, approvals or permissions described below:

根據環境影響評估條例(環評條例)10條的規定,環境保護署署長(署長)將本環境許可證批予香港電燈有限公司 土木工程署(下稱許可證持有人”)以建造及營辦B所說明的指定工程項目,但須遵守C所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據﹕-

 

Application No.

申請書編號

AEP-132096/2002

 

Document in the Register :

登記冊上的文件:

 

(1) Project ProfileEnvironmental Impact Assessment

132kV Submarine Cable Installation for Wong Chuk Hang – Chung Hom Kok 132kV Circuits (Register No.: PP-159/20020)Construction of an International Theme Park in Penny’s Bay of North Lantau and its Essential Associated Infrastructure

- Final EIA Report

- Annex (Volume 1)

- Annex (Volume 2)

- Annex (Volume 3)

- Executive Summary[Hereinafter referred to as the EIA Report]

(1) 工程項目簡介 – “黃竹坑 舂坎角132kV電路之132kV海底電纜敷設工程” (登記冊編號:PP-159/2002)

 

(2) The Director’s letter of permission to apply directly for environmental permit dated 4 March 2002 (Reference: (26) in Ax(1) to EP2/H17/C/01)

(2)環境保護署署長於200234日發出批准直接申請環境許可證的信件(檔案的編號: (26) in Ax(1) to EP2/H17/C/01)

 

(3) Application documents including all attachments submitted by the Permit Holder on 26 March 2002 (Application No. AEP-132/2002)

(3) 許可證持有人於2002326日提交申請文件包括所有附件(申請書編號﹕AEP-132/2002)

 

Director’s Permission to Apply Directly for Environmental Permit:

署長批准直接申請環境許可證

Letter Reference: (26) in Ax(1) to EP2/H17/C/01

信件檔號:(26) in Ax(1) to EP2/H17/C/01

 

Date: 4 March 2002

日期:200234

北大嶼山竹篙灣國際主題公園及有關主要基礎設施建造工程 - 環境影響評估

-最終環境影響評估報告

-附件 (第一冊)

-附件 (第二冊)

-附件 (第三冊)

-摘要

 

(登記冊編號:AEIAR-032/2000) [下稱環評報告”]

環境保護署署長於2000428日發出批准環評報告的信件 (檔案編號: (53) in Annex (3) to EP2/N9/O/65 III)

 

申請更改環境許可證編號VEP-017/2000

[下稱申請書編號VEP-017/2000”]

申請更改環境許可證編號VEP-018/2000

[下稱申請書編號VEP-018/2000”]

 

已發出的環境許可證 - 許可證編號:EP-060/2000; 2000519日發出

已發出的環境許可證 - 許可證編號:EP-061/2000; 2000519日發出

已發出的環境許可證 - 許可證編號:EP-062/2000; 2000512日發出

已發出的修訂環境許可證 - 許可證編號:VEP-017/2000/A/EP-058;於200078日發出

已發出的修訂環境許可證 - 許可證編號:VEP-018/2000/A/EP-054;於200078日發出

 

申請環境許可證編號AEP-0976/2001

 

 

 

 

 

 

 

 

 

 

 

 

Date

日期

 

(Elvis W. K. AU)

Assistant Director

(Environmental Assessment and Noise)

for the Director of Environmental Protection

環境保護署署長

(助理署長(環境評估及噪音)區偉光代行)



PART B (DESCRIPTIONS OF DESIGNATED PROJECT)

B (指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the “Permit”):

下列為本環境許可證(下稱許可證”)A部所提述的指定工程項目的說明:

 

Title of Designated Project

指定工程項目的名稱

132kV Submarine Cable Installation for Wong Chuk Hang – Chung Hom Kok 132kV Circuits

The Infrastructure for Penny’s Bay Development Contract 1 includes

Penny’s Bay Resort Road

1.Eastern Stormwater Drainage Channel at Penny’s Bay

1. 

1.Water Recreation Centre at Penny’s Bay

1. 

1.Yam O Reclamation

1. 

1.Chok Ko Wan Link Road

1.Road P2

[These above 4 designated projects are hereinafter referred to as “the Project”]

 

黃竹坑 舂坎角132kV電路之132kV海底電纜敷設工程

[上述指定工程項目下稱工程項目”] (???Chinese to be revised)

竹篙灣遊覽大道

竹篙灣東部排水渠

竹篙灣水上康樂中心

 

 

Nature of Designated Project
指定工程項目的性質

A dredging operation which is less than 500 metres from the nearest boundary of Deep Water Bay bathing beach, Middle Bay bathing beach and South Bay bathing beach.

 

挖泥工程,施工地點距離現有深水灣泳灘、中灣泳灘和南灣泳灣的最接近的界線少於500米。

 

Location of Designated Project

指定工程項目的地點

The dredging operation will be carried out at the Deep Water Bay and the South Bay, as shown in Figure 1 attached to this Permit.

 

挖泥工程會於深水灣及南灣進行,如本許可證圖一所示。

 

Scale and Scope of Designated Project(s)

指定工程項目的規模和範圍

The dredging operation involves the laying of submarine cables by the grab dredging and the jet plough method within 500 metres from the nearest boundary of bathing beaches.

 

挖泥工程包括採用抓斗挖泥和水力噴注法於最接近泳灘界線的500米內敷設海底電纜。

 

 


PART C (PERMIT CONDITIONS)

 

1.1        The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit.  Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499) and may become the subject of appropriate action being taken under the Ordinance.

 

1.2        The Permit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap.400), Air Pollution Control Ordinance (Cap.311), Water Pollution Control Ordinance (Cap.358), Dumping at Sea Ordinance (Cap.466), the Waste Disposal Ordinance (Cap.354). This Permit does not of itself (a) constitute any ground of defense against any proceedings instituted under any legislation or (b) imply any approval under any legislation.

 

1.3        The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit or the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sites/offices covered by this Permit.  Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register.

 

1.4        The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated by the Permit.  The site(s) refers to site(s) of construction and/or operation of the Project(s) and shall mean the same hereafter.

 

1.5    The Permit Holder shall display conspicuously a copy of this Permit on the construction site(s) at all vehicular site entrances/exits or at a convenient location for public information at all times.  The Permit Holder shall ensure that the most updated information about the Permit, including any amended permit, is displayed at such locations.  If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit.  The suspended, varied or cancelled Permit shall be removed from display at the construction site(s).

 

1.6               The Permit Holder shall construct and operate the Project as described in Part B of this Permit.

 

1.7               The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and recommendations described in the Project Profile (Register No. PP-159/2002); other relevant documents in the Register; and the information or mitigation measures described in this Permit, or mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, or mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project.  Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit. 

 

1.8               All submissions, as required under this Permit, shall be rectified and resubmitted in accordance with the comments, if any, made by the Director within one month of the receipt of the Director's comments or otherwise as specified by the Director.

 

1.9               All submissions approved by the Director, all submissions deposited without comments by the Director, or all submissions rectified in accordance with comments by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit.  Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions.

 

1.10            The Permit Holder shall release all finalized submissions, as required under this Permit, to the public by depositing copies in the Environmental Impact Assessment Ordinance Register Office, or in any other places, or any internet websites as specified by the Director, or by any other means as specified by the Director for public inspection.  For this purpose, the Permit Holder shall provide sufficient copies of the submissions.

 

1.11            The Permit Holder shall notify the Director in writing the commencement date of construction of the Project no later than one month prior to the commencement of construction of the Project.  The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the construction.

 

1.12            All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalized submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

 

1.13            For the purpose of this Permit, “commencement of construction” does not include works related to site clearance and preparation, or other works as agreed by the Director.

 

2.                  Specific Conditions

 

2.1               The cables shall be laid within the cable corridor shown in Figure 1 attached to this Permit. The Permit Holder shall deposit a set of plan(s) in scale 1:5000 scale with reference coordinates, showing the alignment of the proposed cable routing at least one month before the commencement of construction of the Project. The set of plan(s) shall comprise two hard copies and one electronic copy in the formats as specified in Condition 1.12. The Permit Holder shall obtain prior approval from the Director of any change in the cable alignment, burial depth, trench width and installation methods as stated in the Project Profile.

 

2.2               To minimize water quality impact to the bathing beach(es) near each landing point, dredging operation along the cable alignment shall be conducted during the calendar period starting from 1 November to 31 March next year inclusive, to avoid dredging operation during the peak bathing season.

 

2.3               No more than one grab dredger shall be used at each shore end of the landing points.

 

2.4               Silt curtain(s) shall be installed around the grab dredger and be properly maintained to minimize water quality impact to the bathing beaches from the dredging operation.

 

2.5               Dredging operation shall not be carried out within the restricted area(s), as shown in Figure 2 and Table 1 attached to this Permit, in order to avoid any direct physical removal of the coral colonies found within the cable corridor as recorded by the dive survey submitted in support of the marine ecological survey presented in the Project Profile.

 

2.6               Dredging operation shall not be carried out within the restricted area(s), as shown in Figure 3 and Table 2 attached to this Permit, in order to avoid any direct impact to the anomaly, which may be a shipwreck or antiquity, found within the cable corridor as recorded by the dive survey submitted in support of the side scan sonar survey presented in the Project Profile.

 

2.7               The Director shall be informed within 24 hours in the event that dredging operation finds any shipwreck or antiquity. To avoid any direct impact to the findings, dredging operation shall not be carried out in the vicinity of that shipwreck or antiquity before implementation of proper mitigation measures. Prior to implementation of mitigation measures, the Permit Holder shall submit a proposal of these measures including, among others, the revision of cable alignment to avoid that shipwreck or antiquity, for the Director’s approval. The proposal shall comprise two hard copies and one electronic copy in the format as specified in Condition 1.12. An antiquity is defined in the Antiquities and Monuments Ordinance (Cap. 53).

 

 

Notes :

 

1.              This Environmental Permit consists of three parts, namely, Part A (Main Permit), Part B (Descriptions of Designated Project) Part C (Permit Conditions).  Any person relying on this Permit should obtain independent legal advice on the legal implications under the Ordinance, and that the following notes are for general information only.

 

2.              If there is a breach of any condition of this Permit, the Director or his authorized officer may, with the consent of the Secretary, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

 

3.              The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance (the “Ordinance”) to the Director for a variation of the conditions of this Environmental Permit.  The Permit Holder shall replace the original Permit displayed on the construction site, by the amended Permit.

 

4.              A person who assumes responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the Ordinance to the Director for a further Environmental Permit.

 

5.              Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for Environment and Food, suspend, vary or cancel this Permit.  The suspended, varied or cancelled shall be removed from the display at the construction site.

 

6.              If this Permit is cancelled or surrendered during the construction or operation of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued.  It is an offence under Section 26(1) of the Ordinance to construct or operate a designated project listed in Part I of Schedule 2 of the Ordinance without a valid environmental permit.

 

7.              Any person who constructs or operates the Project contrary to the conditions in the Permit, and is convicted of an offence under the Ordinance, is liable :

 

(i)                  on a first conviction of indictment to a fine of $2 million and imprisonment for 6 months;

 

(ii)                on a second or subsequent conviction on indictment to a fine of $5 million and imprisonment for 2 years;

 

(iii)               on a first summary conviction to a fine at level 6 and imprisonment for 6 months;

 

(iv)              on a second or subsequent summary conviction to a fine of $1 million and imprisonment for 1 year; and

 

(v)                in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied that the offence continued.

 

8.              The Permit Holder may appeal against any condition of this Permit under Section 17 of the Ordinance within 30 days of receipt of this Permit.

 

9.              The Notes are for general reference only and that the Permit Holder should refer to the EIA Ordinance for details and seek independent legal advice.

 

Environmental Permit No.: EP-132/2002

 


Figure 1 | Figure 2 | Figure 3


[ Back to First Page ] / [ Back to Main Index ]