Environmental Permit No. EP-156/2003

環境許可證編號:EP-156/2003

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

Section 10

 

環境影響評估條例

(499)

10

 

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED PROJECT

建造及營辦指定工程項目的環境許可證

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the EIAO), the Director of Environmental Protection (the Director) grants this environmental permit to the Highways Department (hereinafter referred to as the "Permit Holder") to construct and operate the designated project described in Part B subject to the conditions specified in Part C.  The issue of this environmental permit is based on the documents, approvals or permissions described below:

根據環境影響評估條例(環評條例)10條的規定,環境保護署署長 ("署長") 將本環境許可證批予路政署(下稱許可證持有人”) 以建造及營辦B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據﹕-

 

Application No.

申請書編號

 AEP-156/2003

 

Document in the Register

登記冊上的文件

 

(1) Project Profile –

“Junction Improvement to Chung Hom Kok Road and Stanley Gap Road” (Register No.: PP-181/2002)

(1) 工程項目簡介– “舂磡角道與赤柱峽道交界處改善工程” (登記冊編號:PP-181/2002)

 

(2) Application documents including all attachments submitted by the Permit Holder on 28 January 2003 (Application No. AEP-156/2003)

(2) 許可證持有人於2003128日提交申請文件包括所有附件(申請書編號﹕AEP-156/2003)

 

Director’s Permission to Apply Directly for Environmental Permit

署長准許直接申請環境許可證

Letter Reference: (19) in EP2/H19/A/06

信件檔號:(19) in EP2/H19/A/06

 

Date: 24 January 2003

日期:2003124

 

 

 

 

 

 

                               

 

 

 

 

Date

日期

 

(Elvis W. K. AU)

Assistant Director

(Environmental Assessment and Noise)

for the Director of Environmental Protection

環境保護署署長

(助理署長(環境評估及噪音)區偉光代行)

 


PART B (DESCRIPTIONS OF DESIGNATED PROJECT)

B (指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the “Permit”):

下列為本環境許可證(下稱許可證”)A部所提述的指定工程項目的說明:

 

Title of Designated Project

指定工程項目的名稱

 

Junction Improvement to Chung Hom Kok Road and Stanley Gap Road

[This designated project is hereinafter referred to as “the Project”.]

舂磡角道與赤柱峽道交界處改善工程

[本指定工程項目下稱工程項目”]

 

Nature of Designated Project
指定工程項目的性質

 

To modify a road section at the existing Stanley Gap Road (a district distributor)

修改赤柱峽道(地區幹路)的現有路段

 

Location of Designated Project

指定工程項目的地點

The junction at Stanley Gap Road and Chung Hom Kok Road. The location of the Project is shown in Figure 1.

赤柱峽道與舂磡角道的交界處。工程項目的地點載於本許可證圖1

 

Scale and Scope of Designated Project

指定工程項目的規模和範圍

The Project involves the road junction modification works at the existing Stanley Gap Road (a district distributor). The scope of the Project comprises:

-          widening of the approach on Stanley Gap Road at its junction with Chung Hom Kok Road from 2 lanes to 3 lanes;

-          widening of the section of Chung Hom Kok Road approaching the junction with Stanley Gap Road from 2 lanes to 3 lanes; and

-          associated slope stabilization works.

工程項目涉及赤柱峽道(地區幹路)的道路交界處修改工程。工程項目的範圍包括:

-          近引入舂磡角道的赤柱峽道交界處路段由兩條行車線擴闊到三條行車線;

-          將近赤柱峽道交界處的舂磡角道路段由兩條行車線擴闊到三條行車線;和

-          進行有關鞏固斜坡工程。

 

 

 

PART C (PERMIT CONDITIONS)

C (許可證條件)

1.                  General Conditions

 

1.1        The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499) and may become the subject of appropriate action being taken under the Ordinance.

 

1.2               The Permit Holder shall ensure full compliance with all legislation from time to time in force including without limitation the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Dumping at Sea Ordinance (Cap. 466) and Waste Disposal Ordinance (Cap. 354).  This Permit does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation.

 

1.3               The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sites/offices covered by this Permit.  Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the EIA Ordinance Register Office.

 

1.4               The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated by the Permit. The site(s) refers to site(s) of construction and operation of the Project and shall mean the same hereafter.

 

1.5               The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular site entrances/exits or at a convenient location for public’s information at all times.  The Permit Holder shall ensure that the most updated information about the Permit, including any amended Permit, is displayed at such locations.  If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit.  The suspended, varied or cancelled Permit shall be removed from display at the Project site(s).

 

1.6               The Permit Holder shall construct and operate the Project in accordance with the project description in Part B of this Permit.

 

1.7               The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and recommendations described in the Project Profile (Register No. PP-181/2002), other relevant documents in the EIA Ordinance Register Office, the information and mitigation measures described in this Permit, mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project. Where recommendations referred to in the documents of the EIA Ordinance Register Office are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit.

 

1.8               All deposited submissions, as required under this Permit, shall be rectified and resubmitted in accordance with the comments, if any, made by the Director, within one month of the receipt of the Director’s comments or otherwise specified by the Director.

 

1.9               All submissions approved by the Director, all submissions deposited without comments by the Director, or all submissions rectified in accordance with comments by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499).

 

1.10            The Permit Holder shall release all finalized submissions as required under this Permit, to the public by depositing copies in the EIA Ordinance Register Office, or in any other places, or any internet websites as specified by the Director, or by any other means as specified by the Director for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of the submission.

 

1.11            The Permit Holder shall notify the Director in writing the commencement date of the Project no later than one month prior to the commencement of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date.

 

1.12            All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIA Ordinance Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong).  Electronic copies of all finalized submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

 

1.13            For the purpose of this Permit, “commencement of the Project” does not include works related to site preparations, or other works as agreed by the Director.

 

2.    Specific Conditions

 

Landscape and Visual

 

2.1               Within 4 weeks after commencement of the Project, the Permit Holder shall complete a tree survey covering Areas A, B and C shown in Figure 2 of this Permit.  The tree survey shall determine the exact number of trees to be affected by the Project, their amenity value and the feasibility of retention, or transplantation.

 

2.2               Within 4 weeks after commencement of the Project, the Permit Holder shall deposit with the Director a landscape proposal reporting on the findings and recommendations of the tree survey stated in condition 2.1 of this Permit, and specifying the following landscape measures:

 

a.               the trees to be fell, retained, and transplanted under the Project.  For those trees to be transplanted within the Project’s boundary, the specific locations for transplantation shall also be specified;

 

b.               the species and size of trees to be planted along the southeastern side of the road junction as shown in Figure 2 of this Permit;

 

c.               the species to be used in hydroseeding the slopes within Areas A, B and C shown in Figure 2 of this Permit; and

 

d.               the aesthetic treatment to be applied to the finished retaining walls on the southeastern side of the road junction shown in Figure 2 of this Permit.

 

2.3               To mitigate the landscape and visual impacts of the Project, before the improved road junction commences operation, the Permit Holder shall complete the landscape measures stated in condition 2.2 of this Permit.

 

 

Notes :

1.         This Permit consists of three parts, namely, PART A (Main Permit), PART B (Description of Designated Project) and PART C (Permit Conditions). Any person relying on this permit should obtain independent legal advice on the legal implications under the Ordinance, and the following notes are for general information only.

 

2.                   If there is a breach of any conditions of this Permit, the Director or his authorized officer may, with the consent of the Secretary for the Environment, Transport and Works, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

 

3.                   The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance (the “Ordinance”) to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the Project site by the amended permit.

 

4.                   A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the Ordinance to the Director for a further environmental permit.

 

5.                   Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for the Environment, Transport and Works, suspend, vary or cancel this Permit. The suspended, varied or cancelled Permit shall be removed from display at the Project site.

 

6.                   If this Permit is cancelled or surrendered during construction or operation of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued. It is an offence under Section 26(1) of the Ordinance to construct or operate a designated project listed in Schedule 2 of the Ordinance without a valid environmental permit.

 

7.         Any person who constructs or operates the Project contrary to the conditions in the Permit, and is convicted of an offence under the Ordinance, is liable: -

(i)              on a first conviction on indictment to a fine of $ 2 million and to imprisonment for 6 months;

 

(ii)            on a second or subsequent conviction on indictment to a fine of $ 5 million and to imprisonment for 2 years;

 

(iii)           on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

 

(iv)          on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

 

(v)            in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $ 10,000 for each day on which he is satisfied the offence continued.

 

8.             The Permit Holder may appeal against any condition of this Permit under Section 17 of the      Ordinance within 30 days of receipt of this Permit.

 

9.                   The Notes are for general reference only and that the Permit Holder should refer to the EIA Ordinance for details and seek independent legal advice.

 

 

 

Environmental Permit No. EP-156/2003

環境許可證編號  EP-156/2003

 


Figure 1 | Figure 2


[ Back to First Page ] / [ Back to Main Index ]