Environmental Permit No. EP-163/2003

環境許可證編號  EP-163/2003

 

 

Table 2b           Noise Mitigation Measures to be Implemented Before Commencement of Population Intake at the Planned Developments at Lam Tei

 

Mitigation Measure

Location

Type

Approx. Length

Chainage No.

Remarks

Cantilever Barrier DBL8

Ramp B of Lam Tei Interchange connecting DBL mainline (NB)

Cantilever barrier (5.5m vertical plus 2.2m extension)

519m

4+766~1+168

To protect F1A planned development area

Cantilever Barrier

DBL11M1

Mainline of DBL (central divider) in the north of Ramp D of Lam Tei Interchange

Cantilever barrier (5.5m vertical plus 2.2m extension)

365m

4+766~5+100

To protect F1A planned development area

Cantilever Barrier LT10

Ramp G of Lam Tei Interchange

Cantilever barrier (5.5m vertical plus 2.2m extension)

250m

0+150~0+400

To protect F1B planned development area

Barrier YLH14

Ramp connecting to Yuen Long Highway (EB) – south of Lam Tei Interchange

6m vertical barrier

82m

0+080~0+162

To protect F1B planned development area

 

 

 

Note:      SB = southbound, NB = northbound

               EB = eastbound, WB = westbound

               HSKNDA is Hung Shui Kiu New Development Area