Annex C
Measures to Mitigate Water
Impacts during Operation
To mitigate the water quality
impacts, the following mitigation measures shall be implemented:
Site Run-off
(a) Appropriate
measure should be implemented to control site run-off thereby preventing high
loading of suspended solids from entering the nearby reserve drainage system
and other drainage systems in the vicinity. Proper site management shall be
employed to minimize surface run-off and sewage effluents to nearby storm
drains.
Site Drainage
(b) Interceptors
installed to floor drains shall be properly used and maintained;
(c) Grating of an
appropriate grate size over the surface channels shall be properly used and
maintained;
(d) Removable
vertical grates, in the surface channels at a frequency of one grate for every
six market stalls, shall be properly used and maintained;
(e) Pyramid type
grating above the outlet point with a hinged lid, together with vertical grates
on either side of the pyramid trap shall be properly used and maintained;
(f) Removable
sump bucket, under the pyramid grating, with drain hole shall be properly used
and maintained;
(g) The drainage
system shall be cleaned at a regular frequency using gully suckers or other
appropriate equipment to ensure that the performance of the system is effective
in removing solid materials.