Environmental Permit No. EP-304/2008

環境許可證編號  EP-304/2008

 

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

Section 10

 

環境影響評估條例

(499)

10

 

ENVIRONMENTAL PERMIT TO CONSTRUCT A DESIGNATED PROJECT

 

建造指定工程項目的環境許可證

 

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) grants this environmental permit to the GEOTECHNICAL ENGINEERING OFFFICE, CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT (hereinafter referred to as the "Permit Holder") to construct the designated project described in Part B subject to the conditions specified in Part C.  The issue of this environmental permit is based on the documents, approvals or permissions described below:

 

根據《環境影響評估條例》(環評條例)10條的規定,環境保護署署長(署長)將本環境許可證批予土木工程拓展署轄下土力工程處(下稱 許可證持有人),以建造B所說明的指定工程項目,但須遵守C所列明的條件。本環境許可證是依據下列文件、批准或許可而簽發:

 

 

 

Application No.

申請書編號

 

 

AEP-304/2008

 

Document in the Register :

登記冊上的文件:

 

1.        Project Profile -
“Landslip Preventive Works at Feature No. 3SE-B/C 156 Along Bride’s Pool Road, Near Chung Mei Plover Cove Reservoir, Tai Po, December 2007” (Register No.: PP-339/2007)

工程項目簡介

造斜坡編號3SE-B/C156防止山泥傾瀉工程

在大埔涌尾近船灣淡水湖,新娘潭路路旁(二零零七年十二月)(登記冊編號: PP-339/2007

 

2.        Application for Environmental Permit submitted by the Permit Holder on 5 February 2008 (Application No.: AEP-304/2008)

許可證持有人於200825日提交的環境許可證申請

(申請書編號: AEP-304/2008)

 

 

 

 

 

 

 

 

 

Application No.

申請書編號

 

 

AEP-304/2008

 

Director's Permission to Apply Directly for Environmental Permit
署長批准直接申請環境許可證

 

 

Letter Reference: (28) in EP2/N5/Q1/52

信件檔號: (28) in EP2/N5/Q1/52

 

Date: 5 February 2008

日期: 200825

 

 

 

 

 

 

 

3 March 2008

 

 

Date

日期

 

(Maurice K.L. YEUNG)

Principal Environmental Protection Officer

(Assessment and Noise)

for Director of Environmental Protection

環境保護署署長

(首席環境保護主任(評估及噪音) 楊國良代行

 

 

 


PART B (DESCRIPTION OF DESIGNATED PROJECT)

B (指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as “the Permit”):

下列為本環境許可證(下稱許可證”)A所提述的指定工程項目的說明:

 

Title of Designated Project

指定工程項目的名稱

 

Landslip Preventive Works at Feature No. 3SE-B/C 156

[This designated project is hereinafter referred to as "the Project"]

造斜坡(編號 3SE-B/C156防止山泥傾瀉工程

[指定工程項目下稱"工程項目"]

 

Nature of Designated Project

指定工程項目的性質

 

To carry out landslip preventive works at Feature No. 3SE-B/C156

進行造斜坡(編號 3SE-B/C156)防止山泥傾瀉工程

 

Location of Designated Project

指定工程項目的地點

 

 

Along Bride’s Pool Road, near Chung Mei Plover Cove Reservoir, Tai Po.  The location of the Project is shown in Figure 1 of this Permit.

大埔涌尾近船灣淡水湖的新娘潭路路旁。工程項目的位置見載於本許可證夾附的圖1

 

Scale and Scope of Designated Project

指定工程項目的規模和範圍

The scope of works comprises minor earthworks, soil nailing, drainage improvement and landscaping works as shown in Figure 2 of this Permit.

工程項目包括本許可證圖2所示小型土方工程、為土壤斜坡裝設泥釘、改善排水工程及景觀美化工程。

 

 

 


PART C (PERMIT CONDITIONS)

1.         General Conditions

       

1.1               The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499) and may become the subject of appropriate action being taken under the Ordinance.

 

1.2               The Permit Holder shall ensure full compliance with all legislation from time to time in force including without limitation the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Waste Disposal Ordinance (Cap. 354) and Country Parks Ordinance (Cap.208). This Permit does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation.

 

1.3               The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sites/offices covered by this Permit. Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register.

 

1.4               The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated by the Permit. The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter. 

 

1.5               The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular site entrances/exits or at a convenient location for public’s information at all times. The Permit Holder shall ensure that the most updated information about the Permit, including any amended Permit, is displayed at such locations. If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit. The suspended, varied or cancelled Permit shall be removed from display at the Project site(s).

 

1.6               The Permit Holder shall construct the Project in accordance with the project description in Part B of this Permit.

 

1.7               The Permit Holder shall ensure that the Project is designed and constructed in accordance with the information and recommendations described in the Project Profile (Register No. PP-339/2007) in the EIA Ordinance Register, the information and mitigation measures described in this Permit, mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit.

 

1.8               All submissions, as required under this Permit, shall be rectified and resubmitted in accordance with the comments, if any, made by the Director, within one month of the receipt of the Director’s comments or otherwise specified by the Director.

 

1.9               All submissions approved by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499).

 

1.10            The Permit Holder shall release all finalized submissions, as required under this Permit, to the public by depositing copies in the Environmental Impact Assessment Ordinance Register Office, or in any other places, or any internet websites as specified by the Director, or by any other means as specified by the Director for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of the submissions.

 

1.11            The Permit Holder shall notify the Director in writing the commencement date of construction of the Project no later than two weeks prior to the commencement of construction of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the construction.

 

1.12            All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalized submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

 

1.13            For the purpose of this Permit, “commencement of construction” does not include works related to site clearance and preparation or other works as agreed by the Director.

 

 

2.         Specific Conditions

 

2.1               No works shall be carried out outside the Project site boundary as indicated in Figure 1 and Figure 2 of this Permit.

 

2.2               No tree shall be felled within the Project site boundary.

 

2.3               All plant species of conservation importance within the Project boundary, including Brainea insignis, Camellia sp, Pavetta hongkongensis and Antirhea chinesis, shall be preserved.

 

2.4               The applicant shall submit to the Director for approval, at least four weeks before commencement of construction, five sets of Master Landscape Plan showing the followings:-

(i)                  locations of the plant species of conservation importance including Brainea insignis, Camellia sp, Pavetta hongkongensis and Antirhea chinesis;

(ii)                all existing trees within the works area and their corresponding canopy spreads;

(iii)               locations of soil nails and raking drains;

(iv)              proposed ring size for the plant species of conservation importance and trees located within sprayed concrete area with an explanatory note providing justification on the proposed ring sizes;

(v)                location of compensatory planting of coverage no less than 1200 m2, including hydroseeding of shrub mix and planting of whip, and planting of climbers.  Details of plant type shall also be shown;

(vi)              soil nails and raking drain shall be positioned to minimize potential damage to root system of nearby trees;

(vii)             colour scheme for the maintenance stairs and the sprayed concrete on the slope surface;

(viii)           a proposal to protect trees and species of conservation importance on site (e.g., surrounding with barricades, provision of temporary hessian armouring around tree trucks, etc.).

 

2.5               All mitigation measures in accordance with the approved Master Landscape Plan shall be fully implemented.

 

 

Notes :

 

1.                   This Permit consists of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit Conditions).  Any person relying on this permit should obtain independent legal advice on the legal implications under the Ordinance, and the following notes are for general information only.

 

2.         If there is a breach of any conditions of this Permit, the Director or his authorized officer may, with the consent of the Secretary for the Environment, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

 

3.         The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance (the “Ordinance”) to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the Project site by the amended permit.

 

4.         A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the Ordinance to the Director for a further environmental permit.

 

5.      Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for the Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled Permit shall be removed from display at the Project site.

 

 6.          If this Permit is cancelled or surrendered during construction of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued. It is an offence under Section 26 (1) of the Ordinance to construct a designated project listed in Schedule 2 of the Ordinance without a valid environmental permit.

 

7.         Any person who constructs the Project contrary to the conditions in the Permit, and is convicted of an offence under the Ordinance, is liable:

 

(i)              on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months;

(ii)            on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years;

(iii)           on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

(iv)          on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

(v)            in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied the offence continued.

 

8.                   The Permit Holder may appeal against any condition of this Permit under Section 17 of the Ordinance within 30 days of receipt of this Permit.

 

9.                   The Notes are for general reference only and that the Permit Holder should refer to the EIA Ordinance for details and seek independent legal advice.

 