Environmental Permit No. EP-333/2009
環境許可證編號No. EP-333/2009
ENVIRONMENTAL IMPACT ASSESSMENT
ORDINANCE
(CHAPTER 499)
Section 10
環境影響評估條例
(第499章)
第 10 條
ENVIRONMENTAL PERMIT
TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
建造及營辦指定工程項目的環境許可證
A部 (許可證主要部分)
Pursuant to Section 10 of the Environmental Impact Assessment Ordinance
(EIAO), the Director of Environmental Protection (the Director) grants this
environmental permit to the China Mobile Hong Kong Company Limited (hereinafter referred to as the "Permit
Holder") to construct and operate the designated project described in Part
B subject to the conditions specified in Part C. The issue of this
environmental permit is based on the documents, approvals or permissions
described below:
根據《環境影響評估條例》(環評條例)第10條的規定,環境保護署署長(署長)將本環境許可證批予中國移動香港有限公司(下稱”許可證持有人”),以建造及營辦 B部所說明的指定工程項目,但須遵守 C部所列明的條件。本環境許可證是依據下列文件、批准或許可而簽發:
|
Application No. 申請書編號: |
AEP-333/2009 |
||
|
Document in the
Register: 登記冊上的文件: |
(1)
Project Profile – “Proposed Installation of
Integrated Mobile Phone Base Station at Tai Tong Nursery, Tai Tong Shan Road,
Yuen Long, New Territories” (Register
No. PP-377/2009) 工程項目簡介 – “計劃於元朗大棠山路大棠苗圃安裝電訊發射站” (登記冊編號:PP-377/2009) (2)
Application for Environmental
Permit submitted by the Permit Holder on 許可證持有人於2009年2月26日提交的環境許可證申請 (申請書編號 AEP-333/2009) |
||
|
Director’s
Permission to Apply Directly for Environmental Permit 署長准許直接申請環境許可證 |
Letter Reference : (15) in EP2/N6/Q/124 信件檔號 : (15) in EP2/N6/Q/124 Date : 日期 : 2009年2月11日 |
||
March
2009 |
|
|
||
Date 日期 |
(WONG Hon-meng) Principal Environmental
Protection Officer (Strategic Assessment) for Director of
Environmental Protection 環境保護署署長 (首席環境保護主任(策略評估) 黃漢明 代行) |
|||
PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B部 (指定工程項目的說明)
Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to
as the “Permit”):
下列為本環境許可證(下稱“許可證”) A部所提述的指定工程項目的說明:
Title of
Designated Project 指定工程項目的名稱 |
Proposed Installation of
Integrated Mobile Phone Base Station at Tai Tong Nursery, 計劃於元朗大棠山路大棠苗圃安裝電訊發射站 [This
designated project is hereinafter referred to as “the Project”.] [這指定工程項目下稱“工程項目”] |
Nature of
Designated Project |
Earthworks and building works
in the 於大欖郊野公園內進行土木工事及建築工程 |
Location of
Designated Project 指定工程項目的地點 |
Tai Tong Nursery, 元朗大棠山路大棠苗圃 Figure 1 attached to this Permit shows the location of the Project. |
Scale and Scope
of Designated Project(s) 指定工程項目的規模和範圍 |
The Project is to construct and operate an integrated mobile phone base
station, which comprises an equipment platform with area of about 36m2 for
accommodating one equipment shelter and one transmission antenna post of 16m
in height, etc. 工程項目為建造及營辦一個電訊發射站,其包括一幅佔地約36平方米的設備平台,以裝置一個電訊儀器房及一支高16米的天線桿等。 |
C部 (許可證條件)
1.
General Conditions
一般條件
1.1 The
Permit Holder and any person working on the Project shall comply with all
conditions set out in this Permit. Any non-compliance by any person may
constitute a contravention of the Environmental Impact Assessment Ordinance
(Cap. 499) and may become the subject of appropriate action being taken under
the Ordinance.
許可證持有人及任何從事工程項目的人士必須符合本許可證載列的全部條件。任何人士如有不符合本許可證的情況,可能違反環境影響評估條例(「環評條例」)(第499章)的規定,而當局可根據環評條例採取適當行動。
1.2
The Permit Holder shall
ensure full compliance with all legislation from time to time in force
including without limitation to the Noise Control Ordinance (Cap. 400), Air
Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap.
358) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself
constitute any ground of defence against any proceedings instituted under any
legislation or imply any approval under any legislation.
許可證持有人須經常確保完全符合現行法例的規定,包括但不限於噪音管制條例(第400章);空氣污染管制條例(第311章);水污染管制條例(第358章);及廢物處置條例(第354章)。本許可證本身不會(a)就根據任何法例提起的法律程序構成任何抗辯理由,或(b)根據任何法例默示任何批准。
1.3
The Permit Holder shall make
copies of this Permit together with all documents referred to in this Permit or
the documents referred to in Part A of the
Permit readily available at all times for inspection by the Director or his
authorised officers at all sites/offices covered by this Permit. Any reference
to the Permit shall include all documents referred to in the Permit and also
the relevant documents in the Register.
許可證持有人須印製本許可證的複本,連同本許可證所述的所有文件或本許可證 A部所述文件,以供署長或獲授權人員任何時間內在本許可證所涵蓋的所有工地 / 辦事處查閱。凡提述本許可證,須包括本許可證所述的所有文件及登記冊內的相關文件。
1.4
The Permit Holder shall give
a copy of this Permit to the person(s) in charge of the site(s) and ensure that
such person(s) fully understands all conditions and all requirements
incorporated by the Permit. The
site(s) refers to site(s) of construction and operation of the Project and
shall mean the same hereafter.
許可證持有人須把本許可證的複本交予有關工地的負責人,並確保這些人士完全明白本許可證的所有條件與規定。工地是指建造及營辦工程項目的工地,下文所提及的工地亦屬同一意思。
1.5
The Permit Holder shall
display conspicuously a copy of this Permit on the Project site(s) at all
vehicular site entrances/exits or at a convenient location for public
information at all times. The Permit Holder shall ensure that the most updated
information about the Permit, including any amended permit, is displayed at
such locations. If the Permit Holder surrenders a part or the whole of the
Permit, the notice he sends to the Director shall also be displayed at the same
locations as the original Permit. The suspended, varied or cancelled Permit
shall be removed from display at the Project site(s).
許可證持有人須在工程項目的工地的所有車輛進出口或一處方便地點,顯眼地展示本許可證的複本,以供公眾在任何時間內閱覽。許可證持有人須確保在這些地點展示關於本許可證(包括任何經修訂的許可證)的最新資料。許可證持有人如交回許可證的部分或全部,必須把其送交署長的通知書,在備有原有許可證的相同地點展示。遭暫時吊銷、更改或取消的許可證必須從工程項目的工地除下,不再展示。
1.6
The Permit Holder shall construct and operate the Project in accordance with the
project descriptions in Part B of this Permit.
許可證持有人須依據本許可證 B部的工程項目說明,建造及營辦工程項目。
1.7
The Permit Holder shall ensure that the Project is designed, constructed
and operated in accordance with the information and recommendations described
in the Project Profile (Register No. PP-377/2009) in the Register, and the
information and mitigation measures described in this Permit. Where
recommendations referred to in the documents of the Register are not expressly
referred to in this Permit, such recommendations are nevertheless to be
implemented unless expressly excluded or impliedly amended in this Permit.
許可證持有人須確保工程項目的設計、建造及營辦,按照下述資料及措施辦理:登記冊內的工程項目簡介(登記冊編號:PP-377/2009)所說明的資料及建議;以及本許可證所說明的資料及緩解措施。登記冊內的文件所述建議如沒有在本許可證明確表示,則仍須實施這些建議,除非獲本許可證明確豁除或默示修訂。
1.8
The
Permit Holder shall notify the Director in writing the commencement date of
construction of the Project no later than two weeks prior to the commencement
of construction of the Project. The Permit Holder shall notify the Director in
writing immediately if there is any change of the commencement date of the
construction.
許可證持有人須在工程項目的建造工程展開前,至少提早2個星期以書面方式把建造工程的施工日期通知署長。施工日期如有任何更改,許可證持有人必須立即以書面方式通知署長。
1.9
For
the purpose of this Permit, “commencement of construction” does not include
works related to site clearance and preparation or other works as agreed by the
Director.
為執行本許可證,「建造工程的展開」不包括有關工地清理及預備的工程,或署長同意的其他工程。
2.
Specific Conditions
特定條件
2.1
The Permit
Holder shall construct and operate the Project only
at the location as indicated in Figure 1 of this Permit.
許可證持有人只可在本許可證圖1所示地點建造及營辦本工程項目。
2.2
No haul road shall be formed for the construction and the operation of
the Project.
不得為建造及營辦本工程項目搭建運料路。
2.3
All aboveground structures including the antennae and the antenna
post shall be painted in subdued colour to match with the surrounding natural
setting.
所有地面構築物(包括天線及天線桿)均須塗以柔和的顏色,以配合四周的自然環境。
Notes :
註
1. This Permit consists of three parts, namely, PART A (Main Permit), PART
B (Description of Designated Project) and PART C (Permit Conditions). Any
person relying on this Permit should obtain independent legal advice on the
legal implications under the Ordinance, and the following notes are for general
information only.
本許可證共有3部,即A部(許可證主要部分);B部(指定工程項目的說明)及C部(許可證條件)。任何援引本許可證的人士須就環評條例的法律含意徵詢獨立法律意見,下述註解只供一般參考用。
2. If there is a breach of any conditions of this Permit, the Director or
his authorized officer may, with the consent of the Secretary for the
Environment, order the cessation of associated work until the remedial action
is taken in respect of the resultant environmental damage, and in that case the
Permit Holder shall not carry out any associated works without the permission
of the Director or his authorized officer.
如違反本許可證的任何條件,署長或獲授權人員可在環境局局長的同意下勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或獲授權人員同意,不得進行任何相關工程。
3. The Permit Holder may apply under Section 13 of the Ordinance to the
Director for a variation of the conditions of this Permit. The Permit Holder
shall replace the original permit displayed on the construction site by the
amended permit.
許可證持有人可根據環評條例(該「條例」)第13條的規定向署長申請更改本許可證的條件。許可證持有人須以經修訂的許可證替換在工程項目的工地內展示的原有許可證。
4. A person who assumes the responsibility for the whole or a part of the
designated project may, before he assumes responsibility of the designated
project, apply under Section 12 of the Ordinance to the Director for a further
environmental permit.
承擔工程項目整項或部分工程的責任的人,在承擔責任之前,可根據該條例第12條的規定向署長申請新的環境許可證。
5. Under Section 14 of the Ordinance, the Director may with the consent of
the Secretary for the Environment, suspend, vary or cancel this Permit. The
suspended, varied or cancelled Permit shall be removed from display at the
construction site.
根據該條例第14條的規定,署長可在環境局局長的同意下暫時吊銷、更改或取消本許可證。遭暫時吊銷、更改或取消的環境許可證必須從工程項目的工地除下,不再展示。
6.
If this Permit
is cancelled or surrendered during construction of the Project, another
environmental permit must be obtained under the Ordinance before the
construction or operation of the Project could be continued. It is an offence
under Section 26(1) of the Ordinance to construct or operate a designated
project listed in Part I of Schedule 2 of the Ordinance without a valid
environmental permit.
如本許可證在工程項目建造期間取消或交回,則在繼續進行工程項目之前,必須先根據該條例規定取得另一份環境許可證。根據該條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下建造或營辦該條例附表2所列明的指定工程項目,即屬違法。
7. Any person who constructs or operates the
Project contrary to the conditions in the Permit, and is convicted of an
offence under the Ordinance, is liable: -
如任何人在違反本許可證的條件下建造或營辦工程項目,根據該條例,即屬違法:
(i)
on
a first conviction on indictment to a fine of $2 million and to imprisonment
for 6 months;
一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;
(ii)
on
a second or subsequent conviction on indictment to a fine of $5 million and to
imprisonment for 2 years;
一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;
(iii)
on
a first summary conviction to a fine at level 6 and to imprisonment for 6
months;
一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;
(iv)
on
a second or subsequent summary conviction to a fine of $1 million and to
imprisonment for 1 year; and
一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;以及
(v)
in
any case where the offence is of a continuing nature, the court or magistrate
may impose a fine of $10,000 for each day on which he is satisfied the offence
continued.
在任何情況下如該罪行屬連續性質,法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。
8. The Permit Holder may appeal against any condition of this Permit under
Section 17 of the Ordinance within 30 days of receipt of this Permit.
許可證持有人可在接獲本許可證後30天內,根據該條例第17條就本許可證的任何條件提出上訴。
9. The Notes are for general reference only and that the Permit Holder
should refer to the EIA Ordinance for details and seek independent legal
advice.
上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。
Environmental
Permit No. EP-333/2009
環境許可證編號 EP-333/2009
| Figure
1 |