Environmental Permit No. EP-373/2009
環境許可證編號EP-373/2009
ENVIRONMENTAL IMPACT ASSESSMENT
ORDINANCE
(CHAPTER
499)
Section
10
環境影響評估條例
(第499章)
第 10 條
ENVIRONMENTAL
PERMIT TO CONSTRUCT A DESIGNATED PROJECT
建造指定工程項目的環境許可證
A部 ( 許可證主要部分)
Pursuant to Section 10 of the Environmental Impact Assessment Ordinance
(the Ordinance), the Director of Environmental Protection (the
Director) grants this environmental permit to the Antiquities and Monuments
Office, Leisure and Cultural Services Department (hereinafter
referred as the “Permit Holder”) to construct the designated
project described in Part B subject to the conditions specified in Part C. The
issue of this environmental permit is based on the documents, approvals or
permissions described below:
根據環境影響評估條例(本條例) 第10條的規定,環境保護署署長 (署長) 將本環境許可證批予康樂及文化事務署古物古蹟辦事處 (下稱許可證持有人) 以建造B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證依據下列文件、批准或許可而簽發:
|
Application No. 申請書編號 |
AEP-373/2009 |
||
|
Document
in the Register 登記冊上的文件 |
(1)
Project
Profile – “Restoration to Tang Ancestral Hall and its Adjoining Buildings at
Ha Tsuen, Yuen Long, New Territories” (
Register No.: PP-393/2009 ) 工程項目簡介 – “新界元朗廈村鄧氏宗祠及其鄰接建築物修復工程” ( 登記冊編號:PP-393/2009 ) (2) The Director’s letter of permission to
apply directly for environmental permit dated ( Ref. : (12) in EP2/N6/Q/129 ) 署長於2009年8月4日簽發的批准直接申請環境許可證的信件 (檔案編號
: (12) in EP2/N6/Q/129 ) (3) Application for Environmental Permit submitted on 於2009年8月10日提交的環境許可證的申請 (
申請書編號 : AEP-373/2009 ) |
||
|
|
|
||
Date 日期 |
( WONG Hon-meng ) Principal Environmental Protection Officer ( Strategic Assessment ) for Director of Environmental Protection 環境保護署署長 (署理首席環境保護主任(策略評估) 黃漢明 代行) |
|||
PART B ( DESCRIPTION OF DESIGNATED PROJECT )
B部 (指定工程項目的說明)
Hereunder is the description of the designated project mentioned in Part
A of this environmental permit (hereinafter referred to as
the “Permit” ) :
下列為本環境許可證 (下稱 “許可證” ) A部所提述的指定工程項目的說明 :
Title
of Designated Project 指定工程項目的名稱 |
Restoration to Tang Ancestral Hall and its Adjoining Buildings at Ha Tsuen, Yuen Long, New Territories 新界元朗廈村鄧氏宗祠及其鄰接建築物修復工程 [ This designated project is hereinafter referred to as “the Project” ] [ 這指定工程項目下稱 “工程項目” ] |
Nature of Designated
Project 指定工程項目的性質 |
Restoration works in a declared monument 於法定古蹟進行修復工程 |
Location
of Designated Project 指定工程項目的地點 |
Ha Tsuen, Yuen Long 元朗廈村 Location
of the Project is shown in Figure 1 attached to this Permit. 工程項目的位置載於本許可證附圖1。 |
Scale and Scope of Designated Project(s) 指定工程項目的規模和範圍 |
The scope of
the Project include — 工程範圍包括 — (i)
demolish later-added reinforced concrete structures, metal structures
(except the metal gates at the front and middle halls) and cement paving in
the Ancestral Hall and restore to its original layout ; 拆卸宗祠內後加的石屎結構、金屬結構( 除位於前進及中進的鐵閘) 及水泥鋪地,以恢復原有布局; (ii)
repair/replace defective roof structure, including roof tiles, purlins,
rafters, truss system, etc and reconstruct the roofs with termite-proofed
timber and new tiling as necessary; make good and retouch stucco mouldings on
ridges and gables and other artwork; 維修/更換殘損的屋頂結構,包括屋面瓦、桁桷、梁架結構等,及以經防白蟻處理的木料及新瓦如所需重建屋面;修補及修飾屋脊及山牆的灰塑,以及其他繪製裝飾; (iii)
repair/restore defective carpentry and decorations, such as windows,
doors, carved beams, camel’s humps, eaves boards, altar, murals, etc. ; 維修/修復殘損的木作及裝飾,如門窗、雕梁、駝峯、封檐板、神龕及壁畫等; (iv)
remove modern paint on green-brick walls and stones to expose the
original surfaces; repair and re-point the external and internal brick walls
and “dentist” replacement to individual damaged bricks; 清除青磚及石作上的現代油漆,以重現原有的表層。維修宗祠內外磚牆及勾縫,並以新磚逐塊更換個別殘損的磚作; (v)
restore floor paving in the Ancestral Hall, including canton tiles,
lime-sand screeding, red sandstone and granite slabs; 修復宗祠內的鋪地,包括廣東大階磚,灰沙鋪地、紅砂岩及花崗石; (vi)
restore demolished verandah and timber screen doors in Yau Kung School; 修復友恭學校內倒塌的遊廊及格扇門; (vii)
restore window and door openings throughout the Ancestral Hall; and 修復宗祠內所有窗及門的開口; 及 (viii)
improve the drainage system. 改善排水系統。 |
C部 ( 許可證條件 )
1.
General Conditions
一般條件
1.1 The Permit Holder and any
person working on the Project shall comply with all conditions set out in this
Permit. Any non-compliance by any
person may constitute a contravention of the Environmental Impact Assessment
Ordinance (Cap. 499) and may become the subject of appropriate action being
taken under the Ordinance.
許可證持有人必須完全遵守本許可證的全部條件。任何人士如有不遵守本許可證的情況,則可能構成違反環境影響評估條例(第499章)的規定,而當局可根據條例採取適當行動。
1.2
The Permit Holder shall ensure
full compliance with all legislation from time to time in force including
without limitation to the Noise Control Ordinance (Cap. 400), Air Pollution
Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358) and
Waste Disposal Ordinance (Cap. 354). This Permit does not of itself constitute
any ground of defence against any proceedings instituted under any legislation
or imply any approval under any legislation.
許可證持有人須經常確保完全遵守現行法例,包括但不限於噪音管制條例(第400章);空氣污染管制條例(第311章);水污染管制條例(第358章) 及廢物處置條例(第354章)。根據任何法例掀起的法律程序,本許可證本身不能作為任何抗辯理據或視為某法例所默許。
1.3
The Permit Holder shall make
copies of this Permit together with all documents referred to in this Permit or
the documents referred to in Part A of the
Permit readily available at all times for inspection by the Director or his
authorised officers at all sites/offices covered by this Permit. Any reference to the Permit shall include
all documents referred to in the Permit and also the relevant documents in the
Register.
許可證持有人須複印本許可證及本許可證所述的所有文件,或本許可證A部所述的文件,以供署長或其授權人士在本許可證所涵蓋的所有工地/辦事處隨時查閱。凡提及本許可證,即包括本許可證所述的所有文件和登記冊內的相關文件。
1.4
The Permit Holder shall give
a copy of this Permit to the person(s) in charge of the site(s) and ensure that
such person(s) fully understands all conditions and all requirements
incorporated by the Permit. The
site(s) refers to site(s) of construction of the Project and shall mean the
same hereafter.
許可證持有人須把本許可證的一份副本交予相關工地的負責人,並確保這些人士完全明白本許可證內載的所有條件與規定。工地是指本工程項目的建造工地,下文所提及的工地亦屬同一意思。
1.5
The Permit Holder shall
display conspicuously a copy of this Permit on the Project site(s) at all
vehicular site entrances/exits or at a convenient location for public
information at all times. The
Permit Holder shall ensure that the most updated information about the Permit,
including any amended permit, is displayed at such locations. If the Permit Holder surrenders a part or
the whole of the Permit, the notice he sends to the Director shall also be
displayed at the same locations as the original Permit. The suspended, varied or cancelled Permit
shall be removed from display at the Project site(s).
許可證持有人須在有關建造工地的所有車輛進出口或一處方便地點,顯眼地展示本許可證的副本,以供公眾在任何時間內閱覽。許可證持有人須確保有關本許可證的最新資料,包括經修訂的許可證,在這些地點展示。如果許可證持有人交回許可證的部分或整分,其送交署長的通知書,亦須在展示原有許可證的同一地點展列。遭暫時吊銷、更改或取消的許可證必須從工地除下移走,不再展示。
1.6
The Permit Holder shall construct
the Project in accordance with the project descriptions in Part B of this Permit.
許可證持有人須依據本許可證B部的工程項目說明,建造本工程項目。
1.7
The Permit Holder shall ensure that the Project is designed and
constructed in accordance with the information and recommendations described in
the Project Profile (Register No. PP-393/2009) in the Register, and the
information and mitigation measures described in this Permit. Where recommendations referred to in the
documents of the Register are not expressly referred to in this Permit, such
recommendations are nevertheless to be implemented unless expressly excluded or
impliedly amended in this Permit.
許可證持有人須確保工程項目的設計及建造,符合登記冊內的工程項目簡介(登記冊編號:PP-393/2009)所說明的資料及建議;以及本許可證所說明的資料及緩解措施。即使登記冊文件所述的建議沒有在本許可證內明確引述,這些建議仍須實施,除非在本許可證內明確地表示豁除或默示已修訂。
1.8
The Permit Holder shall notify the
Director in writing the commencement date of construction of the Project no
later than 2 weeks prior to commencement of construction of the Project. The Permit Holder shall notify the
Director in writing immediately if there is a change of the commencement date
of the construction.
許可證持有人須在工程項目施工前至少兩個星期,以書面通知署長施工開始的日期。如開始施工的日期有所更改,許可證持有人必須立即以書面通知署長。
1.9
For
the purpose of this Permit, “commencement of construction” does not include
works related to site clearance and preparation or other works as agreed by the
Director.
按照本許可證的目的,「建造工程的展開」不包括有關工地清理及預備的工程,或署長同意的其他工程。
2.
Specific Conditions
特定條件
2.1
To
minimize environmental impacts caused to the sensitive receivers nearby, only
hand-held powered tools and hand-held manual tools shall be
used for carrying out the restoration works of the Project.
為減輕對鄰近感應強的地方的環境影響,只可使用可攜式的電動及手動工具進行本工程項目的修復工程。
Notes
註
1.
This Permit consists of
three parts, namely, Part A (Main Permit), Part B (Description of Designated
Project) and Part C (Permit Conditions). Any person relying on this Permit should
obtain independent legal advice on the legal implications under the Ordinance,
and the following notes are for general information only.
本許可證共有3部,即A部(許可證主要部分);B部(指定工程項目的說明)及C部(許可證條件)。任何援引本許可證的人士須就環評條例的法律含意徵詢獨立法律意見,下述註解只供一般參考用。
2.
If there is a breach of any
conditions of this Permit, the Director or his authorized officer may, with the
consent of the Secretary for the Environment, order the cessation of associated
work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
如違反本許可證的任何條件,署長或獲授權人員可在環境局局長的同意下,勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或其授權人員同意,不得進行任何相關工程。
3.
The Permit Holder may apply
under Section 13 of the Ordinance to the Director for a variation of the
conditions of this Permit. The
Permit Holder shall replace the original permit displayed on the construction
site by the amended permit.
許可證持有人可根據本條例第13條的規定,向署長申請更改本許可證的條件。許可證持有人須以經修訂的許可證替換在工程項目的工地內展示的原有許可證。
4.
A person who assumes the
responsibility for the whole or a part of the designated project may, before he
assumes responsibility of the designated project, apply under Section 12 of the
Ordinance to the Director for a further environmental permit.
承擔本工程項目整項或部分工程的責任的人,在承擔本工程項目責任之前,可根據本條例第12條的規定,向署長申請新的環境許可證。
5.
Under Section 14 of the
Ordinance, the Director may with the consent of the Secretary for the
Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the construction site.
根據本條例第14條的規定,署長可在環境局局長的同意下暫時吊銷、更改或取消本許可證。遭暫時吊銷、更改或取消的環境許可證必須從工程項目的工地除下,不再展示。
6.
If this Permit is cancelled
or surrendered during construction of the Project, another environmental permit
must be obtained under the Ordinance before construction of the Project could
be continued. It is an offence
under Section 26(1) of the Ordinance to construct or operate a designated
project listed in Part I of Schedule 2 of the Ordinance without a valid
environmental permit.
如在工程項目建造期間本許可證被取消或交回,則須在繼續建造本工程項目之前,根據本條例取得另一份環境許可證。根據本條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下,建造或營辦本條例附表2所列明的指定工程項目,即屬違法。
7.
Any person who constructs the Project contrary to the conditions
in the Permit, and is convicted of an offence under the Ordinance, is liable —
如任何人在違反本許可證的條件下建造工程項目,根據該條例,即屬違法
—
(i)
on
a first conviction on indictment to a fine of $2 million and to imprisonment
for 6 months;
一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;
(ii)
on
a second or subsequent conviction on indictment to a fine of $5 million and to
imprisonment for 2 years;
一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;
(iii)
on
a first summary conviction to a fine at level 6 and to imprisonment for 6
months;
一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;
(iv)
on
a second or subsequent summary conviction to a fine of $1 million and to
imprisonment for 1 year; and
一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;以及
(v)
in
any case where the offence is of a continuing nature, the court or magistrate
may impose a fine of $10,000 for each day on which he is satisfied the offence
continued.
在任何情況下如該罪行屬連續性質,則法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。
8.
The Permit Holder may appeal
against any condition of this Permit under Section 17 of the Ordinance within
30 days of receipt of this Permit.
許可證持有人可在接獲本許可證後30天內,根據條例第17條就本許可證的任何條件提出上訴。
9.
The Notes are for general
reference only and that the Permit Holder should refer to the EIA Ordinance for
details and seek independent legal advice.
上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。
Environmental
Permit No. EP-373/2009
環境許可證編號
Project Title - Restoration to Tang Ancestral Hall and its Adjoining Buildings at
Ha Tsuen, Yuen Long, New Territories 工程名稱 - 新界元朗廈村鄧氏宗祠及其鄰接建築物修復工程 |
|
|
Figure
1 – Location Plan 圖1 - 位置圖 |
Environmental Permit No.
: EP-373/2009 環境許可證編號 |
|