Environmental Permit No. EP-477/2013
Àô¹Ò³\¥iÃÒ½s¸¹ EP-477/2013
ENVIROFNMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER
499)
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10±ø
ENVIRONMENTAL
PERMIT TO CONSTRUCT AND OPERATE
DESIGNATED
PROJECTS
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant
to section 10 of the Environmental Impact Assessment Ordinance (EIAO), the
Director of Environmental Protection (the Director) grants this environmental
permit to Civil Engineering and
Development Department (hereinafter
referred to as the "Permit Holder") to construct and operate the designated
projects described in Part B subject to the
conditions specified in Part C. The issue of
this environmental permit is based on the documents, approvals or permissions
described below:
®Ú¾ÚÀô¹Ò¼vÅTµû¦ô±ø¨Ò²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»Àô¹Ò³\¥iÃҧ天¤g¤ì¤uµ{©Ý®i¸p (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¥H«Ø³y¤ÎÀç¿ìB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦u C³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§åã©Î³\¥i§@¬°®Ú¾Ú¡G
Application No. ¥Ó½Ð®Ñ½s¸¹ |
AEP-477/2013
|
|||
Document in the
Register : µn°O¥U¤Wªº¤å¥ó: |
1.
Development of Lok Ma Chau Loop (Register No. AEIAR-176/2013): - Environmental
Impact Assessment (EIA) Report [Hereinafter
referred to as the ¡§EIA Report¡¨] -
Environmental Monitoring and Audit (EM&A)
Manual [Hereinafter referred to
as the ¡§EM&A Manual¡¨] -
Executive Summary ¸¨°¨¬wªe®M¦a°Ïµo®i (µn°O¥U½s¸¹¡GAEIAR-176/2013): - Àô¹Ò¼vÅTµû¦ô³ø§i [¤UºÙ¡uÀôµû³ø§i¡v] - Àô¹ÒºÊ¹î¤Î¼f®Öp¹º [¤UºÙ¡uÀôºÊ¤â¥U¡v] - Àôµû¦æ¬FºKn
2.
The Director¡¦s letter of approval of the EIA
Report dated 25 October 2013 referenced (85) in EP2/G/S3/ ¸pªø©ó 3.
Application for Environmental Permit and all attachments
submitted by the Permit Holder on 29 October 2013 (Application No.: AEP-477/2013)
©ó |
|||
|
22 November 2013 |
|
||
|
Date ¤é´Á |
|
(WONG Hon-meng) Principal Environmental Protection Officer (Strategic Assessment) for Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô(µ¦²¤µû¦ô)黄º~©ú¥N¦æ) |
|
PART B
(DESCRIPTION OF DESIGNATED PROJECTS)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the
description of the designated projects mentioned in Part A
of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ ¡§³\¥iÃÒ¡¨)A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
(i) Ecological Area (referred to as ¡§DP (ii) (iii) Direct Link to MTR LMC Station (referred to
as ¡§DP (iv) Drainage System under Internal Transport
Networks (referred to as ¡§DP (v) Sewage Treatment Works (STW) (referred to as ¡§DP (vi) Flushing Water Service Reservoir (referred to
as ¡§DP in
the Development of LMC (These
designated project elements are collectively hereafter referred to as ¡§the
Project¡¨.) Remarks: This Permit does not cover the ¸¨°¨¬wªe®M¦a°Ïµo®i¡G (i)
¥ÍºA°Ï(Àôµû³ø§i¤¤©Ò«üªº¡uDP1¡v) ; (ii) ¦è±³s±µ¸ô¡]¥]¬A¸¨°¨¬w¸ô³s±µ¦Ü¯»À/·s¥Ð¤½¸ô¬q¡^(Àôµû³ø§i¤¤©Ò«üªº¡uDP2¡v)¡F (iii) ³s±µ´äÅK¸¨°¨¬w¯¸ªºª½±µ³q¹D(Àôµû³ø§i¤¤©Ò«üªº¡uDP3¡v)¡F (iv) °Ï内¥æ³qºô¤Uªº±Æ¤ôºÞºô
(Àôµû³ø§i¤¤©Ò«üªº¡uDP4¡v); (v) ¦Ã¤ô³B²z¼t(Àôµû³ø§i¤¤©Ò«üªº¡uDP5¡v)¡F¥H¤Î (vi) ¨R厠¥Î¤ô°t¤ô®w(Àôµû³ø§i¤¤©Ò«üªº¡uDP7¡v) ¡C (³o¨Ç«ü©w¤uµ{¶µ¥Ø¤¸¯À¥H¤U²ÎºÙ¡u¤uµ{¶µ¥Ø¡v¡C) µù: ¥»³\¥iÃÒ¤£¥]¬AªF±³s±µ¸ô¡AÀôµû³ø§i¤¤©Ò«üªº¡uDP6¡v¡C |
Nature of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº©Ê½è |
(i)
a flood storage pond more than (ii)
a road partly in a conservation area; (iii)
a road bridge more than (iv)
a drainage channel system which discharges
into an area which is less than (v)
a sewage treatment works with an installed
capacity of more than (vi)
an activity for
the reuse of treated sewage effluent from a treatment plant and partly in a
conservation area. (i)
±¿n¶W¹L10¤½³¼ªº»W¬x¦À¡F (ii)
³¡¤À¦ì©ó¦ÛµM«O¨|°Ïªº¸ô¬q¡F (iii)
¾ô¥x¤§¶¡ªø«×¶W¹L100¦Ì¡A³¡¤À¸ô¬q¦ì©ó¦ÛµM«O¨|°Ïªº¹D¸ô¾ô¡F (iv)
±Æ¤ô¥X¤f¶ZÂ÷¦ÛµM«O¨|°Ï³Ìªñ¬É½u¤Ö©ó300¦Ìªº±Æ¤ôºÞ¹D¨t²Î¡F (v)
³]p³B²z¯à¤O¦h©ó¨C¤é5,000¥ß¤è¦Ì¡A¶ZÂ÷¤@©Ò³W¹º¤¤ªº±Ð¨|¾÷ºc³Ìªñ¬É½u¤Ö©ó200¦Ì¡A¨Ã¥]¬A¦³´`Àô¦A¥Î¸g³B²z¦Ã¤ô³]³Æªº¦Ã¤ô³B²z¼t¡F¥H¤Î (vi)
´`Àô¦A¥Î¨Ó¦Û¤@©Ò³B²z¼tªº¸g³B²z¦Ã¤ô¡A³¡¤À¤uµ{¶µ¥Ø¦ì©ó¦ÛµM«O¨|°Ï¤º¡C |
Location of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº¦aÂI |
Lok
Ma Chau Loop and nearby areas. The location of the Project is shown in Figure 1 of this Permit. ¸¨°¨¬wªe®M¦a°Ï¤Î¾Fªñ¦a¤è¡C ¤uµ{¶µ¥Øªº¦ì¸m¸ü©ó¥»³\¥iÃÒªº¹Ï1¡C |
Scale and Scope of Designated Project(s) |
The
scope of the Project includes: (i)
about (ii)
a 2-lane single carriageway road, about (iii)
a viaduct, as a linkage between the LMC Loop and
the proposed elevated public transport interchange (PTI) at MTR LMC Station,
about (iv)
a drainage channel system mainly under the
internal transport network including Main Road M1, Road L1 and Road L2 within
the LMC Loop, and the associated utilities; (v)
a sewage treatment works, with tertiary
treatment level, site footprint of about (vi)
a water service reservoir for the reuse of TSE
from a sewage treatment plant with a site footprint of about (vii)
the site formation works; and (viii)
other associated works. ¤uµ{¶µ¥Øªº½d³ò¥]¬A: (i)
±¿n¬ù¬°12.78¤½³¼ªº¥ÍºA°Ï¡A§@¬°Äª¸«Àã¦a¸ÉÀv°Ï¡A¦¸n§@¥Î¬°»W¬x¦À¡F (ii)
¤@±øªø¬ù1.3¤½¨½(¥Dn¹D¸ô)¤Î480¦Ì(³s±µ¸ô)ªºÂù½u¤£¤À¹j¨®¸ô¡A±µ³s¸¨°¨¬wªe®M¦a°Ï¤Î¥~³ò¹D¸ô©M¦ì©ó·s¥Ð¤½¸ô¡þ«C¤s¤½¸ôªº¤½¸ôºô¡A¤èªk¥Dn¬°ÂXÁï²{¦³¤UÆW§ø¸ô¤Î¸¨°¨¬w¸ô(¦a±)¤Î¿³«Ø¤@±ø«e©¹·s¥Ð¥æ¶×³Bªº·s³s±µ¸ô¡F¨ä¥L²Õ¦¨³¡¤À¥]¬A: «Ø¿v¥Î¹B®Æ¸ô¡B¤½¥Î³]¬I(¨Ò¦p: ¤ôºÞ¡B±Æ¤ô´ë¤Î¹qÆlµ¥)¡B¹jµ«Ì©M³æ¨®®|¡F (iii)
¤@±øªø¬ù770¦Ìªº°ª¬[¾ô¡A¥Î¥H±µ»é¸¨°¨¬wªe®M¦a°Ï¤Î¦ì©ó´äÅK¸¨°¨¬w¯¸ªºÀÀij°ª¬[¤½¦@¥æ³q¥æ¶×³B¡C¨ä¥L²Õ¦¨³¡¤À¥]¬A: «Ø¿v¥Î¹B®Æ¸ô¡B¤½¥Î³]¬I(¨Ò¦p: ¤ôºÞ¡B±Æ¤ô´ë¤Î¹qÆlµ¥)¤Î¹jµ«Ì¡þÅ@Äæ¡F (iv)
¥Dn¬°¸¨°¨¬wªe®M¦a°Ï°Ï¤º¥æ³qºô¤Uªº±Æ¤ôºÞ¹D¨t²Î¡A¥H¤Î¬ÛÃö¤½¥Î³]¬I¡F (v)
¤@©Ò¹F¤T¯Å³B²z¤ô¥¡A±¿n¬ù¬°2.1¤½³¼¡A¦b§ò©u®É¥§¡¬y¶q¬°¨C¤é18,000¥ß¤è¦Ìªº¦Ã¤ô³B²z¼t¡F¨ä¥L²Õ¦¨³¡¤À¥]¬A¥Î¥H´`Àô¦A¥Î¸g³B²z¦Ã¤ôªº³]¬I¡B¦A³y¤ô½ÕÀ£¬û©Ð¡B¦A³y¤ô¼WÀ£¬¦©Ð©M¦A³y¤ô´â±µÄ²¦À¡F (vi)
¥Î¥H´`Àô¦A¥Î¨Ó¦Û¤@©Ò¦Ã¤ô³B²z¼tªº¸g³B²z¦Ã¤ôªº°t¤ô®w¡A±¿n¬ù¬°1,350¥¤è¦Ì¡A®e¶q¬ù3,375¥ß¤è¦Ì¡A¦P®É¥]¬A200¦Ìªøªº³q¸ô¤Î¨Ñ´`Àô¦A¥Î¸g³B²z¦Ã¤ô¥Îªº¬ÛÃö«ü©w¤ôºÞ¡F (vii)
¦a½L¥¾ã¤uµ{¡F¥H¤Î (viii)
¨ä¥L¬ÛÃö¤uµ{¡C |
1. General
Conditions
1.1
The
Permit Holder and any person working on the Project shall comply with all
conditions set out in this Permit. Any non-compliance by any person may
constitute a contravention of the Environmental Impact Assessment Ordinance
(Cap.499) and may become the subject of appropriate action being taken under
the Ordinance.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]¤UºÙ ¡uÀôµû±ø¨Ò¡v¡^¡]²Ä499³¹¡^ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2
The Permit Holder shall ensure full compliance
with all legislation from time to time in force including, without limitation
to, the Air Pollution Control Ordinance (Cap. 311), Noise Control Ordinance
(Cap. 400), Water Pollution Control Ordinance (Cap. 358), and Waste Disposal
Ordinance (Cap. 354). This Permit does not of itself constitute any ground of
defense against any proceedings instituted under any legislation or imply any
approval under any legislation.
³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä311³¹)¡B¡m¾¸µºÞ¨î±ø¨Ò¡n(²Ä400³¹)¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä358³¹)¤Î¡m¼oª«³B¸m±ø¨Ò¡n(²Ä354³¹)¡C¥»³\¥iÃÒ¥»¨¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3
The Permit Holder shall make copies of this
Permit together with all documents referred to in this Permit and the documents
referred to in Part A of this Permit readily
available at all times for inspection by the Director or his authorized
officers at all sites/offices covered by this Permit. Any reference to the
Permit shall include all documents referred to in the Permit and also the
relevant documents in the Register
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a / ¿ì¨Æ³B¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4
The Permit Holder shall give a copy of this
Permit to the person(s) in charge of the site(s) and ensure that such person(s)
fully understands all conditions and all requirements incorporated by the
Permit. The site(s) refers to site(s) of construction and operation of the
Project and shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº½Æ¥»¥æ¤©¦³Ãö¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤ÎÀç¿ë¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
1.5
The Permit Holder shall display conspicuously a
copy of this Permit on the construction site(s) at all vehicular site
entrances/exits or at a convenient location for public¡¦s information at all
times. The Permit Holder shall ensure that the most updated information about
the Permit, including any amended Permit, is displayed at such locations. If
the Permit Holder surrenders a part or the whole of this Permit, the notice he
sends to the Director shall also be displayed at the same locations as the
original Permit. The suspended, varied or cancelled Permit shall be removed
from display at the construction site(s).
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Øªº¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6
The Permit Holder shall construct and operate the
Project in accordance with the project description in Part
B of this Permit (hereafter referred to as ¡§the Project¡¨).
³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A«Ø³y¤ÎÀç¿ë¤uµ{¶µ¥Ø¡]¤UºÙ¡u¤uµ{¶µ¥Ø¡v¡^¡C
1.7
The Permit Holder shall ensure that the Project
is designed, constructed and operated in accordance with the information and
recommendations described in the approved EIA Report (Register No. AEIAR-176/2013)
as described in Part A of this Permit; the
Director¡¦s letter of approval of the EIA Report dated 25 October 2013
referenced (85) in EP2/G/S3/
³\¥iÃÒ«ù¦³¤H¡A¶·½T«O¤uµ{¶µ¥Øªº³]p¡B«Ø³y¤ÎÀç¿ì¡A«ö·Ó¥»³\¥iÃÒA³¡´£¤Îªº¤Uz¸ê®Æ¤Î«Øij¿ì²z¡GÀò§å㪺Àôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-176/2013¡^¡B¸pªø©ó
1.8
All deposited submissions, as required under
this Permit, shall be rectified and resubmitted in accordance with the
comments, if any, made by the Director within one month of the receipt of the
Director¡¦s comments or otherwise specified by the Director.
©Ò¦³«ö¥»³\¥iÃÒ³W©w¦s©ñªº´£¥æ¤å¥ó¡A¶·¦b±µÀò¸pªøªº·N¨£¡]¦p¦³ªÌ¡^«á1Ӥ뤺¡]°£«D¸pªø¥t¦æ«ü©w¡^¡A®Ú¾Ú¸pªøªº·N¨£¥[¥H×¥¿¨Ã«·s¦V¸pªø´£¥æ¡C
1.9
All submissions approved by the Director, all
submissions deposited without comments by the Director, or all submissions
rectified in accordance with comments by the Director under this Permit shall
be construed as part of the permit conditions described in Part
C of this Permit. Any variation of the submissions shall be approved by the
Director in writing or as prescribed in the relevant permit conditions. Any
non-compliance with the submissions may constitute a contravention of the
Environmental Impact Assessment Ordinance (Cap.499). All submissions or any
variation of the submissions shall be certified by the Environmental Team (ET)
Leader and verified by the Independent Environmental Checker (IEC) referred to
in Conditions 2.1 and 2.2 below before submitting to the Director under this
Permit.
¸pªø§å㪺©Ò¦³´£¥æ¤å¥ó¡B¸pªø¨S¦³µ¹¤©·N¨£ªº©Ò¦³¦s©ñ¤å¥ó¤Î®Ú¾Ú¥»³\¥iÃÒ³W©w¥Ñ¸pªøµ¹¤©·N¨£×¥¿ªº©Ò¦³´£¥æ¤å¥ó¡A§¡¶·¸àÄÀ¬°¥»³\¥iÃÒC³¡»¡©úªº³\¥iÃÒ±ø¥óªº¤@³¡¤À¡C´£¥æ¤å¥ó¦p¦³¥ô¦ó×q¡A§¡¶·Àò¸pªøªº®Ñ±§åã¡A©Î²Å¦X¦³Ãö³\¥iÃÒ±ø¥óq©úªº³W©w¡C¦p¦³¤£²Å¦X´£¥æ¤å¥óªº±¡ªp¡A«h¥i¯à¹H¤ÏÀô¹Ò¼vÅTµû¦ô±ø¨Ò (²Ä499³¹) ªº³W©w¡C©Ò¦³´£¥æ¤å¥ó©Î´£¥æ¤å¥óªº¥ô¦ó×q¥»¡A§¡¶·«ö¤U¤å±ø¥ó²Ä2.1¤Î2.2¶µ©Òz¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AµM«á¤~«ö¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æ¡C
1.10
The Permit Holder shall release all finalized
submissions, as required under this Permit, to the public by depositing copies
in the Environmental Impact Assessment Ordinance Register Office, or in any
other places, or any internet websites as specified by the Director, or by any
other means as specified by the Director for public inspection. For this
purpose, the Permit Holder shall provide sufficient copies of the submissions.
³\¥iÃÒ«ù¦³¤H¶·§â©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Z¤½¶}µ¹¤½²³¤H¤hª¾¹D¡A¤èªk¬O§â¦³Ãö¤å¥ó½Æ¥»¦s©ñ©óÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¦a¤è¡A©Î¸pªø«ü©wªº¥ô¦ó¤¬Ápºôºô¯¸¡A©Î±Ä¨ú¸pªø«ü©wªº¥ô¦ó¨ä¥L¤èªk¡A¥H¨Ñ¤½²³¬d¾\¡C¦]¦¹¡A³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¨¬°÷¼Æ¶qªº½Æ¥»¡C
1.11
All submissions to the Director required under
this Permit shall be delivered either in person or by registered mail to the
Environmental Impact Assessment Ordinance Register Office (currently at 27/F,
Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of
all finalized submissions required under this Permit shall be prepared in Hyper
Text Markup Language (HTML) (version 4.0 or later) and/or in Portable Document
Format (PDF version 4.0 or later), unless otherwise agreed by the Director and
shall be submitted at the same time as the hard copies.
¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æªº©Ò¦³¤å¥ó¡A¶·¿Ë¨°e¥æ©Î¥H±¾¸¹¤è¦¡¶l±H¦ÜÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B (²{§}¬°¡G»´äÆW¥J°a¥§¸Ö¹D130¸¹×¹y¤¤¤ß27¼Ó)¡C©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Zªº¹q¤lª©¥»¡A§¡¶·¥H¶W¤å¥»¼Ð¥Ü»y¨¥ (HTML) (²Ä4.0©Î¸û«áª©¥») ¤Î/©Î«KÄ⦡¤å¥ó®æ¦¡ (PDF) (²Ä4.0©Î¸û«áª©¥») »s§@¡A°£«D¥tÀò¸pªø¦P·N¡A¨Ã¶·»Pµw½Æ¥»¦P®É´£¥æ¡C
1.12
The Permit Holder shall notify the Director in
writing the commencement date of construction of the Project no later than one month
prior to the commencement of construction of the Project. The Permit Holder
shall notify the Director in writing immediately if there is any change of the
commencement date of the construction.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¥H®Ñ±¤è¦¡§â«Ø³y¤uµ{ªº¬I¤u¤é´Á³qª¾¸pªø¡C¬I¤u¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
1.13
For the purpose of this Permit, ¡§commencement of
construction¡¨ does not include works related to site clearance and preparation
or other works as agreed by the Director.
¬°°õ¦æ¥»³\¥iÃÒ¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
1.14
The Permit Holder shall notify the Director in
writing the commencement date of operation of the Project no later than one month
prior to the commencement of operation of the Project. The Permit Holder shall
notify the Director in writing immediately if there is any change of the
commencement date of the operation.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥ØªºÀç¿ì®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¥H®Ñ±¤è¦¡§âÀç¿ì®i¶}¤é´Á³qª¾¸pªø¡CÀç¿ì®i¶}¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
2
Specific
Conditions
¯S©w±ø¥ó
Submissions or Measures
to be implemented before Construction of the Project
¤uµ{¶µ¥Ø«Ø³y¤uµ{®i¶}«e¶·´£¥æªº¤å¥ó©Î±Ä¨úªº±¹¬I
Employment of
Environmental Monitoring and Audit (EM&A) Personnel
¸u¥ÎÀô¹ÒºÊ¹î¤Î¼f®Ö¡]ÀôºÊ¡^¤Hû
2.1
An
Environmental Team (ET) shall be established by the Permit Holder no later than
one month before the commencement of construction of the Project. The ET shall
not be in any way an associated body of the Contractor or the Independent
Environmental Checker (IEC) for the Project. The ET shall be headed by an ET
Leader. The ET Leader shall be a person who has at least 7 years of experience
in environmental monitoring and auditing (EM&A) or environmental
management. The ET and the ET Leader shall be responsible for the
implementation of the EM&A programme in accordance with the EM&A
requirements as contained in the EM&A Manual of the Project. The ET Leader
shall keep a contemporaneous log-book of each and every instance or
circumstance or change of circumstances, which may affect the compliance with
the recommendations of the approved EIA Report and this Permit. The ET Leader
shall notify the IEC within one working day of the occurrence of any such
instance or circumstance or change of circumstances. The ET Leader¡¦s log-book
shall be kept readily available for inspection by all persons assisting in
supervision of the implementation of the recommendations of the approved EIA
Report and this Permit or by the Director or his authorized officers. Failure
to maintain records in the log-book, failure to discharge the duties of the ET
Leader as defined in the EM&A Manual of the Project or failure to comply
with this Condition would entitle the Director to require the Permit Holder by
notice in writing to replace the ET Leader. Failure by the Permit Holder to
make replacement, or further failure to keep contemporaneous records in the
log-book despite the employment of a new ET Leader may render this Permit
liable to suspension, cancellation or variation.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦1Ӥ릨¥ß¤@ÓÀô¹Ò¤p²Õ¡CÀô¹Ò¤p²Õ¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©Î¿W¥ßÀô¹Ò¬d®Ö¤H¦³¥ô¦óÁpô¡CÀô¹Ò¤p²Õ¶·¥Ñ¤@¦WÀô¹Ò¤p²Õ²Õªø±a»â¡CÀô¹Ò¤p²Õ²Õªø¶·¦bÀô¹ÒºÊ¹î¤Î¼f®Ö (¡uÀôºÊ¡v) ©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡CÀô¹Ò¤p²Õ¤ÎÀô¹Ò¤p²Õ²Õªø¶·«ö¤uµ{¶µ¥ØªºÀôºÊ¤â¥U¤º¸üªºÀôºÊ³W©w¡A°õ¦æÀôºÊp¹º¡CÀô¹Ò¤p²Õ²Õªø¶·«O¦s¤@¥»°O¿ý¥U¡A¦P®É°O¸ü¥i¯à·|¼vÅTÀò§å㪺Àôµû³ø§iªº«Øij¤Î¥»³\¥iÃÒªº²Å¦X±¡ªpªº¨C©v¨Æ¥ó¡B¨CºØ±¡ªp©Î¨C¦¸±¡ªpÅܤơCÀô¹Ò¤p²Õ²Õªø¶·¦bµo¥Í¥ô¦óÃþ¦ü¨Æ¥ó¡B±¡ªp©Î±¡ªpÅܤƫá1Ó¤u§@¤Ñ¤º³qª¾¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦s©ñÀô¹Ò¤p²Õ²Õªøªº°O¿ý¥Uªº¦a¤è¡A¶·¥i¨Ñ¨ó§U·þ¾É°õ¦æÀò§å㪺Àôµû³ø§iªº«Øij¤Î¥»³\¥iÃÒªº©Ò¦³¤H¤h¡B¸pªø©ÎÀò±ÂÅv¤HûÀH®É¬d¾\¡CÀô¹Ò¤p²Õ²Õªø¦p¥¼¯à¦b°O¿ý¥U«O¦s°O¿ý¡B¥¼¯à°õ¦æÀôºÊ¤â¥U©Ò¦C©úªºÀô¹Ò¤p²Õ²Õªø¾°È©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¦³Åv¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«Àô¹Ò¤p²Õ²Õªø¡C³\¥iÃÒ«ù¦³¤H¦p¥¼¯à¦w±Æ¤H¿ï´À¸É¡A©Î¦b¸u¥Î·sÀô¹Ò¤p²Õ²Õªø«á¤´¥¼¯à¦b°O¿ý¥U«O¦s¦P´Áªº°O¿ý¡A©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C
2.2
An IEC
shall be employed by the Permit Holder no later than one month before
commencement of construction of the Project. The IEC shall not be in any way an
associated body of the Contractor or the ET for the Project. The IEC shall be a
person who has at least 7 years of experience in EM&A or environmental
management. The IEC shall be responsible for duties defined in the EM&A
Manual and shall audit the overall EM&A performance, including the implementation
of all environmental mitigation measures, submissions required in the EM&A
Manual, and any other submissions required under this Permit. In addition, the
IEC shall be responsible for verifying the environmental acceptability of
permanent and temporary works, relevant design plans and submissions under this
Permit. The IEC shall verify the log-book(s) mentioned in Condition 2.1 of this
Permit. The IEC shall notify the Director by fax, within one working day of
receipt of notification from the ET Leader of each and every occurrence, change
of circumstances or non-compliance with the approved EIA Report and this
Permit, which might affect the monitoring or control of adverse environmental
impacts from the Project. In the case where the IEC fails to so notify the
Director of the same, fails to discharge the duties of the IEC as defined in
the EM&A Manual or fails to comply with this Condition, the Director may
require the Permit Holder by notice in writing to replace the IEC. Failure to
replace the IEC as directed or further failure to so notify the Director
despite employment of a new IEC may render this Permit liable to suspension,
cancellation or variation. Notification by the Permit Holder is the same as
notification by the IEC for the purpose of this Condition.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦1Ó¤ë¸u¥Î¤@¦W¿W¥ßÀô¹Ò¬d®Ö¤H¡C¿W¥ßÀô¹Ò¬d®Ö¤H¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©ÎÀô¹Ò¤p²Õ¦³¥ô¦óÁpô¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦bÀôºÊ©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·°õ¦æÀôºÊ¤â¥U©Ò¦C©úªºÂ¾°È¡A¥H¤Î¼f®Ö¾ãÅéÀôºÊ¤u§@ªºªí²{¡A¥]¬A¹ê¬I©Ò¦³Àô¹Ò½w¸Ñ±¹¬I¡B´£¥æÀôºÊ¤â¥U³W©wªº¤å¥ó¡A¥H¤Î´£¥æ¥»³\¥iÃÒ©Òn¨Dªº¨ä¥L¤å¥ó¡C¦¹¥~¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·®Ö¹ê¥Ã¤[¤ÎÁ{®É¤uµ{¦bÀô¹Ò¤Wªº¥i±µ¨üµ{«×¡B¬ÛÃöªº³]p¹Ï«h©M®Ú¾Ú¥»³\¥iÃÒ´£¥æªº¤å¥ó¡A¨Ã¶·®Ö¹ê¥»³\¥iÃÒ±ø¥ó²Ä2.1¶µ©Òzªº°O¿ý¥U¡C¦b¨C¦¸¥X²{¨Æ¬G¡B±¡ªpÅܤƩΤ£²Å¦XÀò§å㪺Àôµû³ø§i¤Î¥»³\¥iÃÒªº±¡ªp¡A¦Ó¥i¯à·|§«Ãª¤uµ{¶µ¥Ø©Ò³y¦¨¤£¨}Àô¹Ò¼vÅTªººÊ¹î©Î±±¨î¤u§@®É¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦b±µÀòÀô¹Ò¤p²Õ²Õªø³qª¾«á1Ó¤u§@¤Ñ¤º¥H¶Ç¯u¤è¦¡³qª¾¸pªø¡C¿W¥ßÀô¹Ò¬d®Ö¤H¦p¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡B¥¼¯à°õ¦æÀôºÊ¤â¥U©Ò¦C©úªº¿W¥ßÀô¹Ò¬d®Ö¤H¾°È©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¥i¥H®Ñ±n¨D³\¥iÃÒ«ù¦³¤HºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦p¥¼¯à«ö«ü¥ÜºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡A©Î¦b¸u¥Î·s¿W¥ßÀô¹Ò¬d®Ö¤H«á¤´¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡A«h©Î·|¾ÉP³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C¬°°õ¦æ¥»±ø¥ó¡A³\¥iÃÒ«ù¦³¤Hªº³qª¾µ¥¦P¿W¥ßÀô¹Ò¬d®Ö¤Hªº³qª¾¡C
Management
Organization of Main Construction Companies
¥Dn«Ø³y¤½¥qªººÞ²z¬[ºc
2.3
The
Permit Holder shall, no later than one month before the commencement of
construction of the Project covered by this Permit, inform the Director in
writing the management organization of the main construction companies and/or
any form of joint ventures associated with the construction of the Project. The
submitted information shall include at least an organization chart, names of
responsible persons and their contact details.
³\¥iÃÒ«ù¦³¤H¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¶·¦Ü¤Ö´£¦1Ó¤ë§â¥Dn«Ø³y¤½¥q¤Î ¡þ ©Î¥H¥ô¦ó§Î¦¡»P«Ø³y¤uµ{¬ÛÃöªº¦XÀç¥ø·~ªººÞ²z¬[ºc¡A¥H®Ñ±³qª¾¸pªø¡C´£¥æªº¸ê®Æ¶·¦Ü¤Ö¥]¬A¤@¥÷²Õ´¹Ï¡Bt³d¤Hªº©m¦W¤ÎÁpµ¸¸ê®Æ¡C
Pedestrian
Walkway Reserve in the Direct Link to MTR LMC Station
³s±µ´äÅK¸¨°¨¬w¯¸ªºª½±µ³q¹Dªº¦æ¤H¹D¹w¯d¦a
2.4
The Permit
Holder shall incorporate in the detailed design a pedestrian walkway reserve in
the Direct Link between the MTR LMC Station and the LMC Loop. The design provision is required for
planning purpose in the event that there are changes in the existing security
restriction allowing possible pedestrian access between the LMC Station and the
LMC Loop in future in order to reduce road traffic and also the associated
environmental impacts. Three hard copies and two electronic copies of the
detailed design plan and explanatory statement for the Direct Link with the
pedestrian walkway reserve shall be, at least one month before the commencement
of construction of the Direct Link, deposited with the Director. When the security
restriction is changed allowing pedestrian access between the LMC Station and
the LMC Loop in future, the pedestrian walkway reserve shall form part of the
Direct Link and shall be implemented in accordance with the finalised detailed
design plan.
³\¥iÃÒ«ù¦³¤H¶·§â¦æ¤H¹D¹w¯d¦a¯Ç¤J³s±µ´äÅK¸¨°¨¬w¯¸»P¸¨°¨¬wªe®M¦a°Ïª½±µ³q¹Dªº¸Ô²Ó³]p¤º¡C¬°¶i¦æ³W¹º¡A¦³»Ýnq¥ß¦³Ãöªº³]p³W©w¡A¥H«K¦p²{¦³ªº«O¦w¨î¦³©Ò§ïÅÜ¡A®e³\¦æ¤H¤é«á¶i¥X¸¨°¨¬w¯¸»P¸¨°¨¬wªe®M¦a°Ï¤§¶¡¡A¥i§@¥X¦w±Æ¡A±q¦Ó´î¤Ö¹D¸ô¥æ³q¤Î¬ÛÃöªºÀô¹Ò¼vÅT¡C³\¥iÃÒ«ù¦³¤H¶·¦bª½±µ³q¹Dªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñª½±µ³q¹D³s¦æ¤H¹D¹w¯d¦aªº¸Ô²Ó³]p¹Ï«h©M»¡©úªº3¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¤é«á·í«O¦w¨î¦³ÅÜ¡A®e³\¦æ¤H¨Ó©¹¸¨°¨¬w¯¸»P¸¨°¨¬wªe®M¦a°Ï¡A¸Ó¦æ¤H¹D¹w¯d¦a¶·ºc¦¨ª½±µ³q¹Dªº¤@³¡¤À¡A¨Ã¶·«ö·Ó³Ì²×ª©¥»ªº¸Ô²Ó³]p¹Ï«h¹ê¬I¡C
Submission of Works
Schedule and Location Plans
´£¥æ¬I¤u®É¶¡ªí¤Î¦ì¸m¹Ï
2.5
The
Permit Holder shall deposit a detailed works schedule of the Project with the
Director at least one month before the commencement of the works of the
Project. The schedule shall include an updated works programme indicating
dates of commencement of construction activities. This schedule to be submitted shall
govern the various milestones and anticipated schedule of submissions as reflected
in the Conditions of this Permit, such as Conditions 2.3 to 2.8, 2.11, 2.15,
2.18, 3.3, 3.4 and 4.2 of this Permit.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñ¤uµ{¶µ¥Øªº¸Ô²Ó¬I¤u®É¶¡ªí¡C®É¶¡ªí¶·¥]¬A³Ì·sªº¤uµ{p¹º¡AÅã¥Ü¦U¶µ«Ø³y¬¡°Êªº¶}©l¬I¤u¤é´Á¡C¦¹¥÷´£¥æªº®É¶¡ªí¶·²ÎÁÒ¦U¶µ¤u§@¨½µ{¤Î«ö¥»³\¥iÃÒ±ø¥ó¡]¦p±ø¥ó²Ä2.3¦Ü2.8, 2.11, 2.15, 2.18, 3.3, 3.4¤Î4.2¶µ¡^©Ò¥Ü¹wp´£¥æ¦U¶µ¤å¥óªº¤é´Á¡C
2.6
The
Permit Holder shall deposit with the Director location and layout plans of the
Project in the scale of 1:1,000 or other appropriate scale at least two weeks
before the commencement of the works of the Project. The plans shall be
submitted with an explanatory statement detailing the works boundaries, the
works areas, vertical and horizontal alignments of the proposed roads, and any
other major facilities; and the locations of key environmental mitigation
measures, including Ecological Area, temporary and permanent, on-site and
off-site ecologically compensatory wetland areas and noise barriers in various
stages of the Project, such as those mentioned in Conditions 2.9 and 2.22 of
this Permit.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦2Ó¬P´Á¦V¸pªø¦s©ñ¥H1¡G1,000©Î¨ä¥L¦X¾A¤ñ¨Òø»sªº¦ì¸m¹Ï¤Î³]p¹Ï«h¡C´£¥æªº¹Ï«h¶·ªþ¦³»¡©ú¡A¸Ôz¤uµ{ªº¬É½u¡B¤uµ{½d³ò¡BÀÀ«Ø¹D¸ôªº««ª½¤Î¾î¦V¸ô½u¡B¨ä¥L¥Dn³]¬I¡A¥H¤Î¦U¶µ¥DnÀô¹Ò½w¸Ñ±¹¬Iªº¹ê¬I¦aÂI¡A¦³Ãö±¹¬I¥]¬A¥ÍºA°Ï¡B¤u¦a¤º¥~ªºÁ{®É¤Î¥Ã¤[¥ÍºA¸ÉÀvÀã¦a°Ï¡A¥H¤Î¤uµ{¶µ¥Ø¤£¦P¶¥¬qªº¹jµ«Ì¡A¦p¥»³\¥iÃÒ±ø¥ó²Ä2.9¤Î2.22¶µ©Òzªº±¹¬I¡C
Submission and Measures
to Mitigate Ecological Impact
¬°½w¸Ñ¥ÍºA¼vÅT¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.7
To reduce the ecological impact during construction and operation stages of the
Project, a series of ecological mitigation measures shall be implemented as conforming to the relevant information
and recommendations, including those described in Section 12.7 (Ecological Mitigation
Measures), contained in the EIA Report. The key ecological mitigation measures shall include:
¬°´î¤Ö¤uµ{¶µ¥Ø¦b«Ø³y¤ÎÀç¿ì¶¥¬q¹ï¥ÍºA³y¦¨ªº¼vÅT¡A³\¥iÃÒ«ù¦³¤H¶·¹ê¬I¤@¨t¦Cªº¥ÍºA½w¸Ñ±¹¬I¡A¥H²Å¦X¬ÛÃö¸ê®Æ©M«Øij¡A¥]¬AÀôµû³ø§i²Ä12.7¸`¡]¥ÍºA¼vÅT½w¸Ñ±¹¬I¡^©Òzªº¸ê®Æ¤Î«Øij¡C¥Dn¥ÍºA½w¸Ñ±¹¬I¶·¥]¬A¥H¤U¦U¶µ¡G
(a)
conducting pre-construction search for any otter
holts/dens and herpetofaunal species of conservation concern in construction
sites, with remedial measures such as setting of no works area around otter
holts/ den and translocation of important species identified, if any;
¬I¤u«e¦b«Ø¿v¦a½L·j´M¬O§_¦³¥ô¦ó¨ã¦³«O¨|»ùȪº¤ôá±_¥Þ¡þ ºÛ¤Îª¦¦æ°Êª««~ºØ¡A¨Ã¶·±Ä¨ú¸É±Ï±¹¬I¡A¦p±N¤ôá±_¥Þ¡þ ºÛ¥|©P©w¬°¸T¤î¬I¤u°Ï¡A¥H¤Î¾E²¾§ä¨ìªº«n«~ºØ¡]¦p¦³ªº¸Ü¡^¡F
(b)
creating and establishing an Ecological Area, approximately
±NĪ¸«ªh¿A¦b¸¨°¨¬wªe®M¦a°Ï¥þ³¡²¾°£«e¡A¼W³]¤@Ó±¿n¬ù12.78¤½³¼ªº¥ÍºA°Ï¡A¤º¦³Äª¸«ªh¿A©Mªh¿A´Ï®§¦a¡A¨Ã¶·±q¥ÍºA°ÏÃä¬É°_p³]¸m¤@¹D50¦Ì¼e¡AºØ¦³¦X¾A«Ì»Ù´Óª«ªº§C¸G«Ø¿v½w½Ä°Ï¡F
(c)
stabilising the bank of the old Shenzhen River
meander of the LMC Loop, approximately
¾d©T¸¨°¨¬wªe®M¦a°Ïªº²`¦`ªeªe¦±(ªø¬ù3.5¤½¨½)ªºªe©¤¡A¥]¬A¦b¤uµ{§¹¦¨«á«·s®âºØ´Óª«¨Ã±Ä¥Î¦h¶µ¥ÍºA³]p¡A¦p¬ã¨s¦b¸g¾d©T«áªºªe©¤³]¸m¤ôá±_¥Þ¤Î¬°¤ôá´£¨Ñ³V¹¤Î±Æ«K¦aÂIªº¥i¦æ©Ê¡F
(d)
creating a
¦b¸¨°¨¬wªe®M¦a°ÏÃä¬Éªuªe¦±¦è«n¤ÎªF¥_³¡¤À³]¥ß¤@¹D³Ì¤Ö¦³23¦Ì寛ªº´Ó³Q«á²¾°Ï¡F
(e)
installing
¦b«Ø¿v¦a½L¥|©P¦w¸Ë3¦Ì°ªªº¾ñÆVºñ¦â³òÄæ¡A¥H«K«ö»Ýn®e³\©Îªý¤î°Êª«³q¹L¡F
(f)
providing (i) permanent compensatory off-site
wetland areas; and (ii) construction stage temporary compensatory off-site
wetland areas during various construction stages of the Project, in advance of
any corresponding wetland loss;
¦b·l¥¢¥ô¦ó¬ÛÃöªºÀã¦a«e¡A¶·´£¨Ñ(i) ¥Ã¤[¸ÉÀv©Ê¤u¦a¥~Àã¦a¡A¥H¤Î(ii) ¦b¤uµ{¶µ¥Ø¤£¦P«Ø³y¶¥¬q´£¨ÑÁ{®É¸ÉÀv©Ê¤u¦a¥~Àã¦a¡F
(g)
providing at least
¦b¤û¨¤¤sªþªñºØ´Ó¾ð¤ì¤ÎÄé¤ì¡A¥H´£¨Ñ¦û¦a³Ì¤Ö0.4¤½³¼ªºªL¦a¸ÉÀv°Ï¡A¥H¸ÉÀv¦]¦è±³s±µ¸ô¤Î¤uµ{¶µ¥Ø¨ä¥L¤uµ{¦Ó¤ÞPªºªL¤ì·l¥¢¡F
(h)
carrying out outside dry-season (from November
to February next year), the construction works associated with the site
formation in the Ecological Area, stabilization of the bank of the old Shenzhen
River meander, Western Connection Road along Ha Wan Tsuen Road, to minimise
disturbances to migratory birds/water birds;
¦b§ò©u(¥Ñ¤Q¤@¤ë¦Ü¤U¦~¤G¤ë)¥H¥~®É¶¡¶i¦æ»P¥ÍºA°Ï¦a½L¥¾ã¤uµ{¡B²`¦`ªeªe¦±ªºªe©¤¾d©T¤uµ{¤Îªu¤UÆW§ø¸ôªº¦è±³s±µ¸ô¬ÛÃöªº«Ø³y¤uµ{¡A¥HºÉ¶q´î¤Ö¹ïÔ³¾¡þ¤ô¸Vªº´þÂZ¡F
(i)
using powered mechanical equipment for
construction works only during the period 9am to 5pm at and near the old
Shenzhen River meander and other identified important ecologically sensitive
areas, if any;
¦pn¦b²`¦`ªeªe¦±¤Î¨ä¥L½T©w¬°¥ÍºA©ö¨ü¯}Ãaªº«n¦a°Ï¡]¦p¦³ªº¸Ü¡^©Î¨äªþªñ¦a¤è¨Ï¥Î¾÷°Ê³]³Æ¬I¤u¡A®É¶¡¶È©ó¤W¤È9®É¦Ü¤U¤È5®É¡F
(j)
prohibiting use of direct lighting on the old
Shenzhen River meander and controlling night-time
lighting to reduce potential ecological impact;
¬°´î¤Ö¼ç¦b¥ÍºA¼vÅT¡A¸T¤î¦b¨Ï¥Î·Ó©úª½±µ«ü¦V²`¦`ªeªe¦±¡A¨ÃºÞ¨î©]¶¡·Ó©ú¡F
(k)
implementing measures to minimise magnitude of
construction runoff and to avoid/minimise the potential impact of spillage
events, if any; and
±Ä¨ú±¹¬IºÉ¶q´î¤Ö¬I¤u®|¬y¬y¶q¤ÎÁקK¡þºÉ¶q´î¤Ö·¸¥X¨Æ¥óªº¼ç¦b¼vÅT¡]¦p¦³ªº¸Ü¡^¡F¥H¤Î
(l)
using opaque noise barriers along the proposed
roads and using appropriate glass and façade treatment for buildings in the LMC
Loop to minimise the mortality of fast-moving wildlife (e.g. birds).
ªuÀÀ«Ø¹D¸ô¶·¨Ï¥Î¤£³z©ú¹jµ«Ì¡A¨Ã¬°¸¨°¨¬wªe®M¦a°Ï¤º«Ø¿vª«ªº¨Ï¥Î¦X¾A¬Á¼þ¤Î¥~Àð³B²z¡A¥HºÉ¶q´î§C§Ö³t²¾°Êªº³¥¥Í°Êª«¡]¨Ò¦p:³¾Ãþ¡^ªº¦º¤`²v¡C
Four hard copies and two electronic copies of
an Ecological
Mitigation / Habitat Creation and Management Plan shall be, at least one month before the commencement
of corresponding parts of the works of the Project, deposited with the
Director. The Plan(s) shall show
the design details, locations, implementation programme, maintenance and
management schedules, and drawings in the scale of 1:1,000 or other appropriate
scale of the ecological mitigation measures of the Project. Before submission
to the Director, the Plan(s) shall be certified by the ET Leader and verified
by the IEC as conforming to the relevant information and recommendations
contained in the EIA Report. All measures recommended in the finalised
submission(s) under this Condition shall be fully and properly implemented.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¬ÛÃö³¡¤À®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñ¥ÍºA½w¸Ñ/´Ï®§¦a³Ð³y¤ÎºÞ²zp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡Cp¹º¶·Åã¥Ü³]p¸Ô±¡¡B¦aÂI¡B¹ê¬Ip¹º¡B«O¾i¤ÎºÞ²z®É¶¡ªí¡A¥H¤Î¥H1:1,000©Î¨ä¥L¦X¾A¤ñ¨Òø»s¡A®i¥Ü¤uµ{¶µ¥Ø¥ÍºA½w¸Ñ±¹¬Iªº¹Ï«h¡C¦³Ãöp¹º¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§iªº¬ÛÃö¸ê®Æ¤Î«Øij¡C«ö¥»±ø¥ó´£¥æªº¤å¥ó©w½Z©Ò«Øijªº¦U¶µ±¹¬I§¡¶·¹ý©³¨Ã§´µ½°õ¦æ¡C
Submission and Measures
to Mitigate Landscape and Visual Impact
¬°½w¸Ñ´ºÆ[¤Îµøı¼vÅT¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.8
To reduce the landscape and visual impact during construction and operation stages of the
Project, a series of landscape and visual mitigation measures shall be implemented as conforming to the relevant information
and recommendations, including those described in Sections
¬°´î¤Ö¤uµ{¶µ¥Ø¦b«Ø³y¤ÎÀç¿ì¶¥¬q²£¥Íªº´ºÆ[¤Îµøı¼vÅT¡A³\¥iÃÒ«ù¦³¤H¶·¹ê¬I¤@¨t¦Cªº´ºÆ[¤Îµøı¼vÅT½w¸Ñ±¹¬I¡A¥H²Å¦X¬ÛÃö¸ê®Æ©M«Øij¡A¥]¬AÀôµû³ø§i²Ä
Submissions or Measures
to be implemented for Construction of the Project
¬°¤uµ{¶µ¥Ø«Ø³y¤uµ{¶·´£¥æªº¤å¥ó©Î±Ä¨úªº±¹¬I
Measures to
Mitigate Construction Stage Noise Impact
½w¸Ñ«Ø³y¶¥¬q¾¸µ¼vÅTªº±¹¬I
2.9
To
mitigate construction stage noise impact, the following noise mitigation
measures shall be implemented during the construction stage of the Project:
¬°½w¸Ñ«Ø³y¶¥¬qªº¾¸µ¼vÅT¡A³\¥iÃÒ«ù¦³¤H¶·©ó¤uµ{¶µ¥Ø«Ø³y¶¥¬q¹ê¬I¤Uz¾¸µ½w¸Ñ±¹¬I¡G
(a)
temporary noise barriers shall be installed
along the construction access roads to screen the construction traffic noise
and noisy construction activities and equipments during different construction
stages of the Project as described in Table 1 and Figures 2a, 2b, 3a and 3b of this
Permit;
¦p¥»³\¥iÃÒªí1¤Î¹Ï2a¡B2b¡B3a¤Î3b©Òz¡Aªu«Ø¿v³q¸ô¦w¸ËÁ{®É¹jµ«Ì¡A¥H«Ì½ª¤uµ{¶µ¥Ø¦b¤£¦P«Ø³y¶¥¬q©Ò²£¥Íªº«Ø¿v¥æ³q¾¸µ¤Î¹Ë§nªº«Ø¿v¬¡°Ê¤Î³]³Æ¡F
(b)
use of movable noise barriers, noise enclosures
and quiet powered mechanical equipment for the noisy construction activities
and equipments as described in Table 1 and with reference to the typical
designs as shown in Figure 4 of this Permit;
¦b¶i¦æ¹Ë§nªº«Ø¿v¬¡°Ê¤Î¨Ï¥Î¹Ë§n³]³Æ®É¡A¶·¨Ï¥Î¦pªí1©Òzªº¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡A¨Ã°Ñ¦Ò¥»³\¥iÃÒ¹Ï4©Ò¥Üªº¤@¯ë³]p¡F
(c)
concrete lorry mixer(s) shall be operated at
least
¦p¥»³\¥iÃÒ¹Ï2b¤Î3b©Ò¥Ü¤Îªí1©Òz¡A²V¾®¤gÅÍ©Õ¨®¶·¦b¶ZÂ÷¦è±³s±µ¸ô¾¸µ·PÀ³±jªº¦a¤è½s¸¹: HWTR-6¤ÎHWTR-11³Ì¤Ö25¦Ìªº¦a¤è¾Þ§@¡A¥H§K¦]²Ö¿n«Ø¿v¾¸µ¤ÞP¶W¼Ðªº±¡ªp¡F¥H¤Î
(d)
no percussive piling nor blasting by explosive
shall be implemented in the Project.
¤uµ{¶µ¥Ø¤£±o¶i¦æ¼²À»¦¡¥´¼Î©Î¥HÃz¬µ«~¶i¦æÃz¯}¡C
Submission and Measures to Mitigate Construction Stage Fisheries Impact
and to Handle Spillage of Chemicals or Contaminated Soil
¬°½w¸Ñ¬I¤u¶¥¬qº®·~¼vÅT¤Î³B²z·¸¥X¤Æ¾Ç«~©Î¨ü¦Ã¬V¤gÄ[¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.10
For some
fish ponds which will be partly affected by construction works, to mitigate
construction stage fisheries impacts, a layer of sheet pile/barrier wall shall
be erected to separate the works area from the remaining areas of the affected fish
ponds before the commencement of other construction works, e.g. excavation or filling
within the works area. The sheet pile/barrier wall shall be constructed by non-percussive
piling method (e.g. Press-in method) to reduce the fisheries impact. In
addition, the sheet pile/barrier wall shall have impermeable lining to minimise
water loss from the fish pond to the works area.
´N¤@¨Ç·|§½³¡¨ü«Ø¿v¤uµ{¼vÅTªº³½¶í¦Ó¨¥¡A¬°½w¸Ñ¬I¤u¶¥¬qªºº®·~¼vÅT¡A¶·¦b¨ä¥L«Ø¿v¤uµ{¡]¨Ò¦p¦b¤u¦a«õ±¸©Î¶ñ¤g¤uµ{¡^®i¶}«e¡A¦bº®¶í¤¤³]¸m¤@¼hªO¼Î¡þ³òÀð¡A¥H§â¤u¦a»P¨ü¼vÅT³½¶íªº¨ä¾l½d³ò¤À¹j¶}¨Ó¡CªO¼Î¡þ³òÀ𶷥ΫD¼²À»¦¡¥´¼Î¤èªk¡]¨Ò¦pÀ£¤Jªk¡^«Ø³y¡A¥H´î§C¹ïº®·~³y¦¨ªº¼vÅT¡C¦¹¥~¡AªO¼Î¡þ³òÀ𶷦³¤£³z¤ô¹Ô¼h¥HºÉ¶q´î¤Ö³½¶íªº¤ô¤À¬y¥¢¦Ü¤u¦a¡C
2.11
Due to
the presence of many fish ponds at/near the Project area and access roads, in
order to handle the potential spillage of chemicals or contaminated soil, if
any, affecting the fish ponds, four hard copies and two electronic copies of an
Emergency Contingency Plan shall be, at least one month before the commencement
of the concerned works of the Project, deposited with the Director. The Plan shall include the following:
¥Ñ©ó¦b¤uµ{¶µ¥Ø½d³ò¤Î³q¸ô¡þ¨äªþªñ¦³³\¦h³½¶í¡A¬°³B²z¤Æ¾Ç«~©Î¨ü¦Ã¬V¤gÄ[¡]¦p¦³¡^¥i¯à·¸¥X¦Ü³½¶íªº±¡ªp¡A³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¬ÛÃö¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñºò«æÀ³ÅÜp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¦³Ãöp¹º¶·¥]¬A¥H¤U¦U¶µ¡G
(a)
Potential
emergency situations;
¥i¯à¥X²{ªººò«æ±¡ªp¡F
(b)
Chemicals
or hazardous materials used on-site (and their location);
¦b¤u¦a¤º¨Ï¥Îªº¤Æ¾Ç«~©Î¦MÀIª«®Æ¡]¤Î¨ä¦ì¸m¡^¡F
(c)
Emergency
response team;
ºò«æÀ³Åܶ¤¥î¡F
(d)
Emergency
response procedures;
ºò«æÀ³Åܵ{§Ç¡F
(e)
List
of emergency telephone hotlines;
ºò«æ¼ö½u¹q¸Ü¤@Äýªí¡F
(f)
Locations
and types of emergency response equipment; and
ºò«æÀ³Åܳ]³Æªº¦ì¸m¤ÎºØÃþ¡F¥H¤Î
(g)
Training
plan and testing for effectiveness.
°V½mp¹º¤Î¦³®Ä©Êªº´ú¸Õ¡C
Before
submission to the Director, the Plan shall be certified by the ET Leader and
verified by the IEC as conforming to the relevant information and
recommendations contained in the EIA Report. All measures recommended in the
finalised submission under this Condition shall be fully and properly
implemented.
¸Óp¹º¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i©Ò¸üªº¬ÛÃö¸ê®Æ¤Î«Øij¡C®Ú¾Ú¥»±ø¥ó´£¥æªº¤å¥ó©w½Z«Øijªº©Ò¦³±¹¬I¡A§¡¶·¤©¥H¹ý©³¤Î§´µ½°õ¦æ¡C
Measures to
Mitigate Construction Stage Water Quality Impact
½w¸Ñ¬I¤u¶¥¬q¤ô½è¼vÅTªº±¹¬I
2.12
To reduce sediment transport arising from the
stabilisation works at the bank of the old Shenzhen River meander of the LMC
Loop, cofferdam/diaphragm wall and/or silt
curtain system shall be deployed to surround the works area, from water surface
down to the bottom of the meander, in order to minimise the sediment loss to
the water body outside the works areas.
¬°´î¤Ö¦b¸¨°¨¬w²`¦`ªeªe¦±ªe©¤¶i¦æªº¾d©T¤uµ{¤Þ°_ªºªd¨F¬y¥¢¦Ü¤ôÅé¡A¶·³ò¶¤u¦a½d³ò±qªe¦±ªº¤ô±³]¸m³ò³÷¡þ¹jÀð¤Î¡þ©Î¹jªd¹õ¨t²Î¤U¦Ü©³³¡¡A¥HºÉ¶q´î¤Öªd¨F¬y¥¢¦Ü¤u¦a½d³ò¥~ªº¤ôÅé¡C
2.13
When
bioremediation works for odour remediation as mentioned in Condition 2.24 of
this Permit is conducted at the
·í¦b²`¦`ªe¶i¦æ¥»³\¥iÃÒ±ø¥ó²Ä2.24¶µ©Ò´£¤Î§@¬°½w¸Ñ¯ä¨ýªº¥Íª«°£¦Ã¤uµ{®É¡A¥u®e³\³Ì¦h¤@°¦¤u§@²î¦P®É¤u§@¡A¦Ó³Ì¤jª`¤J±¿n¡A¨C¤Ñ¤£±o¦h©ó10,000¥¤è¦Ì¡A¥H½w¸Ñ¤ô½è¼vÅT¡C
Measures to Minimise
the Disturbance to the Reedbed System of MTR LMC Spurline
¬°ºÉ¶q´î§C¤zÂZ´äÅK¸¨°¨¬w¤ä½uªºÄª¸«°Ï°ì©Ò±Ä¨úªº±¹¬I
2.14
For
the construction of the Direct Link, the existing reeds in the reedbed system
of the MTR LMC Spurline shall not be removed by the construction works of the Project,
except for the 2 areas with a total area of approximately
´N¿³«Øª½±µ³q¹D¦Ó¨¥¡A´äÅK¸¨°¨¬w¤ä½uĪ¸«°Ï°ìªº²{¦³Äª¸«ÂO¤£±o¦]¤uµ{¶µ¥Øªº«Ø³y¤uµ{¦Ó²¾°£¡A¥»³\¥iÃÒ¹Ï5©Ò¥Üªº3¸¹Äª¸«¶í¤ºÁ`±¿n¬ù¬°320¥¤è¦Ìªº¨âÓ½d³ò°£¥~¡CĪ¸«°Ï°ìªº¤uµ{§¹¤u«á¡A¶·×´_¨ü¼vÅTªºÄª¸«°Ï°ì¡C
Submissions and
Measures to Mitigate Land Contamination Implication
¬°½w¸Ñ¤g¦a¦Ã¬V¼vÅT¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.15
To address
any potential contamination activities due to land use changes, if any, in the works
area of the Project after the land contamination assessment study of the EIA Report
and before the commencement of construction of the Project, re-appraisal on (i)
the LMC Loop and (ii) the other contamination assessment area for the
associated infrastructure outside the Loop, shall be conducted. Four
hard copies and two electronic copies of a
re-appraisal report shall be, at least one month before the
commencement of corresponding parts of the works of the Project, deposited with
the Director. Before submission to the Director, the report shall be certified
by the ET Leader and verified by the IEC as conforming to the relevant information
and recommendations contained in the EIA Report. The report shall recommend any part(s) of
the works areas of the Project require re-assessment on land contamination,
e.g. due to land use changes with potential contamination activities.
¬°³B²z¦bÀôµû³ø§iªº¤g¦a¦Ã¬Vµû¦ô¬ã¨s§¹¦¨«á¤Î¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¦]¤g¦a¥Î³~§ïÅܦӥi¯à¦b¤uµ{¶µ¥Øªº¤u¦a½d³ò¥X²{¦Ã¬V¬¡°Ê¡]¦p¦³ªÌ¡^¡A¶·¹ï(i)¸¨°¨¬wªe®M¦a°Ï¤Î(ii)ªe®M¦a°Ï¥H¥~¬ÛÃö°ò«Ø³]¬Iªº¨ä¥L¦Ã¬Vµû¦ô½d³ò¶i¦æ«·sµû¦ô¡C¦b¤uµ{¶µ¥Øªº¬ÛÃö¤uµ{³¡¤À®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñ«·sµû¦ô³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¸Ó³ø§i¦b´£¥æ¸pªø¤§«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¤º¸üªº¬ÛÃö¸ê®Æ¤Î«Øij¡C¸Ó³ø§i¶·´N¶·n«·s¶i¦æ¤g¦a¦Ã¬Vµû¦ô¡]¨Ò¦p¦]¤g¦a¥Î³~§ïÅܦӥi¯à¥X²{¦Ã¬V¬¡°Ê¡^ªº¤uµ{¶µ¥Ø¥ô¦ó³¡¤Àªº¤u¦a½d³ò´£¥X«Øij¡C
2.16
If
re-assessment on land contamination is not required for the LMC Loop area as
recommended in the finalised re-appraisal report, all remedial measures
described in the ¡§Contamination Assessment Report & Remediation Action
Plan for LMC Loop and Supplementary Contamination Assessment Report &
Remediation Action Plan for LMC Loop¡¨ in Appendix 8-2 of the EIA Report
shall be fully and properly implemented. Four hard copies and two electronic
copies of Remediation Report (RR) shall be submitted, no later than one month
after the completion of the remediation works, to the Director for approval. The RR shall provide details on the
remediation works carried out, types and volume of contaminated soil, standards
and levels of treatment, and locations of all disposal sites (including record
of disposal). All properly treated contaminated soil shall be backfilled within
the LMC Loop. Except for land
remediation works, no construction works at the identified contaminated areas shall
be carried out prior to the approval of the said RR by the Director. All of the
submissions to the Director shall be certified by the ET Leader and verified by
the IEC as conforming to the information and recommendations contained in the
EIA Report.
¦pªG«ö«·sµû¦ô³ø§i©w½Z«Øij¡AµL¶·¹ï¸¨°¨¬wªe®M¦a°Ï«·s¶i¦æ¤g¦a¦Ã¬Vµû¦ô¡A«hÀôµû³ø§iªþ¿ý8-2¤¤ªº¡u¸¨°¨¬wªe®M¦a°Ï¦Ã¬Vµû¦ô³ø§i¤Î¸É±Ï¦æ°Êp¹º¤Î¸¨°¨¬wªe®M¦a°Ï¸É¥R¦Ã¬Vµû¦ô³ø§i¤Î¸É±Ï¦æ°Êp¹º¡v¶·¤©¥H¹ý©³¤Î§´µ½°õ¦æ¡C¦b¸É±Ï¤uµ{§¹¦¨«á1Ӥ뤺¡A³\¥iÃÒ«ù¦³¤H¶·¦V¸pªø´£¥æ¸É±Ï¤uµ{³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¥H¨Ñ¼f§å¡C¸É±Ï¤uµ{³ø§i¶·´£¨Ñ©Ò¶i¦æ¸É±Ï¤uµ{ªº¸Ô±¡¡B¨ü¦Ã¬V¤gÄ[ªºÃþ§O©M¼Æ¶q¡B³B²z¼Ð·Ç¤Î¤ô¥¡A¥H¤Î©Ò¦³³B¸m¦aÂIªº¦ì¸m¡]¥]¬A³B¸m°O¿ý¡^¡C©Ò¦³¸g¾A·í³B²zªº¨ü¦Ã¬V¤gÄ[¶·¦^¶ñ¦Ü¸¨°¨¬wªe®M¦a°Ï½d³ò¤º¡C°£¤g¦a¸É±Ï¤uµ{¥~¡AY¤Wz¸É±Ï¤uµ{³ø§i¥¼¸g¸pªø§åã¡A¤£±o¦b¤w½T©wªº¨ü¦Ã¬V½d³ò¶i¦æ«Ø³y¤uµ{¡C©Ò¦³´£¥æ¸pªøªº¤å¥ó¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¤º¸üªº¸ê®Æ¤Î«Øij¡C
2.17
If
re-assessment on land contamination is required for any part(s) of the Project
area as recommended in the finalised re-appraisal report, to ascertain the
extent and level of land contamination and formulate necessary remedial
measures,
Y«ö«·sµû¦ô³ø§i©w½Z«Øij¡A¶·n¹ï¤uµ{¶µ¥Ø½d³ò¥ô¦ó³¡¤À«·s¶i¦æ¤g¦a¦Ã¬Vµû¦ô¡A¬°½T©w¤g¦a¦Ã¬Vªºµ{«×¤Î¤ô¥¡A¨Ã¨î©w©Ò»Ýªº¸É±Ï±¹¬I¡A
(a)
Updated Contamination Assessment Plan (CAP) for
the concerned potentially contaminated area(s), shall be submitted to the
Director for approval and the relevant Supplementary Site Investigation (SI)
shall be carried out;
¶·´N¥i¯à¨ü¦Ã¬Vªº¦³Ãö½d³ò¦V¸pªø´£¥æ³Ì·sªº¦Ã¬Vµû¦ôp¹º¥H¨Ñ¼f§å¡A¨Ã¶·¶i¦æ¬ÛÃöªº¸É¥R¹ê¦a°É´ú¡F
(b)
no later than two months after the completion of
the Supplementary SI as mentioned in (a) above,
submit to the Director for approval four hard copies and two electronic copies
of Contamination Assessment Report (CAR) to document the findings of the
supplementary land contamination investigation works and assessment on the
nature and extent of land contamination;
¶·¦b¤W¤å(a)¶µ´£¤Îªº¸É¥R¹ê¦a°É´ú§¹¦¨«á2Ӥ뤺¡A¦V¸pªø´£¥æ¦Ã¬Vµû¦ô³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¸üz¸É¥R¤g¦a¦Ã¬V°É´ú¤uµ{ªºµ²ªG©M¦³Ãö¤g¦a¦Ã¬V©Ê½è¤Îµ{«×ªºµû¦ô¡F
(c)
if land contamination is confirmed, submit to
the Director for approval four hard copies and two electronic copies of
Remedial Action Plan (RAP) to formulate necessary remedial measures. All remedial measures described in the
approved RAP shall be fully and properly implemented; and
YÃҹ꦳¤g¦a¦Ã¬Vªº±¡ªp¡A¶·¦V¸pªø´£¥æ¸É±Ï¦æ°Êp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¥H¨Ñ¼f§å¡A¸Óp¹º¶·¨î©w©Ò»Ýªº¸É±Ï±¹¬I¡C¤w®Ö㪺¸É±Ï¦æ°Êp¹º©Ò¸üªº©Ò¦³¸É±Ï±¹¬I¥²¶·¤©¥H¹ý©³¤Î§´µ½°õ¦æ¡F¥H¤Î
(d)
if remediation is required, four hard copies and
two electronic copies of Remediation Report (RR) shall be submitted to the
Director for approval, no later than one month after the completion of the
remediation works. The RR shall
provide details on the remediation works carried out, types and volume of
contaminated soil, standards and levels of treatment, and locations of all
disposal sites (including record of disposal). All properly treated contaminated
soil shall be backfilled within the Project area. Except for land remediation
works, no construction works at the identified contaminated areas shall be
carried out prior to the approval of the said RR by the Director.
Y¶·¶i¦æ¸É±Ï¤uµ{¡A«h¶·¦b¸É±Ï¤uµ{§¹¦¨«á1Ӥ뤺¦V¸pªø´£¥æ¸É±Ï¤uµ{³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡A¥H¨Ñ¼f§å¡C¸É±Ï¤uµ{³ø§i¶·´£¨Ñ©Ò¶i¦æ¸É±Ï¤uµ{ªº¸Ô±¡¡B¨ü¦Ã¬V¤gÄ[ªºÃþ§O¤Î¼Æ¶q¡B³B²zªº¼Ð·Ç¤Î¤ô¥¡A¥H¤Î©Ò¦³³B¸m¦aÂIªº¦ì¸m¡]¥]¬A³B¸m°O¿ý¡^¡C©Ò¦³¸g¾A·í³B²zªº¨ü¦Ã¬V¤gÄ[¶·¦^¶ñ¦Ü¤uµ{¶µ¥Ø½d³ò¤º¡C°£¤g¦a¸É±Ï¤uµ{¥~¡AY¤Wz¸É±Ï¤uµ{³ø§i¥¼¸g¸pªø§åã¡A¤£±o¦b¤w½T©wªº¨ü¦Ã¬V½d³ò¶i¦æ«Ø³y¤uµ{¡C
Before submission to the Director, the CAR, RAP and RR shall
be certified by the ET Leader and verified by the IEC as conforming to the
information and recommendations contained in the EIA Report.
¦Ã¬Vµû¦ô³ø§i¡B¸É±Ï¦æ°Êp¹º¤Î¸É±Ï¤uµ{³ø§i¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¤º¸üªº¸ê®Æ¤Î«Øij¡C
Submissions or Measures to be implemented for Operation
of the Project
¤uµ{¶µ¥ØÀç¿ì¶¥¬q¶·´£¥æªº¤å¥ó©Î±Ä¿ìªº±¹¬I
Submission and Measures to Mitigate Operation
Stage Water Quality Impact
¬°½w¸ÑÀç¹B¶¥¬q¤ô½è¼vÅT¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.18
To reduce the storm water pollution impact during
operation stage of the Project, a series of water quality mitigation measures, including
installation of silt traps and oil interceptors, shall be implemented as conforming to the relevant information
and recommendations, including those described in Section 5.7 (Water Quality Mitigation
Measures), contained in the EIA Report in order to reduce the water quality
impact, particularly on the old Shenzhen River meander and natural stream
courses. Four hard copies and two
electronic copies of an Updated Storm Water
Pollution Control Plan for operation stage of the Project shall
be, at least one month before the commencement of operation of the Project,
deposited with the Director. The Plan
shall make reference to the Storm Water Pollution Control Plan as presented in
Appendix 5-1 of the EIA Report, and the updated information including the site
conditions, operation mode, project programme/progress, etc. The Plan shall include
the design details, locations, implementation programme, maintenance and
management schedules, and drawings in the scale of 1:1,000 or other appropriate
scale of the operation stage storm water pollution mitigation measures of the
Project. Before submission to the Director, the Plan shall be certified by the
ET Leader and verified by the IEC as conforming to the relevant information and
recommendations contained in the EIA Report. All measures recommended in the finalised
submission under this Condition shall be fully and properly implemented.
¬°´î§C¤uµ{¶µ¥ØÀç¹B¶¥¬qªº«B¤ô¦Ã¬V¼vÅT¡A¶·¹ê¬I¤@¨t¦C¤ô½è¼vÅT½w¸Ñ±¹¬I¡A¥]¬A¦w¸Ë¹j¨F¤«¤Î¶°ªo¾¹¡A¸Óµ¥±¹¬I¶·²Å¦XÀôµû³ø§i¤º¸üªº¬ÛÃö¸ê®Æ¤Î«Øij¡A¥]¬A²Ä5.7¸`¡]¤ô½è¼vÅT½w¸Ñ±¹¬I¡^©Ò»¡©úªÌ¡A¥H«K´î§C¹ï¤ô½èªº¼vÅT¡A¯S§O¬O¹ï²`¦`ªeªe¦±¤Î¤ÑµMªe¹Dªº¼vÅT¡C³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥ØªºÀç¿ì®i¶}«e¡A¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø¦s©ñ¤uµ{¶µ¥ØÀç¿ì¶¥¬q³Ì·s«B¤ô¦Ã¬VºÞ¨îp¹ºªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¸Óp¹º¶·°Ñ¦ÒÀôµû³ø§iªþ¿ý5-1©Ò§ezªº«B¤ô¦Ã¬VºÞ¨îp¹º¤Î§ó·s¸ê®Æ¡A¥]¬A¦a½Lª¬ªp¡B¹B§@¼Ò¦¡¡B¤uµ{p¹º¡þ¶i«×µ¥¡C¸Óp¹º¶·Åã¥Ü³]p¸Ô±¡¡B¦ì¸m¡B¹ê¬Ip¹º¡B«O¾i¤ÎºÞ²z®É¶¡ªí¡A¥H¤Î¥H1¡G1,000©Î¨ä¥L¦X¾A¤ñ¨Òø»sªº®i¥Ü¤uµ{¶µ¥ØÀç¹B¶¥¬q«B¤ô¦Ã¬V½w¸Ñ±¹¬Iªº¹Ï«h¡C¦³Ãö¹Ï«h¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôµû³ø§i¤º¸üªº¬ÛÃö¸ê®Æ¤Î«Øij¡C«ö¥»±ø¥ó´£¥æªº¤å¥ó©w½Z«Øijªº©Ò¦³±¹¬I¡A§¡¶·¤©¥H¹ý©³¤Î§´µ½°õ¦æ¡C
2.19
To minimize
the possibility of emergency discharge from the on-site sewage treatment works
(STW), the following precautionary measures shall be included in the design of
the STW:
¬°ºÉ¶q´î§C¤u¦a¤º¦Ã¤ô³B²z¼tºò«æ±Æ©ñªº¥i¯à©Ê¡A¶·¦b¦Ã¤ô³B²z¼tªº³]p¤¤¥[¤J¤U¦C¹w¨¾±¹¬I¡G
(a)
standby unit shall be provided to facilitate
repair and maintenance of equipment;
¶·´£¨Ñ«á³Æ¾÷²Õ¥H«K¬°³]³Æ¶i¦æºû׫O¾i¡F
(b)
dual power supply, or back-up power, shall be
provided, in the format of ring main or automatic-operated emergency generator
with sufficient capacity to cope with the demand loading of the essential plant
equipment;
¶·¥HÀô§Î·F½u©Î¦Û°Ê¾Þ§@ªººò«æµo¹q¾÷§Î¦¡´£¨ÑÂù«¨Ñ¹q©Î«á³Æ¹q·½¡A¨Ã³Æ¦³¨¬°÷¯à¤O¥HÀ³¥I¥²nªº¼t¤º³]³Æªºt¸ün¨D¡F
(c)
telemetry system shall be provided to the
closest manned plant for unmanned facilities, such that rectification actions
could be taken quickly in case of malfunction of unmanned facilities; and
¶·¬°³Ì±µªñµL¤H³]¬Iªº¦³¤H¾ÞÁa¼t©Ð³]¸m»»´ú¨t²Î¡A¥H«K¤@¥¹µL¤H³]¬Iµo¥Í¬G»Ù¡A¥i¥H¨³³t±Ä¨ú×¥¿¦æ°Ê¡F¥H¤Î
(d)
manual cleansing shall be allowed at all screens
and overflow bypass to prevent the discharge of floating solids.
¶·¦b©Ò¦³¹jÂo¾¹¤Î·¸¬y®Ç¸ô®e³\¤H¤â²M¼ä¡A¥H¨¾±Æ¥X¯B°Ê©TÅ骫½è¡C
In case of emergency discharge, the
discharge shall not be discharged to the old
¤@¥¹µo¥Íºò«æ±Æ©ñªº±¡ªp¡A¤£±o§â¦Ã¤ô±Æ©ñ¦Ü²`¦`ªeªe¦±¡A¥H§K¹ïªe¦±³y¦¨¤ô½è¤Î¥ÍºA¼vÅT¡C
2.20
For
the reuse of treated sewage effluent (TSE) from sewage treatment works, the reclaimed
water quality shall meet the standards set out in Table 2 of this Permit. The following precautionary measures shall
be adopted for TSE reuse:
´N´`Àô¦A¥Î¦Ã¤ô³B²z¼t¸g³B²zªº¦Ã¤ô¦Ó¨¥¡A¦A³y¤ôªº¤ô½è¶·²Å¦X¥»³\¥iÃÒªí2©Ò¸üªº¼Ð·Ç¡C¶·´N´`Àô¦A¥Î¸g³B²zªº¦Ã¤ô±Ä¨ú¤U¦C¹w¨¾±¹¬I¡G
(a)
To avoid cross connection and hence
contamination, all pipes and fittings used for the TSE water supply and
distribution system shall be in special colour code, e.g. in purple, for
distinguishing them from the pipes and fittings used for the potable/fresh
water supply and distribution systems.
¬°ÁקK¥æ¤e³s±µ¤Î¦]¦Ó³y¦¨¦Ã¬V¡A©Ò¦³¥Î©ó¸g³B²z¦Ã¤ôªº¨Ñ¤ô©M°t¤ô¨t²Îªº³ïºÞ¤Î¸Ë¸m¶·±Ä¥Î¯S§OÃC¦â¼Ð°O¡A¨Ò¦pµµ¦â¡A¥H«K»P¥Î©ó¶¼¥Î¤ô¡þ¹¤ôªº¨Ñ¤ô©M°t¤ô¨t²Îªº³ïºÞ¤Î¸Ë¸m¥[¥HÃѧO¡C
(b)
Regular checking/inspections of the TSE supply
and distribution systems for possible cross connection to the potable/fresh
water supply and distribution system shall be carried out. The use of non-toxic
dye may be adopted in the checking/inspections.
¶·©w´ÁÀˬd¡þµø¹î¸g³B²z¦Ã¤ôªº¨Ñ¤ô©M°t¤ô¨t²Î¡A¥H¬d¬Ý¬O§_¦³¥i¯à¥æ¤e³s±µ¦Ü¶¼¥Î¤ô¡þ¹¤ô¨Ñ¤ô©M°t¤ô¨t²Îªº±¡ªp¡C¥i¨Ï¥ÎµL¬rªº¬V®Æ¶i¦æÀˬd¡þµø¹î¡C
(c)
Warning signs shall be permanently displayed
where public access to TSE is possible (except for toilets) in order to notify the
employees, visitors and the public at large that treated effluent is being used
and is not suitable for drinking.
¦b¤½²³¥i¥H¨ú¥Î¸g³B²z¦Ã¤ôªº¦aÂI¡]´Z©Ò°£¥~¡^¶·¥Ã¤[®i¥Üĵ§i¼Ð»x¡A³qª¾¹µû¡B³X«È¤Î¤@¯ë¥«¥Á¨Ï¥Î¤¤ªº¬O¸g³B²zªº¦Ã¤ô¡A¤£©y¶¼¥Î¡C
2.21
For
the Flushing Water Service Reservoir, the wastewater generated from the regular
cleansing of the Reservoir shall be delivered back to the on-site sewage
treatment works in the LMC or other sewage treatment plant, for proper
wastewater treatment to avoid direct discharging the wastewater into the nearby
stream course without proper treatment.
´N¨R´Z¥Î¤ô°t¤ô®w¦Ó¨¥¡A©w´Á²M²z¤ô®w²£¥Íªº¦Ã¤ô¶·¹B°e¦^¸¨°¨¬w¤u¦a¤ºªº¦Ã¤ô³B²z¼t©Î¨ä¥L¦Ã¤ô³B²z³]¬I§@¾A·íªº¦Ã¤ô³B²z¡A¥H§K¦Ã¤ô¥¼¸g¾A·í³B²z«Kª½±µ±Æ¤Jªþªñªºªe¹D¡C
Measures to
Mitigate Operation Stage Noise Impact
½w¸ÑÀç¹B¶¥¬q¾¸µ¼vÅTªº±¹¬I
2.22
To
mitigate operation stage noise impact, the following noise mitigation measures
shall be implemented during the operation stage of the Project:
¬°½w¸ÑÀç¹B¶¥¬qªº¾¸µ¼vÅT¡A¶·¦b¤uµ{¶µ¥ØªºÀç¹B¶¥¬q±Ä¨ú¤U¦C¾¸µ½w¸Ñ±¹¬I¡G
(a)
noise barriers shall be installed to screen road
traffic noise during the operation stage of the Project as described in Table 3
and Figures 6a, 6b and 6c of this
Permit;
¦p¥»³\¥iÃÒªí3¤Î¹Ï6a¡B6b¤Î6c©Ò»¡©ú¡A¶·¦b¤uµ{¶µ¥ØÀç¹B¶¥¬q¸Ë³]¹jµ«Ì¡A¥H«Ì½ª¹D¸ô¥æ³q¾¸µ¡F
(b)
noise mitigation measures such as silencers,
acoustic louvers and acoustic enclosures for fixed plant noise as described in
Table 3 and with reference to the typical designs as shown in Figure 4 of this
Permit;
´N©T©w¸Ë¸m¾¸µ±Ä¨úªí3©Ò»¡©úªº¾¸µ½w¸Ñ±¹¬I¡A¦p·ÀÁn¾¹¡B¹jµ¦Ê¸Ã®¤Î¹jµ¸n¡A¨Ã°Ñ¦Ò¥»³\¥iÃÒ¹Ï4©Ò¥Üªº¤@¯ë³]p¡F
(c)
at the section of the existing
²{®É¾Q¦³§C¾¸µ¸ô±ª«®Æªº²{¦³¸¨°¨¬w¸ô¸ô¬q¡A¦b¦è±³s±µ¸ô¤uµ{§¹¦¨«á¡A¶·¦p¥»³\¥iÃÒ¹Ï6b©Ò¥Ü¡A×´_¸Ó¸ô¬qªº§C¾¸µ¸ô±¡A¨Ã¶·¹ï¸Ó¬q¸ô±¶i¦æ¾A·íªº©w´ÁºûסC
Measures to
Mitigate Operational Air Quality Impact
¬°½w¸ÑÀç¹B¶¥¬qªÅ®ð½è¯À¼vÅT¶·´£¥æªº¤å¥ó¤Î±Ä¨úªº±¹¬I
2.23
To
reduce operational odour impact, all major odour emitting sources in the
on-site Sewage Treatment Works (STW) in the LMC Loop shall be an enclosed
design and treated by odour treatment facility with at least 95% odour removal
efficiency.
¬°´î§CÀç¹B¶¥¬qªº®ð¨ý¼vÅT¡A¸¨°¨¬wªe®M¦a°Ï¤u¦a¤ºªº¦Ã¤ô³B²z¼t©Ò¦³µo¥X®ð¨ýªº¥Dn¨Ó·½§¡¶·±Ä¥Î±K«Ê¦¡³]p¡A¨Ã¥H®ð¨ý¥h°£²v¦Ü¤Ö¬°95%ªº®ð¨ý³B²z³]¬I¥[¥H³B²z¡C
2.24
To
mitigate the cumulative odour impact, bioremediation with 98% odour removal
efficiency shall be implemented along a section of Shenzhen River, about
¬°½w¸Ñ²Ö¿nªº®ð¨ý¼vÅT¡A¶·ªu着¸¨°¨¬wªe®M¦a°Ï¬s¾F¡þªþªñ¤@¬qªø¬ù4.2¤½¨½ªº²`¦`ªe¡]¦p¥»³\¥iÃÒ¹Ï7©Ò¥Ü¡^¹ê¬I®ð¨ý¥h°£²v¹F¨ì98%ªº¥Íª«°£¦Ã¡C¦p¦³»Ýn¡A¥Íª«°£¦Ã¡A¶·«ö¸gÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡A¨ÃÃÒ©ú¨ä²Å¦XÀôµû³ø§iªº¬ÛÃö¸ê®Æ¤Î«Øij«áªº®ð¨ýºÊ¹î¤Î¼f®Öµ²ªG©Ò¥Ü¡A«½Æ¶i¦æ¡C
Measures to
Mitigate Operation Stage Waste Management Implication
½w¸ÑÀç¹B¶¥¬q¼oª«ºÞ²z¼vÅTªº±¹¬I
2.25
For
disposal of sewage sludge generated from the on-site sewage treatment works
(STW), the sewage sludge shall be delivered to the appropriate government
disposal facilities for proper treatment/disposal. The sewage sludge shall be transported
in fully enclosed water tight containers or skips. The unloading process inside the STW
shall be operated in the designated room which shall be enclosed and served by
negative pressure by extracting odorous gas to deodorizing facilities.
¬°³B¸m¤u¦a¤º¦Ã¤ô³B²z¼t²£¥Íªº¦Ã¤ô²Jªd¡A¦³Ãöªº¦Ã¤ô²Jªd¶·¹B°e¦Ü¾A·íªº¬F©²³B¸m³]¬I§@¾A·í³B²z¡þ³B¸m¡C¦Ã¤ô²Jªd¶·¥H¥þ±K«Ê¤£³z¤ôªº®e¾¹©ÎÀô«O¤æ¹B°e¡C¦Ã¤ô³B²z¼t¤ºªº¨ø¸üµ{§Ç¶·¦b«ü©wªº±K«Ê¥H¤Î¬I¥[tÀ£ªº©Ð¶¡¶i¦æ¡A¥H§â¯ä®ð©â°e¦Ü°£¯ä³]¬I¡C
3
Environmental
Monitoring and Audit Requirements
Àô¹ÒºÊ¹î¤Î¼f®Ö³W©w
3.1
The
EM&A programme shall be implemented in accordance with the relevant procedures
and requirements as set out in the EM&A Manual of the Project. Any major changes to the programme shall be justified by the ET
Leader and verified by the IEC as conforming to the information and
requirements contained in the EM&A Manual before submission to the Director
for approval. The EM&A
programme shall include, among other items, the ecology, noise, water and air
quality monitoring and audit details.
ÀôºÊp¹º¶·«ö·Ó®Ö㪺ÀôºÊ¤â¥U©Ò¸üªº¬ÛÃöµ{§Ç¤Î³W©w°õ¦æ¡Cp¹º¦p¦³«¤j§ó§ï¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø´£¥X¥R¤À²z¥Ñ¡A¨Ã¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôºÊ¤â¥U©Ò¸üªº¸ê®Æ¤Î³W©w¡AµM«á¤~´£¥æ¸pªø§åã¡C¦b¤£¦P«Ø³y¶¥¬q¤¤ÀôºÊp¹º¶·¥]¬A¥ÍºA¡A¾¸µ¡A¤ô¤ÎªÅ®ð½è¼Æ¤Î¼f®Öªº¸Ô±¡¡C
3.2
Samples,
measurements and necessary remedial actions shall be taken in accordance with
the requirements of the EM&A Manual by:
(a)
conducting baseline environmental monitoring;
(b)
conducting impact environmental monitoring;
(c)
carrying out remedial actions described in
Event/Action Plans of the EM&A Manual in accordance with the time frames
set out in Event/Action Plans, or as agreed by the Director, in case where
specified criteria in the EM&A Manual are exceeded; and
(d)
logging and keeping records of details of (a) to
(c) above for all parameters within 3 working days of collection of data or
completion of remedial action(s), for the purpose of preparing and submitting
the monthly EM&A Reports and to make available for inspection on site.
¨ú¼Ë¡B´ú¶q¤Î±Ä¨ú¥²nªº¸É±Ï¦æ°Ê®É¡A§¡¶·«ö·ÓÀôºÊ¤â¥Uªº³W©w¶i¦æ¡G
(a)
¶i¦æÀô¹Ò°ò½uºÊ´ú¡F
(b)
¶i¦æÀô¹Ò¼vÅTºÊ´ú¡F
(c)
¦p¶W¹OÀôºÊ¤â¥U¤º«ü©wªº¼Ð·Ç¡A«h«ö·ÓÀôºÊ¤â¥U¤ºªº¨Æ¥ó / ¦æ°Êp¹º©Òq©úªº®É©Î¸pªø©Ò¦P·Nªº®É¡A°õ¦æ¨Æ¥ó / ¦æ°Êp¹º©Ò»¡©úªº¸É±Ï¦æ°Ê¡F¥H¤Î
(d)
¦b¦¬¶°¼Æ¾Ú©Î§¹¦¨¸É±Ï¦æ°Ê3Ó¤u§@¤Ñ¤º¡A¶·°O¿ý¤Î³Æ¦s¤W¤å(a)¦Ü(c)¶µ¦U°Ñ¼Æªº¸Ô±¡¡A¥Î§@ÀÀ³Æ¨Ã´£¥æ¨C¤ëÀôºÊ³ø§i¡A¨Ã³Æ§´¦³Ãö¸ê®Æ¥H¨Ñ¦b¤u¦a¬d¾\
3.3
Four
hard copies and two electronic copies of the Baseline Monitoring Report shall
be submitted to the Director at least one month before commencement of
construction of the Project. The submission shall be certified by the ET Leader
and verified by the IEC. Additional copies of the submission shall be made
available to the Director upon his request.
¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¶·¦Ü¤Ö´£¦1Ó¤ë¦V¸pªø´£¥æ°ò½uºÊ´ú³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¤å¥ó¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡C¦p¸pªøn¨D¡A«h¶·´£¥æ°ò½uºÊ´ú³ø§iªºÃB¥~½Æ¥»¡C
3.4
Four
hard copies and two electronic copies of monthly EM&A Report shall be
submitted to the Director within 10 working days after the end of each
reporting month. The EM&A Reports shall include a summary of all
non-compliance (exceedances) of the environmental quality performance limits
(Action and Limit Levels). The submissions shall be verified by the IEC. Additional
copies of the submission shall be provided to the Director upon request by the
Director. All
environmental monitoring and audit data submitted under this Permit shall be
true, valid and correct.
¦b³W©w´£¥æ³ø§iªº¤ë¥÷µ²§ô«á10Ó¤u§@¤Ñ¤º¡A¶·¦V¸pªø´£¥æ¤uµ{¶µ¥Ø«Ø³y¶¥¬qªº¨C¤ëÀôºÊ³ø§iªº4¥÷µw½Æ¥»¤Î2¥÷¹q¤lª©¥»¡C¨C¤ëÀôºÊ³ø§i¶·¥]¬A¦UºØ¤£²Å¦X¡]¶W¥X¡^Àô¹Ò½è¯Àªí²{³W¡]¦æ°Ê¤Î·¥¤ô¥¡^±¡ªpªººKn¡C¤å¥ó¦b´£¥æ¸pªø«e¡A¶·¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡C¦p¸pªøn¨D¡A«h¶·´£¥æ¨C¤ëÀôºÊ³ø§iªºÃB¥~½Æ¥»¡C®Ú¾Ú¥»³\¥iÃÒ´£¥æªº©Ò¦³ÀôºÊ¼Æ¾Ú¡A§¡¶·¦³®Ä¤Î¯u¹êµL»~¡C
4
Electronic
Reporting of EM&A Information
ÀôºÊ¸ê®Æªº¹q¤l¶×³ø
4.1
To
facilitate public inspection of the Baseline Monitoring Report and regular EM&A
Reports via the EIAO Internet Website and at the EIAO Register Office,
electronic copies of these Reports shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and/or in Portable Document Format (PDF
version 4.0 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hardcopies as described in Conditions 3.3 and
3.4 of this Permit. For the HTML version, a content page capable of providing
hyperlink to each section and sub-section of these Reports shall be included in
the beginning of the document. Hyperlinks to all figures, drawings and tables
in these Reports shall be provided in the main text from where the respective
references are made. All graphics in these Reports shall be in interlaced GIF/JPEG
format unless otherwise agreed by the Director. The content of the electronic
copies of these Reports must be the same as the hardcopies.
¬°¤è«K¤½²³³z¹LÀôµû±ø¨Ò¤¬Ápºôºô¯¸¤Î¦bÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¬d¾\°ò½uºÊ´ú³ø§i¤Î©w´ÁÀôºÊ³ø§i¡A¥H¶W¤å¥»¼Ð¥Ü»y¨¥¡]HTML¡^¡]²Ä4.0©Î¸û«áª©¥»¡^¤Î/©Î«KÄ⦡¤å¥ó®æ¦¡¡]PDF¡^¡]²Ä4.0©Î¸û«áª©¥»¡^»s§@ªº³ø§iªº¹q¤lª©¥»¡A°£«D¥tÀò¸pªø¦P·N¡A¶·»P¥»³\¥iÃÒ±ø¥ó²Ä3.3¤Î3.4¶µ©Ò»¡©úªºµw½Æ¥»¦P®É´£¥æ¡CÃö©óHTMLªºª©¥»¤è±¡A¥i»P³ø§i¦U¸`¤Î¤p¸`§@¥X¶W¤å¥»³sµ²ªº¥Ø¿ý¶·¦b¤å¥ó¶}ºÝ¥[¤J¡C³ø§i¤º¦UÃþ¹Ïªí¶·¦b¸ü¦³¬ÛÃö¸ê®Æªº¥¿¤å¤º§@¥X¶W¤å¥»³sµ²¡C°£«D¥tÀò¸pªø¦P·N¡A³ø§i¤º©Ò¦³¹Ï§Î§¡¶·¥H¥æ¿ù¦s¨úªºGIF/JPEG®æ¦¡¨î©w¡C³ø§iªº¹q¤lª©¥»¤º®e¡A¥²¶·»Pµw½Æ¥»ªº¤º®e¤@P¡C
4.2
The
Permit Holder shall, set up a dedicated web site and notify the Director in
writing the Internet address where the environmental monitoring and project
data is to be placed, within six weeks after the commencement of construction
of the Project. All released environmental monitoring results described in
Condition 4.1 above and all finalized submission required under this Permit
shall be made available to the public via a dedicated web site to be set up by
the Permit Holder in the shortest practicable time and in no event later than two
weeks after the relevant environmental monitoring data are collected or become
available, unless otherwise agreed with the Director. The Permit Holder shall maintain the
dedicated website for public access of the environmental monitoring data and
reports throughout the entire construction period and until at least one year after
the completion of the EM&A programme as required in the EM&A Manual of
the Project, or otherwise as agreed by the Director.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«á6Ó¬P´Á¤º¡A³]¥ß¯S©wºô¯¸¦s©ñÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A¨Ã¥H®Ñ±³qª¾¸pªø¤¬Ápºôºô§}©Ò¦b¡C°£«D¥tÀò¸pªø¦P·N¡A¤W¤å±ø¥ó²Ä4.1¶µ»¡©úªº©Ò¦³µo¥¬ªºÀô¹ÒºÊ¹îµ²ªG¥H¤Î¥»³\¥iÃÒn¨D´£¥æªº¤å¥ó©w½Z¡A§¡¶·ºÉ§Ö³z¹L¥Ñ³\¥iÃÒ«ù¦³¤H³]¥ßªº¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡A¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó¦³ÃöÀô¹ÒºÊ¹î¼Æ¾Ú¦b¦¬¶°©Î¥i¨Ñµo©ñ«áªº2Ó¬P´Á¤º¤W¸ü¦Ü¸Ó¯S©wºô¯¸¡C°£«D¥tÀò¸pªø¦P·N¡A¦b¤uµ{¶µ¥Øªº¾ãӫسy¤uµ{´Á¶¡¤Î§¹¦¨¤uµ{¶µ¥ØÀôºÊ¤â¥U©Ò¸üªºÀôºÊp¹º«á¦Ü¤Ö1¦~¤º¡A³\¥iÃÒ«ù¦³¤H¶·nºû«ù¸Ó¯S©wºô¯¸¹B§@¨Ñ¤½²³¾\ÄýÀô¹ÒºÊ¹î¼Æ¾Ú¤Î³ø§i¡C
4.3
The
Internet website as described in Condition 4.2 above shall enable user-friendly public access to the
monitoring and project data including the approved EIA Report and the
environmental permit(s) of the Project. The Internet website shall have
features capable of:
¤W¤å±ø¥ó²Ä4.2¶µ»¡©úªº¤¬Ápºôºô¯¸¡A¥²¶·¤è«K¥Î¤á¨Ï¥Î¡AÅý¤½²³®e©ö±µ¹FÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A·í¤¤¥]¬A¸g®Ö㪺Àôµû³ø§i¤Î¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ¡C°£«D¥tÀò¸pªø¦P·N¡A¤¬Ápºôºô¯¸¶·¨ã³Æ³¡¥ó¡A´£¨Ñ¤Uz¥\¯à¡G
(a)
providing access to all environmental monitoring
data collected since the commencement of works;
±µ¹F¤uµ{®i¶}«á©Ò¦¬¶°ªº¥þ³¡Àô¹ÒºÊ¹î¼Æ¾Ú¡F
(b)
searching by date;
«ö¤é´Á·j´M
(c)
searching by types of monitoring data, including
ecology, noise, air and water quality, etc.; and
«öºÊ¹î¼Æ¾ÚÃþ§O·j´M¡A¥]¬A¥ÍºA¡B¾¸µ¡BªÅ®ð¤Î¤ô½èµ¥¡F¥H¤Î
(d)
hyperlinks to relevant monitoring data after
searching;
¦b·j´M«á»P¬ÛÃöªººÊ¹î¼Æ¾Ú§@¥X¶W¤å¥»³sµ²¡C
or otherwise as agreed by the Director.
©Î¸pªø¦P·Nªº¨ä¥L¥\¯à¡C
Notes :
µù¡J
1.
This Permit consists of three parts, namely, PART A
(Main Permit), PART B (Description of Designated Projects) and PART C (Permit Conditions). Any person
relying on this permit should obtain independent legal advice on the legal
implications under the Ordinance, and the following notes are for general
information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡ (³\¥iÃÒ¥Dn³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´N±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2.
If there is a breach of any conditions of this Permit, the Director or
his authorized officer may, with the consent of the Secretary for the Environment,
order the cessation of associated work until the remedial action is taken in
respect of the resultant environmental damage, and in that case the Permit
Holder shall not carry out any associated works without the permission of the
Director or his authorized officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3.
The Permit Holder may apply under section 13 of the Ordinance to the
Director for a variation of the conditions of this Permit. The Permit
Holder shall replace the original permit displayed on the construction site by
the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀô¹Ò¼vÅTµû¦ô±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·±N¸gק諸³\¥iÃÒ¡A´À´«¦b«Ø³y¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4.
A person who assumes the responsibility for the whole or a part of the
designated project(s) may, before he assumes
responsibility of the designated project(s), apply
under section 12 of the Ordinance to the Director for a further environmental
permit.
©Ó¾á«ü©w¤uµ{¶µ¥Øªº¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á«ü©w¤uµ{¶µ¥Ø³d¥ô¤§«e¡A¥i®Ú¾Ú±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5.
Under section 14 of the Ordinance, the Director may with the consent of
the Secretary for the Environment, suspend, vary or cancel this Permit.
The suspended, varied or cancelled Permit shall be removed from display at the
construction site.
®Ú¾Ú±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øÀô¹Ò³\¥iÃÒ¡C¸g¦Q¾Pªº³\¥iÃÒ¥²¶·±q§åµo¥«³õ°£¤U¡A¤£¦A®i¥Ü¡C
6.
If this Permit is cancelled or surrendered during construction or
operation of the Project, another environmental permit must be obtained under
the Ordinance before the Project could be continued. It is an offence
under section 26(1) of the Ordinance to construct or operate a designated
project listed in Part I of schedule 2 of the Ordinance without a valid
environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y©ÎÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~ÄòÀç¿ì¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾Ú±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾Ú±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ì±ø¨Òªþªí2²ÄI ³¡©Ò¦Cªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7.
Any person who constructs or operates the Project contrary to the
conditions or operation in the Permit, and is convicted of an offence under the
Ordinance, is liable:-
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y©ÎÀç¿ì«ü©w¤uµ{¶µ¥Ø¡A®Ú¾ÚÀôµû±ø¨Ò¡A§YÄݥǸo:-
(a)
on a first conviction on
indictment to a fine of $ 2 million and to imprisonment for 6 months;
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(b)
on a second or subsequent
conviction on indictment to a fine of $ 5 million and to imprisonment for 2
years;
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(c)
on a first summary
conviction to a fine at level 6 and to imprisonment for 6 months;
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(d)
on a second or subsequent
summary conviction to a fine of $1 million and to imprisonment for 1 year; and
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¤Î
(e)
in any case where the
offence is of a continuing nature, the court or magistrate may impose a fine of
$ 10,000 for each day on which he is satisfied the offence continued.
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡A«hªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C
8.
The Permit Holder may appeal against any condition of this Permit under
section 17 of the Ordinance within 30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9.
The Notes are for general reference only and that the Permit Holder
should refer to the EIA Ordinance for details and seek independent legal
advice.
¤Wzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C
Environmental Permit No. EP-477/2013
Àô¹Ò³\¥iÃÒ½s¸¹ EP-477/2013
| Figure 1 |
[ Back to First Page ] / [
Back to Main Index ]
Table 1: Summary
of noise mitigation measures during construction phase (referred in Condition 2.9 of this Permit)
ªí1¡G «Ø³y¶¥¬qªº¾¸µ½w¸Ñ±¹¬IºKn (°Ñ¾\¥»³\¥iÃÒ±ø¥ó²Ä2.9¶µ)
Mitigation
Measures ½w¸Ñ±¹¬I |
For the Ecological Area (DP1): ¥ÍºA°Ï(DP1)¡G ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See Figure
4 of this Permit for the typical design of movable noise barrier and
noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) |
For the ¦è±³s±µ¸ô(DP2)¡G ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See Figure
4 of this Permit for the typical design of movable noise barrier and
noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) ¡P
Operation of concrete lorry mixer(s) at least ¡P ²V¾®¤gÅÍ©Õ¨®¹B§@®É¡A¶·¶ZÂ÷¦è±³s±µ¸ô¾¸µ·PÀ³±jªº¦a¤èHWTR-6 ¤ÎHWTR-11¡]¦p¥»³\¥iÃÒ¹Ï2b¤Î3b©Ò¥Ü¡^¦Ü¤Ö25¦Ì¡C ¡P
Provision of
temporary noise barrier (TNB) along
construction access through the Western Connection Road (WCR) before
the commencement of road widening works of the
Western Connection at the existing - TNB 1: Approx. - TNB 2: Approx. - TNB 3: Approx. - TNB 4: Approx. - TNB 5: Approx. - TNB 6: Approx. - TNB 7: Approx. - TNB 8: Approx. - TNB 9: Approx. - TNB 10: Approx. - TNB 11: Approx. - TNB 12: Approx. - TNB 13: Approx. - TNB 14: Approx. - TNB 15: Approx. - TNB 16: Approx. The locations of the TNBs are shown in Figures 2a and 2b of this Permit. ¡P ¦ì©ó²{¦³¸¨°¨¬w¸ô¡A¦b¦è±³s±µ¸ôªº¹D¸ôÂXÁï¤uµ{¶}®i«e¡A¶·ªu¦è³¡³s±µ¸ô¬ÛÃö¸ô¬qªº¬I¤u³q¸ô³]¸mÁ{®É¹jµ«Ì(TNB)¡G - TNB 1: ¬ù46¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F - TNB 2: ¬ù8¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 3: ¬ù5¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 4: ¬ù9¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 5: ¬ù16¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 6: ¬ù15¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 7: ¬ù12¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 8: ¬ù28¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F -
TNB 9: ¬ù22¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 10: ¬ù17¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 11: ¬ù23¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 12: ¬ù18¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F - TNB 13: ¬ù28¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 14: ¬ù27¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 15: ¬ù47¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F¤Î -
TNB 16: ¬ù2¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡C Á{®É¹jµ«Ìªº¦ì¸m¸ü©ó¥»³\¥iÃÒ¹Ï2a¤Î2b¡C ¡P
Provision of
temporary noise barrier along construction access through WCR after the commencement of road widening works of the Western Connection at
the existing - TNB 1: Approx. - TNB 2: Approx. - TNB 3: Approx. - TNB 4: Approx. - TNB 5: Approx. - TNB 6: Approx. - TNB 7: Approx. - TNB 8: Approx. - TNB 9: Approx. - TNB 10: Approx. - TNB 11: Approx. - TNB 12: Approx. - TNB 13: Approx. - TNB 14: Approx. - TNB 15: Approx. - TNB 17: Approx. The locations of the TNBs are shown in Figures 3a and 3b of this Permit. ¡P ¦ì©ó²{¦³¸¨°¨¬w¸ô¡A¦b¦è±³s±µ¸ôªº¹D¸ôÂXÁï¤uµ{¶}®i«á¡A¶·ªu¦è³¡³s±µ¸ô¬ÛÃö¸ô¬qªº¬I¤u³q¸ô³]¸mÁ{®É¹jµ«Ì(TNB)¡G - TNB 1: ¬ù46¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F - TNB 2: ¬ù8¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 3: ¬ù5¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 4: ¬ù9¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 5: ¬ù16¦Ìªø¡B5¦Ì°ªªº¹jµ«Ì¡F -
TNB 6: ¬ù15¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 7: ¬ù13¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 8: ¬ù24¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
TNB 9: ¬ù20¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F - TNB 10: ¬ù11¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F - TNB 11: ¬ù42¦Ìªø¡B1.5¦Ì°ªªº¹jµ«Ì¡F - TNB 12: ¬ù19¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F - TNB 13: ¬ù28¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F - TNB 14: ¬ù27¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F - TNB 15: ¬ù47¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F¤Î - TNB 17:
¬ù37¦Ìªø¡B1¦Ì°ªªº¹jµ«Ì¡C Á{®É¹jµ«Ìªº¦ì¸m¸ü©ó¥»³\¥iÃÒ¹Ï3a¤Î3b¡C |
For the
Direct Link (DP3): ³s±µ³q¹D(DP3)¡G ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See Figure
4 of this Permit for the typical design of movable noise barrier and
noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) |
For the
Drainage System under Internal Transport Networks (DP4): ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See Figure
4 of this Permit for the typical design of movable noise barrier and
noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) |
For the
on-site Sewage Treatment Works
(DP5): ¦Ã¤ô³B²z¼t(DP5)¡G ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See
Figure 4 of this Permit for the
typical design of movable noise barrier and noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) |
For the ¡P
Use of site hoarding
(as temporary noise barriers), movable noise
barriers, noise enclosures and quiet powered mechanical equipment: - A movable noise barrier shall be a barrier with a small-cantilevered upper portion of superficial density
not less than (See Figure
4 of this Permit for the typical design of movable noise barrier and
noise enclosure for reference.) ¡P ¨Ï¥Î¤u¦a³òªO(§@Á{®É¹jµ«Ì)¡B¬¡°Ê¹jµ«Ì¡B¹jµ¸n¤Î§C¾¸µ¾÷°Ê³]³Æ¡G - ¬¡°Ê¹jµ«Ì¶·¬Oªþ¦³³Ì¤pªí±±K«×¬°¨C¥¤è¦Ì14¤d§Jªº¤p«¬ÄaÁu¦¡³»³¡¡A¥H¤Î¤º¸m25²@¦Ì«p§lµÅ¨¼hªº·Æ°Ê©³¸}ªº«Ì»Ù (¦³Ãö¬¡°Ê¹jµ«Ì¤Î¹jµ¸nªº¤@¯ë³]p¡A½Ð°Ñ¦Ò¥»³\¥iÃÒ¹Ï4¡C) |
µù¡G
[1] ¡§TNB¡¨
means ¡§Temporary Noise Barrier¡¨. All the proposed noise barriers are reflective
in terms of acoustic characteristic.
¡uTNB¡v§Y¡uÁ{®É¹jµ«Ì¡v¡C©Ò¦³ÀÀijªº¹jµ«Ì§¡¨ã¤Ï®gÁnµªº¯S©Ê¡C
[2] The above
Table is to be read in conjunction with Figures 2a, 2b, 3a, 3b and 4 of this Permit where
appropriate.
¤WªíÀ³»P¥»³\¥iÃÒ¹Ï2a¡B2b¡B3a¡B3b¤Î4¤@¨Ö¾\Ū(¦p¾A¥Î)¡C
[3] The above
Table is prepared based on Section 4.8, Table 4.31 and Appendix 17-1 of the EIA
Report.
¤Wªí®Ú¾ÚÀôµû³ø§i²Ä4.8¸`¡Bªí4.31¤Îªþ¿ý17-1ÀÀ³Æ¡C
Table 2: The
water quality standards of reuse of Treated Sewage Effluent (TSE) (referred in Condition 2.20 of this Permit)
ªí2¡G´`Àô¦A¥Î¸g³B²z¦Ã¤ôªº¤ô½è¼Ð·Ç(°Ñ¾\¥»³\¥iÃÒ±ø¥ó²Ä2.20±ø¶µ)
Water Quality Parameter ¤ô½è°Ñ¼Æ |
Unit ³æ¦ì |
Recommended
Standards for ¨R´Z¡B´ºÆ[Äéµ@¤Î°Ï°ì¨Ñ§N¨t²Î¸Éµ¹ªº«Øij¼Ð·Ç |
E. coli ¤j¸z±ìµß |
cfu/100mL ӵ߸¨/100²@¤É |
Not detectable ¤£¥iÀË´ú |
Total residual
chlorine (TRC) ´Ý¾l´âÁ`¶q |
mg/L ²@§J/¤É |
>1 (out of treatment system) >0.2 (at point-of-use) >1 (³B²z¨t²Î¥H¥~) >0.2 (¦b¥Î¤ôÂI) |
Dissolved
oxygen (DO) ·»¸Ñ®ñ |
mg/L ²@§J/¤É |
>2 |
Total Suspended
Solids (TSS) Á`Äa¯B©TÅé |
mg/L ²@§J/¤É |
<5 |
Colour ÃC¦â |
HU |
<20 |
Turbidity ²V¿B«× |
NTU |
<5 |
pH »ÄÆPÈ |
- |
6-9 |
Threshold odour
number (TON) ®ð¨ýìHÈ |
TON |
<100 |
BOD5 ¤¤Ñ¥Í¤Æ»Ý®ñ¶q |
mg/L ²@§J/¤É |
<10 |
Ammonia
nitrogen ®ò´á |
mg/L ²@§J/¤É |
<1 |
Synthetic
detergents ¦X¦¨²M¼ä¾¯ |
mg/L ²@§J/¤É |
<5 |
Notes:
µù¡G
[1] Apart from TRC which has been specified, the water
quality standards for all parameters shall be applied at the point-of-use of
the system. ¡§HU¡¨ means ¡§Hazen Unit¡¨. ¡§NTU¡¨ means ¡§Nephelometric Turbidity
Unit¡¨.
°£«ü©úªº´Ý¾l´âÁ`¶q¥~¡A©Ò¦³°Ñ¼Æªº¤ô½è¼Ð·Ç¾A¥Î©ó¨t²Îªº¥Î¤ôÂI¡C¡uHU¡v§Y¡u¶Â´¿¦â«×³æ¦ì¡v¡C¡uNTU¡v§Y¡uÄa¯BÅé´²®g¿B«×³æ¦ì¡v¡C
[2] The above
Table is prepared based on Table 6.11 of the EIA Report.
¤Wªí®Ú¾ÚÀôµû³ø§iªí6.11ÀÀ³Æ¡C
Table 3: Summary of noise mitigation measures for
operation phase (referred in Condition 2.22 of this Permit)
ªí3¡GÀç¿ì¶¥¬qªº¾¸µ½w¸Ñ±¹¬IºKn(°Ñ¾\¥»³\¥iÃÒ±ø¥ó²Ä2.22¶µ)
Mitigation
Measures ½w¸Ñ±¹¬I |
¡P
Provision of noise
barrier (NB)
before operation of the Western
Connection Road (WCR): - NB 1: Approx. - NB 2: Approx. - NB 3: Approx. - NB 4: Approx. - NB 6: Approx. - NB 7: Approx. - NB 8: Approx. - NB 9: Approx. - NB 10: Approx. - NB 11: Approx. - NB 12: Approx. - NB 13: Approx. - NB 14: Approx. - NB 15: Approx. - NB 16: Approx. - NB 23: Approx. - NB 24: Approx. The locations of the NBs are shown in Figures 6a and 6b of this Permit. ¡P ¦b¦è±³s±µ¸ô啓¥Î«e³]¸m¹jµ«Ì¡]NB¡^¡G -
NB 1¡G¬ù16¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 2¡G¬ù42¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 3¡G¬ù27¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 4¡G¬ù14¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 6¡G¬ù50¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 7¡G¬ù8¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 8¡G¬ù10¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 9¡G¬ù33¦Ìªø¡B5¦Ì°ªªº¹jµ«Ì¡F -
NB 10¡G¬ù12¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 11¡G¬ù12¦Ìªø¡B5¦Ì°ªªº¹jµ«Ì¡F -
NB 12¡G¬ù36¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 13¡G¬ù12¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 14¡G¬ù32¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F -
NB 15¡G¬ù27¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 16¡G¬ù57¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F -
NB 23¡G¬ù16¦Ìªø¡B3¦Ì°ªªº¹jµ«Ì¡F¥H¤Î -
NB 24¡G¬ù80¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡C |
¡P
Provision of noise
barrier (NB)
before the operation of
the Direct
Link between MTR LMC Station and the LMC Loop: - NB 19: Approx. - NB 21: Approx. - NB 22: Approx. The locations of the NBs are shown in Figure 6c of this Permit. ¡P ¦b´äÅK¸¨°¨¬w¯¸»P¸¨°¨¬wªe®M¦a°Ïªº³s±µ³q¹D啓¥Î«e³]¸m¹jµ«Ì¡G -
NB 19¡G¦b¹D¸ô¨â®Ç³]¸m¬ù730¦Ìªø¡B0.8¦Ì°ªªºÅ@Äæ¡F -
NB 21¡G¬ù47¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡F¥H¤Î -
NB 22¡G¬ù46¦Ìªø¡B0.8¦Ì°ªªº¹jµ«Ì¡C ¹jµ«Ìªº¦ì¸m¸ü©ó¥»³\¥iÃÒ¹Ï6c¡C |
For the on-site Sewage Treatment Works: ¡P
Noise mitigation
measures including silencers, acoustic louvers and acoustic enclosures shall be installed. ¤u¦a¤ºªº¦Ã¤ô³B²z¼t¡G ¡P
¶·ã³\±Ä¨ú¾¸µ½w¸Ñ±¹¬I¡A¥]¬A·ÀÁn¾¹¡B¹jµ¦Ê¸Ã®©M¹jµ¸n¡F ¡P
¬°§â¤uµ{¶µ¥Ø¹ïÄ®´ß³ò¤º¾¸µ±Ó·P¥Î³~ªº¼vÅT±±¨î¦b¥i±µ¨ü¤ô¥¡A³Ì¤j¤¹³\Án¥\²v¯Å«ü©w¬°75¤À¨©(A)¡A¦ÓÄ®´ß³ò¤º¨S¦³¾¸µ±Ó·P¥Î³~ªºÀô¹Ò«h«ü©w¬°84¤À¨©(A)¡C |
Notes:
µù¡G
[1] ¡§NB¡¨ means ¡§Noise
Barrier¡¨. All the proposed noise barriers are reflective in terms of acoustic
characteristic.
¡uNB¡v§Y¡u¹jµ«Ì¡v¡C©Ò¦³ÀÀijªº¹jµ«Ì§¡¨ã¤Ï®gÁnµªº¯S©Ê¡C
[2] The above
Table is to be read in conjunction with Figures 6a, 6b and 6c of this Permit where
appropriate.
¤Wªí¶·»P¥»³\¥iÃÒ¹Ï6a¡B6b¤Î6c¤@¨Ö¾\Ū(¦p¾A¥Î)¡C
[3] The above
Table is prepared based on Section 4.8, Table 4.31 and Appendix 17-1 of the EIA
Report.
¤Wªí®Ú¾ÚÀôµû³ø§i²Ä4.8¸`¡Bªí4.31¤Îªþ¿ý17-1ÀÀ³Æ¡C