Environmental Permit No.
EP- 498/2015
Àô¹Ò³\¥iÃÒ½s¸¹EP-
498/2015
ENVIRONMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER
499)
Section
10
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10±ø
ENVIRONMENTAL
PERMIT TO DECOMMISSION A DESIGNATED PROJECT
¸Ñ°£¹B§@«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant
to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the
Director of Environmental Protection (the Director) grants this environmental
permit to the Pamela Youde Nethersole
Eastern Hospital (hereinafter referred to as the ¡§Permit Holder¡¨) to decommission
the designated project described in Part B subject
to the conditions specified in Part C. The issue of this environmental permit
is based on the documents, approvals or permissions described below :-
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò)²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø¡]¸pªø¡^±N¥»Àô¹Ò³\¥iÃҧ天ªF°Ï¤×¼w¤Ò¤H¨º¥´¯ÀÂå°| (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨)¥H¸Ñ°£¹B§@B³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§åã©Î³\¥i§@¬°®Ú¾Ú¡G-
Application No. ¥Ó½Ð®Ñ½s¸¹ |
AEP - 498/2015 |
Document in the Register |
(1) Project Profile - Decommissioning of Clinical Waste Incinerators
and Associated Chimneys at the Main Block of Pamela Youde
Nethersole Eastern Hospital, Chai Wan Hong Kong. (Register No.:
PP-521/2015) ¤uµ{¶µ¥Ø²¤¶ ¡V ²M©î¦ì©ó»´ä®ãÆWªF°Ï¤×¼w¤Ò¤H¨º¥´¯ÀÂå°|¥D¼Ó¤º¤§ÂåÀø¼oª«µI¤ÆÄl¤Î¬ÛÃö·Ï囱¤uµ{ (µn°O¥U½s¸¹: PP-521/2015) (2) The Director¡¦s letter of permission to apply directly for Environmental
Permit dated 24 March 2015 (Ref.: (19) in EP2/H20/PT2/15) ¸pªø©ó2015¦~3¤ë24¤éµo¥Xã³\ª½±µ¥Ó½ÐÀô¹Ò³\¥iÃÒªº«H¥ó (ÀÉ®×½s¸¹¡G(19) in EP2/H20/PT2/15) (3) Application for an Environmental Permit submitted
on 20 May 2015 (Application No. AEP-498/2015) ©ó2015¦~5¤ë20¤é´£¥æªºÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹ AEP-498/2015) |
15 June 2015
2015¦~6¤ë 15 ¤é
Date ¤é´Á |
|
(Ken Y. K. WONG) Principal
Environmental Protection Officer for
Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô ¶ÀÄ£¥ú ¥N ¦æ) |
PART
B ( DESCRIPTION OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder
is the description of the designated project(s) mentioned in Part
A of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):-
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡©Ò´£¤Îªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Decommissioning
of Clinical Waste Incinerators and Associated Chimneys at the Main Block of
Pamela Youde Nethersole
Eastern Hospital. [Hereinafter
referred to as ¡§the Project¡¨] ²M©î¦ì©óªF°Ï¤×¼w¤Ò¤H¨º¥´¯ÀÂå°|¥D¼Ó¤º¤§ÂåÀø¼oª«µI¤ÆÄl¤Î¬ÛÃö·Ï囱¤uµ{[¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ ¡§¤uµ{¶µ¥Ø¡¨] |
Nature of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº©Ê½è |
Decommissioning of clinical waste incinerators ¸Ñ°£ÂåÀø¼oª«µI¤ÆÄlªº¹B§@ |
Location of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº¦aÂI
|
Within the Main Block of Pamela Youde
Nethersole Eastern Hospital at Chai Wan. The location of the Project and the
floor plan of the incinerator plant room and associated chimney are shown in Figure 1 and Figure 2 respectively attached to
this Permit. ¦ì©óªF°Ï¤×¼w¤Ò¤H¨º¥´¯ÀÂå°|¥D¼Ó¤º¡C¤uµ{¶µ¥Øªº¦ì¸m¤ÎµI¤ÆÄl©Ð¤Î¬ÛÃö·Ï囱ªº¼Ó±¥±¹Ï¤À§O¸ü©ó¥»³\¥iÃÒ§¨ªþªº¹Ï1¤Î¹Ï2¡C |
Scale and Scope of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
The scope of the
Project involves decommissioning and disposal of two abandoned clinical waste
incinerators, a waste heat recovery boiler, two chimneys, all associated
flues and ductworks. ¤uµ{¶µ¥Ø½d³ò¯A¤Î²M©î¤Î³B²z¨â¥xÂåÀø¼oª«µI¤ÆÄl¡B¤@®y¼o¼öÁçÄl¡B¨â¤ä·Ï囱¡B¥þ³¡¬ÛÃöªº·Ï¹D¤ÎºÞ¹D¡C |
C³¡ (³\¥iÃÒ±ø¥ó)
1. General
Conditions
¤@¯ë±ø¥ó
1.1 The Permit Holder and any
person working on the Project shall comply with all conditions set out in this
Permit. Any non-compliance by any person may constitute a contravention of the
Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the
subject of appropriate action being taken under the EIAO.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]²Ä499³¹¡^ªº³W©w¡A¦Ó·í§½¥i®Ú¾Ú±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2 The Permit Holder shall
ensure full compliance with all legislation from time to time in force
including, without limitation to, the Air Pollution Control Ordinance (Cap.
311), Waste Disposal Ordinance (Cap. 354), Water Pollution Control Ordinance
(Cap. 358) and Noise Control Ordinance (Cap. 400). This Permit does not of
itself constitute any ground of defence against any proceedings instituted
under any legislation or imply any approval under any legislation.
³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò ¡n¡]²Ä311³¹¡^¡B¡m¼oª«³B¸m±ø¨Ò¡n¡]²Ä354³¹¡^¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n¡]²Ä358³¹¡^¤Î¡m¾¸µºÞ¨î±ø¨Ò¡n¡]²Ä400³¹¡^¡C¥»³\¥iÃÒ¥»¨¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3 The Permit Holder shall
make copies of this Permit together with all documents referred to in this
Permit and the documents referred to in Part A of
the Permit readily available at all times for inspection by the Director or his
authorised officers at all sites/offices covered by this Permit. Any reference
to the Permit shall include all documents referred to in the Permit and also
the relevant documents in the Register.
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¡þ¿ì¨Æ³B¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4 The Permit Holder shall
give a copy of this Permit to the person(s) in charge of the site(s) and ensure
that such person(s) fully understands all conditions and all requirements
incorporated in the Permit. The site(s) refers to site(s) of decommissioning of
the Project and shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü¸Ñ°£¹B§@¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
1.5 The Permit Holder shall
display conspicuously a copy of this Permit on the Project site(s) at all
vehicular site entrances/exits or at a convenient location for public¡¦s
information at all times. The Permit Holder shall ensure that the most updated
information about the Permit, including any amended Permit, is displayed at
such locations. If the Permit Holder surrenders a part or the whole of
the Permit, the notice he sends to the Director shall also be displayed at the
same locations as the original Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site(s).
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6 The Permit Holder shall decommission
the Project in accordance with the project description in Part
B of this Permit.
³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A¸Ñ°£¹B§@¤uµ{¶µ¥Ø¡C
1.7 The Permit Holder shall
ensure that the Project is decommissioned in accordance with the information
and recommendations described in the Project Profile (Register No. PP-521/2015),
the application document for environmental permit, other relevant documents in
the Register, the information and mitigation measures described in this Permit.
Where recommendations referred to in the documents of the Register are not
expressly referred to in this Permit, such recommendations are nevertheless to
be implemented unless expressly excluded or impliedly amended in this Permit.
³\¥iÃÒ«ù¦³¤H¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤Uz¸ê®Æ¸Ñ°£¹B§@¡Gµn°O¥U¤ºªº¤uµ{¶µ¥Ø²¤¶
(µn°O¥U½s¸¹¡GPP-521/2015)©Ò»¡©úªº¸ê®Æ¤Î¦U¶µ«Øij¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ©Î½w¸Ñ±¹¬I¡Cµn°O¥U¤å¥ó©Òz«Øij¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«Øij¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁÅ°£©ÎÀq¥Ü×q¡C
1.8 The Permit Holder shall
notify the Director in writing the commencement date of decommissioning of the
Project no later than two weeks prior to the commencement of decommissioning of
the Project. The Permit Holder shall notify the Director in writing immediately
if there is any change of the commencement date of the decommissioning.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¸Ñ°£¹B§@¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦2Ó¬P´Á¥H®Ñ±¤è¦¡§â¸Ñ°£¹B§@¤uµ{ªº¬I¤u¤é´Á³qª¾¸pªø¡C¬I¤u¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
1.9 For the purpose of this
Permit, ¡§commencement of decommissioning works¡¨ does not include works related
to site clearance and preparation, or other works as agreed by the Director.
¬°°õ¦æ¥»³\¥iÃÒ¡A¡u¸Ñ°£¹B§@¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æ¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
2. Specific
Conditions
¯S©w±ø¥ó
Before
Commencement of Decommissioning
2.1 Prior to the decommissioning of the incinerators, inner panels of incinerators, all internal surfaces including the ceiling, walls and the floor of the incinerator room shall be decontaminated by using High Efficiency Particulate Air (HEPA) vacuum cleaner, scrubbing and wet wiping.
2.2 To achieve a full containment approach, the following measures shall be implemented before the commencement of any decommissioning works:
(i)
All unmovable items inside the works
area including doors, air extractor, floor drains within the incinerator room,
and the works area as shown in Figure
2 shall be sealed with 3 layers of fire retardant polythene sheets;
(ii)
A 3-compartment decontamination
unit as shown in Figure 2
shall be constructed for entry into and exit from the works area. The unit shall comprise a dirty room, a
shower room and a clean room. Each
compartment shall be of a minimum size of 2m (height) x 1m (width) x 1m
(length) and lined with 3 layers of fire retardant polythene sheets; and
(iii)
Air movers equipped with HEPA
filters shall be provided to maintain a negative pressure ranging from 1.5mm to
4mm of water within the works area and the 3-compartment decontamination unit
described in Conditions 2.2(i) and 2.2(ii) above.
2.3 To confirm air-tightness of the containment required under Condition 2.2, a smoke test shall be carried out in accordance with the following detailed steps immediately before the execution of decommissioning:
(i)
The works area and the 3-compartment
decontamination unit described in Conditions 2.2(i) and
2.2(ii) above shall be filled with non-toxic smoke using a smoke generator;
(ii)
When the condition described in
Condition 2.3(i) above is achieved, the smoke
generator shall be switched off and a thorough check for smoke leakage outside the
works area and the 3-compartment decontamination unit shall be carried out; and
(iii)
Any leakage of smoke spotted,
when fulfilling Condition 2.3(ii) above, shall be immediately rectified.
During Decommissioning
2.4 To avoid the release of any residual ash and dust to the surroundings, a negative pressure of 1.5mm to 4mm of water shall be maintained within the works area and the 3-compartment decontamination unit throughout the entire course of the decommissioning works.
2.5
All working personnel shall go through the decontamination procedures at
the 3-compartment decontamination unit before leaving the works area.
2.6
To decontaminate the incinerators and ash collectors, the residual ash
inside the incinerators, ash collectors and on the surfaces of the walls and
ceiling of the incinerators shall be removed by scrubbing. The inside of the incinerators, walls, ceilings
and floor shall then be cleaned with a HEPA vacuum cleaner and followed by wet
wiping.
2.7
The scrubbed materials and filtered
materials from the HEPA vacuum cleaner shall be packaged on site and placed
into polythene-lined steel drums for subsequent disposal as stipulated in
Condition 2.9.
2.8 All detached sections of the incinerators, chimneys and all associated flues and ductworks upon removal shall be wrapped with three layers of fire retardant polythene sheets. The outermost wrapping shall be decontaminated by wet wiping in the works area.
Disposal
of Wastes
2.9
All
polythene-lined steel drums containing residual ash collected from the incinerators,
chimneys and all associated flues and ductworks, used HEPA filters and the
filtered materials from HEPA vacuum cleaner, clothes and other contaminated
materials generated during the decommissioning process shall be disposed of at
the Chemical Waste Treatment Facilities.
2.10
All
detached sections of the incinerators, chimneys and all associated flues and
ductworks upon removal shall be wrapped with three layers of fire retardant
polythene sheets. The outermost wrapping shall be decontaminated by wet wiping
in the works area. The wrapped waste shall be disposed of at landfill.
Notes:
µù:
1. This Permit consists
of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit Conditions). Any person relying on this
permit should obtain independent legal advice on the legal implications under
the EIAO, and the following notes are for general information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡
(³\¥iÃÒ¥Dn³¡¤À)¡FB³¡
(«ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡
(³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If there is a breach
of any conditions of this Permit, the Director or his authorized officer may,
with the consent of the Secretary for the Environment, order the cessation of
associated work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¼x±oÀô¹Ò§½§½ªøªº¦P·N«á¥i°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The Permit Holder
may apply under Section 13 of the EIAO to the Director for a variation of the
conditions of this Permit. The Permit Holder shall replace the original permit
displayed on the Project site by the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·§â¸gק諸³\¥iÃÒ´À´«¦b¤uµ{¶µ¥Ø¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A person who assumes
the responsibility for the whole or a part of the designated project(s) may,
before he assumes responsibility of the designated project(s), apply under
Section 12 of the EIAO to the Director for a further environmental permit.
©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under Section 14 of
the EIAO, the Director may with the consent of the Secretary for the
Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site.
®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6. If this Permit is
cancelled or surrendered during decommissioning of the Project, another
environmental permit must be obtained under the EIAO before the Project could
be continued. It is an offence
under Section 26(1) of the EIAO to decommission a designated project listed in
Part II of Schedule 2 of the EIAO without a valid environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø¸Ñ°£¹B§@´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U¸Ñ°£¹B§@Àôµû±ø¨Òªþªí2²ÄII³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7. Any person who decommissions
the Project contrary to the conditions in the Permit, and is convicted of an
offence under the EIAO, is liable:
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U¸Ñ°£¹B§@¤uµ{¶µ¥Ø¡A®Ú¾ÚÀôµû±ø¨Ò¡A§YÄݥǸo-
(i)
on a first conviction on
indictment to a fine of $2 million and to imprisonment for 6 months;
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii)
on a second or subsequent
conviction on indictment to a fine of $5 million and to imprisonment for 2
years;
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii)
on a first summary conviction to
a fine at level 6 and to imprisonment for 6 months;
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv)
on a second or subsequent summary
conviction to a fine of $1 million and to imprisonment for 1 year; and
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¤Î
(v)
in
any case where the offence is of a continuing nature, the court or magistrate
may impose a fine of $10,000 for each day on which he is satisfied the offence
continued.
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄݳsÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ³sÄòªº¨C¤@¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The Permit Holder
may appeal against any condition of this Permit under Section 17 of the EIAO within
30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The Notes are for
general reference only and that the Permit Holder should refer to the EIAO for
details and seek independent legal advice.