Environmental Permit No. FEP-02/040/1999/E

環境許可證編號 FEP-02/040/1999/E

 

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)

Sections 10&12
環境影響評估條例

(
499 )
10及第 12

FURTHER ENVIRONMENTAL PERMIT TO OPERATE A DESIGNATED PROJECT
營辦指定工程項目的新的環境許可證

PART A (MAIN PERMIT)
A
(許可證主要部分)

Pursuant to Sections 10 and 12 of the Environmental Impact Assessment Ordinance (the Ordinance), the Director of Environmental Protection (the Director) grants this Further Environmental Permit to Highways Department  (hereinafter referred to as the "Permit Holder") to operate the designated project described in Part B of this permit subject to the conditions specified in Part C of this Permit.

根據環境影響評估(條例 ) 10 12 條的規定﹐環境保護署署長 (署長 ) 將本新的環境許可證批予 路政署 (下稱 "許可證持有人 ") ﹐以營辦B 所說明的指定工程項目,但須遵守C 所說明的條件。

This Environmental Permit is based on the documents, approvals and applications described below:-

本環境許可證乃根據下文件、批准及申請而簽發:-

 

Application No.

申請書編號

FEP-090/2008

Document in the Register :
登記冊上的文件:

Engineering Feasibility Study for Infrastructural Works for the Proposed Development at Telegraph Bay (Register No. AEIAR - 009/1999)[This Study is hereinafter referred to as "EIA Report 009"]
鋼線灣發展工程可行性研究環境影響評估研究(登記編號﹕AEIAR - 009/1999) 【下文簡稱「環評報告009」】

The Director's letter of approval of the EIA Report dated 26 April 1999, ref (79) in Annex(2) to EP2/H10/09
署長於1999426日發出批准環評報告的信件(檔案編號﹕ref (79) in Annex(2) to EP2/H10/09)

Environmental Monitoring and Audit Manual for Infrastructural Works for the Proposed Development at Telegraph Bay (Register No. EP-032/1999) [This Study is hereinafter referred to as "EM&A Manual 032"]
鋼線灣發展工程環境監察及審核手冊(登記編號﹕EP032/1999) 【下文簡稱「環監手冊032」】


Environmental Permit Issued - Permit No. EP-040/1999 issued on 22 October 1999.
簽發的環境許可證─許可證編號,EP-040/1999;於19991022日簽發。

Application for Variation of Environmental Permit No. VEP-037/2001. [Hereafter referred to as "the Application VEP-037/2001]
申請更改環境許可證編號VEP-037/2001:[下稱"申請表編號VEP-037/2001"]

Application for Variation of Environmental Permit No. VEP-055/2001 [Hereafter referred to as "the Application VEP-055/2001"]
申請更改環境許可證編號VEP-055/2001:[下稱"申請表編號VEP-055/2001"]

Application for Variation of Environmental Permit No. VEP-058/2001 [Hereafter referred to as "the Application VEP-058/2001"]
申請更改環境許可證編號VEP-058/2001:[下稱"申請表編號VEP-058/2001"]

 

Application for Variation of Environmental Permit No. VEP-110/2003 [Hereafter referred to as “the Application VEP-110/2003”]

申請更改環境許可證編號VEP-110/2003:[下稱"申請表編號VEP-110/2003"]

 

Application for Variation of Environmental Permit No. VEP-270/2008 [Hereafter referred to as “the Application VEP-270/2008”]

申請更改環境許可證編號VEP-270/2008:[下稱"申請表編號VEP-270/2008"]

 

Application for Further Environmental Permit No. FEP-090/2008 [Hereafter referred to as “the Application FEP-090/2008”]

申請新的環境許可證編號FEP-090/2008:[下稱"申請表編號FEP-090/2008"]

 

 

 


 

Application No.
申請書編號

Date of Application
申請日期

List of Amendments Incorporated into this Environmental Permit
已包含在本環境許可證內的修訂項目

Date of Amendment
修訂日期

VEP-037/2001

22 January 2001
2001
122

Vary Conditions 1.3, 1.7, 2.1 to 2.5, 3.5, 3.9, 3.10, 3.13 to 3.21, 4.1, 4.2, 4.9 to 4.13, 6.1 to 6.6, 6.8&6.9 in Part C of EP-040/1999. Conditions 3.2&4.12 in Part C of EP-040/1999 deleted.
更改環境許可證編號C部條件第1.3, 1.7, 2.12.5, 3.5, 3.9, 3.10, 3.133.21, 4.1, 4.2, 4.94.13, 6.16.6, 6.86.9項。環境許可證編號EP-040/1999 C部條件第3.24.12取消。

19 February 2001

2001219

VEP-055/2001

29 August 2001
2001
829

Vary Conditions 2.5, 3.1, 3.13, 4.1, 4.2, 4.3, 4.6, 4.9 in Part C and Condition 4 under "Remarks" in Part C of EP-040/1999/A together with Fig. 1, 2, 3 and 4 as well as Appendix 2. Condition 3.12 in Part C of EP-040/1999/A deleted.
更改環境許可証編號C部條件第2.5, 3.1, 3.13 4.1, 4.2, 4.3, 4.6, 4.9項及C部註第4項及圖1, 2, 3, 4及附件2。環境許可證編號EP-040/1999/A C部條件第3.12取消。

27 September 2001

2001927

VEP-058/2001

28 December 2001
2001
1228

Vary Conditions 3.12, 3.14, & 3.19 in Part C of EP-040/1999/B together with Fig. 1, 2, 3, 4 and 5 as well as Appendix 3.  Delete Condition 3.16 in Part C of EP-040/1999/B.  Renumber Conditions 3.17, 3.18, 3.19 & 3.20 in Part C of EP-040/1999/B.
更改環境許可証編號C部條件第3.12,3.14,3.163.19項及圖1, 2, 3, 45及附件3。取消環境許可證編號EP-040/1999/B C部條件第3.16。為環境許可證編號EP-040/1999/B C部條件第3.17, 3.18, 3.19 3.20重新編號。

8 August 2002

200288

VEP-110/2003

30 August 2003

2003830

Vary “Nature of Designated Project” and “Scale and Scope of Designated Project” in Part B; Conditions 1.3, 1.7, 2.1, 2.2, 2.4, 2.5, 3.1, 3.5, 3.19, 4.1, 4.2, 4.3, 4.10, 4.11, 4.12, 5.2, 6.1, 6.2, 6.4, 6.5, 6.6, 6.8 and 6.9 in Part C; and Appendices 1 and 2 of EP-040/1999/C. Delete Conditions 2.3, 3.3, 3.6, 3.8, 3.12 to 3.18, 4.4 to 4.8 and 6.3 in Part C; Figures 2, 3, and 5 as well as Appendix 1A of EP-040/1999/C.  Renumber Conditions 2.4, 2.5, 3.4, 3.5, 3.7, 3.9, 3.10, 3.11, 3.19, 4.9, 4.10, 4.11, 4.12, 4.13, 6.4, 6.5, 6.6, 6.7, 6.8 and 6.9.

更改環境許可証編號B部指定工程項目的性質、規模和範圍;C部條件第1.3, 1.7, 2.1, 2.2, 2.4, 2.5, 3.1, 3.5, 3.19, 4.1, 4.2, 4.3, 4.10, 4.11, 4.12, 5.2, 6.1, 6.2, 6.4, 6.5, 6.6, 6.86.9項及附件12。環境許可證編號EP-040/1999/C C部條件第2.3, 3.3, 3.6, 3.8, 3.123.18, 4.44.8, 6.3及圖2, 35及附件1A取消。為環境許可證編號EP-040/1999/C C部條件第2.4, 2.5, 3.4, 3.5, 3.7, 3.9, 3.10, 3.11, 3.19, 4.9, 4.10, 4.11, 4.12, 4.13, 6.4, 6.5, 6.6, 6.7, 6.8 6.9重新編號。

 

 

As the date of EP-040/1999/D

 

VEP-270/2008

 

28 July 2008

2008728

 

Vary Figure 2 and Appendix 2 under Condition  4.2, vary Appendix 3 under Condition 4.4 and vary Condition 5.2 in Part C of EP-040/1999/D.
更改環境許可證編號EP-040/1999/D  C部條件第4.2 2及 附件2, 更改條件第4.4附件3及更改條件第5.2

 

As the date of EP-040/1999/E

FEP-090/2008

 

23 December 2008

20081223

 

Conditions 1.3, 1.5, 1.10 and 2 to 4.1, 4.5 to 6 in Part C and Appendix 1 of EP-040/1999/E deleted.  Vary Conditions 1.6 and 4.2 to 4.4 in Part C and Notes 2, 4 and 5 of EP-040/1999/E. Renumber Conditions and Appendices.
環境許可證編號EP-040/1999/E  C部條件第 1.3, 1.5, 1.102 4.1,  4.5 6及 附件 1取消。更改環境許可證編號EP-040/1999/E   C部條件第1.6 4.24.4 2, 4 5. 環境許可證條件及附件重新編號。

 

As the date of FEP-01/040/1999/E

 

 

 

 

 

 

 

 

 

 

 

31 December 2008

 

 

 

 

 

 

 

 

 

 

___________________________________________

Date
日期

(Mrs. Shirley LEE)

Principal Environmental Protection Officer

for the Director of Environmental Protection

環境保護署署長

(首席環境保護主任  李韓琇玲 代行)

 

 


PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B(指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this Environmental Permit (the Permit):
下列為本環境許可證(下稱許可證)A所提及的指定工程項目的說明:

 

Title of Designated Project
指定工程項目的名稱

Infrastructural works for Cyberport Development at Telegraph Bay (excluding advance works) [ This designated project is hereinafter referred to as "the Project"]
鋼線灣數碼港發展的基礎設施工程(前期工程除外)【下文簡稱「工程項目」】。

Nature of Designated Project
指定工程項目的性質

Operation of roads, drains and roadside landscape works
營辦道路、排水道及路旁的景觀建設工作。

Location of Designated Project
指定工程項目的地點

Telegraph Bay, Pokfulam.

Figure 1 attached to this Permit shows the locations of the proposed works.
薄扶林鋼線灣

擬議工程的位置載於本許可證的附圖1

Scale and Scope of Designated Project
指定工程項目的規模和範圍

The project is to operate infrastructural works for the Cyberport Development including primarily the following (except advance works*):

l      Road D1 (760m long) and Road D2 (160m long)

(*: The advance works for the project is covered by Environmental Permit No. EP-032/1999 issued on 13 August 1999)

本工程項目是為數碼港發展工程營辦基礎設施,主要包括(前期工程除外)*:

l      D1號幹路(760米長)D2號幹路(160米長)

(*: 鋼線灣數碼港發展的前期工程已包括在一九九九年八月十三日發出的環境許可證編號EP-032/1999)

 


 

PART C (PERMIT CONDITIONS)

 

1.           General Conditions

 

1.1        The Permit Holder shall ensure full compliance with all conditions of this Environmental Permit. Any non-compliance may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499) and shall be definite ground for enforcement action or Permit cancellation where applicable.

 

1.2        This Permit shall not remove the responsibility of the Permit Holder to comply with any legislation currently in force such as the Noise Control Ordinance (Cap.400), Air Pollution Control Ordinance (Cap.311), Water Pollution Control Ordinance (Cap.358), Dumping at Sea Ordinance (Cap.466), the Waste Disposal Ordinance (Cap.354), and others.

 

1.3        The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s).

  

1.4        The Permit Holder shall operate the Project in accordance with the project descriptions in Part B of this Permit

 

1.5        The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and recommendations contained in EIA Report 009 (Register No. AEIAR-009/1999).

 

1.6        All deposited submissions, as required under this Permit, shall be rectified in accordance with the comments, if any, made by the Director, within 1 month of the receipt of the Director's comments or otherwise as specified by the Director.

 

1.7        The Permit Holder shall release all finalized submissions, as required under this Permit, to the public, if requested by the Director, by depositing copies in the Environmental Impact Assessment Ordinance Register Office or any other places or by any other means as specified by the Director for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of submissions.

 

2.          Measures during Operation of the Project

 

2.1     The roadside noise barriers to protect each corresponding phase of residential development from excessive traffic noise shall be properly maintained during the occupation of any residential unit in that particular development phase, the details of which are shown in Fig. 2 and in Appendix 1.

 

2.2     Low noise road surfacing on part of Road D1 shall be properly maintained as shown in Fig. 2.

 

2.3     Compensatory planting of at least 2.2 ha shall be properly maintained as outlined in Appendix 2.

 

 

Notes :

1.       This Permit consists of three parts, namely, PART A (Main Permit), PART B (Description of Designated Project) and PART C (Permit Conditions). Any person relying on this permit should obtain independent legal advice on the legal implications under the Ordinance, and the following notes are for general information only.

2.   The Permit Holder may apply under Section 13 of the Ordinance to the Director for a variation of the conditions of this Permit.

3.   A person who assumes the responsibility for the whole or a part of the designated project may, before he assumes responsibility of the designated project, apply under Section 12 of the Ordinance to the Director for a further environmental permit.

4.       Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for the Environment, suspend, vary or cancel this Permit.

5.   If this Permit is cancelled or surrendered during the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued. It is an offence under Section 26(1) of the Ordinance to operate a designated project listed in Part I of Schedule 2 of the Ordinance without a valid environmental permit.

6.   Any person who carries out the Project contrary to the conditions in the Permit, and is convicted of an offence under the Ordinance, is liable: -

(i) on a first conviction on indictment to a fine of $ 2 million and to imprisonment for 6 months;

(ii) on a second or subsequent conviction on indictment to a fine of $ 5 million and to imprisonment for 2 years;

(iii) on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

(v) in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $ 10,000 for each day on which he is satisfied the offence continued.

7.   The Permit Holder may appeal against any condition of this Permit under Section 17 of the Ordinance within 30 days of receipt of this Permit.

8.   The Notes are for general reference only and that the Permit Holder should refer to the EIA Ordinance for details and seek independent legal advice.

 

Environmental Permit No.  FEP-02/040/1999/E

環境許可證編號 FEP-02/040/1999/E

 

 

Appendix 1

 

 

Details of residential development phasings and corresponding noise barriers

 

During the occupation of any residential unit in each phase of residential development, the respective noise barriers in that development phase shall be properly implemented. The noise barriers shall be provided in accordance with Fig. 2 and in compliance with the relevant submission deposited on the EIAO Register. The phasings of residential development together with the corresponding noise barriers are tabulated as follows:

 

 

Phasing of Residential Development

Noise Mitigation Measures

Phases RIII&RIVA –

high-rise residential buildings

·       7m high vertical noise barrier of 166m long to be provided at the edge of the footpath along Cyberport Road.

Phase RV – high-rise residential buildings

·       3m high vertical noise barrier of 78m long to be provided at the edge of the footpath along Cyberport Road.

 


 

 

 

Appendix 2

(page 1 of 2)

 

Compensatory Planting for Cyberport Development at Telegraph Bay

 

(Extracted from Appendix 9.6, Volume 1B, the EIA Report)

 

Area and locations available for compensatory planting. This appendix also contains a map showing the locations of the suggested compensatory tree planting.

 

The areas suggested for compensatory planting of trees include cut slopes located at Telegraph Bay, Waterfall Bay and below Baguio Villas. Compensatory planting could also be made along the proposal buffer zone separating Route 7 with the proposed Development at Telegraph Bay. Additionally there will also be roadside locations within the development site available for compensatory tree planting as part of the landscape design.

 

 

 

Planted Areas

Location

Approximate Area Available

(ha)

Provided Under this Environmental Permit

 

As shown in Page 2 of 2 in Appendix 2

At least 1. 94

Provided Under Environmental Permit (EP) No. VEP-019/2000/A/EP-065

As shown in Landscape Compensatory Planting As-Built Drawings deposited under Condition 2.15 of EP No. VEP-019/2000/A/EP-065

At least 0. 26

 

Approximate Area Available (ha)

 

At least 2.2 ha

| Figure 1 | | Figure 2 | | Appendix 2 Page 2 |