Environmental Permit No. FEP-01/381/2009
環境許可證編號 FEP-01/381/2009
ENVIRONMENTAL IMPACT ASSESSMENT
ORDINANCE
(CHAPTER 499)
SECTIONS 10 and 12
環境影響評估條例
(第499章)
第10及 12條
FURTHER ENVIRONMENTAL PERMIT TO OPERATE
A DESIGNATED PROJECT
營辦指定工程項目的新的環境許可證
A部 (許可證主要部分)
Pursuant to Sections 10 & 12 of the
Environmental Impact Assessment Ordinance (the EIAO), the Director of
Environmental Protection (the Director) grants this further environmental
permit to DRAINAGE SERVICES
DEPARTMENT (hereinafter referred to as the “Permit Holder”) to operate
the designated project described in Part B subject
to the conditions specified in Part C. The issue of
this further environmental permit is based on the documents, approvals or
permissions described below:
根據《環境影響評估條例》(環評條例) 第10及12條的規定,環境保護署署長(署長)將本新的環境許可證批予渠務署(下稱“許可證持有人”),以營辦B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證是依據下列文件、批准或許可而簽發﹕
Application No. 申請書編號 |
FEP-181/2018
|
|
Document in the Register: 登記冊上的文件: |
(1) (2) (3) (4) (5) |
Formation, Roads and Drains in Area
54, Tuen Mun – Phases 1
and 2 – Environmental, Traffic and Drainage Impact Assessment Review –
Investigation -Additional Services No.2: Environmental Impact Assessment for Tuen Mun Area 54 Sewage Pumping
Station (August 2008) [Hereinafter
referred to as the “EIA Report”] EIA
Executive Summary (August 2008) [Hereinafter
referred to as the “EIA Executive Summary”] Environmental Monitoring and Audit Manual (August
2008) [Hereinafter
referred to as the “EM&A Manual”] (Register No.
AEIAR-122/2008) 屯門第54區的土地開拓、道路及渠務工程 – 第1及第2 期- 環境、交通及渠務影響評估檢討- 勘測-附加顧問服務2: 屯門第54 區污水抽水站環境影響評估報告(2008年8月) [下稱“環評報告”] 環境影響評估報告行政摘要 (2008年8月) [下稱“環評摘要”] 環境監察及審核手冊 (2008年8月) [下稱 “環監手冊”] (登記冊檔號: AEIAR-122/2008) The Director’s letter of approval
of the EIA report dated 12 November 2008 (Reference: (7) in Ax (3) to EP2/N4/F/65 Pt.2) 署長於 Application for environmental
permit received on 8 December 2009 (Application No. AEP-381/2009) 於2009年12月8日收到的環境許可證申請 (申請書編號:AEP-381/2009) Environmental
Permit (No. EP-381/2009) issued on 30
December 2009 於2009年12月30日簽發的環境許可證 (編號EP-381/2009) Application
for further environmental permit received on 30 January 2018
(Application No. FEP-181/2018) 於2018年1月30日收到的新的環境許可證申請 (申請書編號:FEP-181/2018) |
20 February 2018
2018年2月 20 日
Date 日期 |
|
(Raymond W M WONG) Principal Environmental Protection Officer for Director of Environmental Protection 環境保護署署長 (首席環境保護主任黃偉文代行) |
PART B (DESCRIPTION OF DESIGNATED PROJECT)
B部 (指定工程項目的說明)
Hereunder is the description of the designated
project mentioned in Part A of this environmental
permit (hereinafter referred to as the “Permit”):
下列為本環境許可證(下稱“許可證”)A部所提述的指定工程項目的說明﹕
Title
of Designated Project 指定工程項目的名稱 |
Tuen Mun Area 54 Sewage
Pumping station [This designated project is hereinafter referred
to as “the Project”] 屯門第54區污水抽水站 [本指定工程項目下稱
“工程項目”] |
Nature of Designated Project |
A sewage pumping station with an
installed capacity of more than 裝置的泵水能力超過每天 |
Location
of Designated Project 指定工程項目的地點 |
Located in the central part of Site 本工程位於屯門第54 區第 |
Scale and Scope of Designated Project 指定工程項目的規模和範圍 |
To
operate a sewage pumping station with a capacity of about 營辦一個每日抽送量約達 |
C部 (許可證條件)
1.
General Conditions
一般條件
1.1
The Permit Holder and any person working on the Project
shall comply with all conditions set out in this Permit. Any non-compliance by
any person may constitute a contravention of the Environmental Impact
Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of
appropriate action being taken under the EIAO.
許可證持有人及任何從事工程項目的人士必須符合本許可證載列的全部條件。任何人士如有不符合本許可證的情況,可能違反《環境影響評估條例》(「環評條例」) (第499章) 的規定,而當局可根據條例採取適當行動。
1.2
The Permit Holder shall ensure full
compliance with all legislation from time to time in force including, without
limitation to, the Noise Control Ordinance (Cap. 400), Air Pollution Control
Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), and Waste
Disposal Ordinance (Cap. 354). This Permit does not of itself constitute any
ground of defence against any proceedings instituted under any legislation or
imply any approval under any legislation.
許可證持有人須經常確保完全符合現行法例的規定,包括但不限於《噪音管制條例》(第400章);《空氣污染管制條例》(第311章);《水污染管制條例》(第358章);以及《廢物處置條例》(第354章)。本許可證本身不會就根據任何法例提起的法律程序構成任何抗辯理由,或根據任何法例默示任何批准。
1.3
The Permit Holder shall make copies
of this Permit together with all documents referred to in this Permit and the
documents referred to in Part A of the Permit
readily available at all times for inspection by the Director or his authorised
officers at all sites/offices covered by this Permit. Any reference to the Permit
shall include all documents referred to in the Permit and also the relevant
documents in the Register.
許可證持有人須印製本許可證的複本,連同本許可證所述的所有文件或本許可證A部所述文件,以供署長或獲授權人員任何時間內在本許可證所涵蓋的所有工地/辦事處查閱。凡提述本許可證,須包括本許可證所述的所有文件及登記冊內的相關文件。
1.4
The Permit Holder shall give a copy
of this Permit to the person(s) in charge of the site(s) and ensure that such
person(s) fully understands all conditions and all requirements incorporated in
the Permit. The site(s) refers to site(s) of operation of the Project and shall
mean the same hereafter.
許可證持有人須把本許可證的複本交予有關工地的負責人,並確保這些人士完全明白本許可證的所有條件與規定。工地是指營辦工程項目的工地,下文所提及的工地亦屬同一意思。
1.5
The Permit Holder shall display
conspicuously a copy of this Permit on the Project site(s) at all vehicular
site entrances/exits or at a convenient location for public’s information at
all times. The Permit Holder shall ensure that the most updated information
about the Permit, including any amended Permit, is displayed at such locations.
If the Permit Holder surrenders a part or the whole of the Permit, the notice
he sends to the Director shall also be displayed at the same locations as the
original Permit. The suspended, varied or cancelled Permit shall be removed
from display at the Project site(s).
許可證持有人須在工程項目工地的所有車輛進出口或一處方便地點,顯眼地展示本許可證的副本,以供公眾在任何時間內閱覽。許可證持有人須確保在這些地點展示關於本許可證 (包括任何經修訂的許可證) 的最新資料。許可證持有人如交回許可證的部分或全部,必須把其送交署長的通知書,在備有原有許可證的相同地點展示。遭暫時吊銷、更改或取消的許可證必須從工地除下,不再展示。
1.6
The Permit Holder shall operate the
Project in accordance with the project description in Part
B of this Permit.
許可證持有人須依據本許可證B部的工程項目說明,營辦工程項目。
1.7
The Permit Holder shall ensure that the Project is
operated in accordance with the information and all recommendations described
in the EIA Report (Register No.: AEIAR-122/2008), other relevant documents in
the Register; and the information or mitigation measures described in this
Permit, and mitigation measures recommended in submissions that deposited with or approved by the Director as a result of permit
conditions contained in this Permit, and mitigation measures to be recommended
under on going surveillance and monitoring activities
of the Project. Where recommendations referred to in the documents of the
Register are not expressly referred to in this Permit, such recommendations are
nevertheless to be implemented unless expressly excluded or impliedly amended
in this Permit
許可證持有人須確保工程項目的營辦,按照下述資料及措施辦理:環評報告(登記冊編號:AEIAR-122/2008)所說明的資料及建議;登記冊內的其他相關文件;本許可證所說明的資料或緩解措施;根據本許可證內載的條件給予署長存放或提交署長而獲批准的文件所建議的緩解措施;以及在工程項目進行的持續監察及監測工作所建議的緩解措施。登記冊內的文件所述建議如沒有在本許可證明確表示,則仍須實施這些建議,除非獲本許可證明確豁除或默示修訂。
1.8
All deposited submissions, as
required under this Permit, shall be rectified and resubmitted in accordance
with the comments, if any, made by the Director within one month of the receipt
of the Director’s comments or otherwise as specified by the Director.
所有按本許可證規定存放的文件,須在接獲署長的意見(如有者)後1個月內(除非署長另行指定),根據署長的意見加以修正並再向署長提交。
1.9
All submissions approved by the Director,
all submissions deposited without comments by the Director, or all submissions
rectified in accordance with comments by the Director under this Permit shall
be construed as part of the permit conditions described in Part
C of this Permit. Any variation of the submissions shall be approved by
the Director in writing or as prescribed in the relevant permit conditions. Any
non-compliance with the submissions may constitute a contravention of the Environmental
Impact Assessment Ordinance (Cap. 499). All submissions or any variation of the
submissions shall be certified by the Environmental Team (ET) Leader and
verified by the Independent Environmental Checker (IEC) referred to Conditions
2.1 and 2.2 below, before submitting to the Director under the Permit.
所有提交署長並獲批准的文件、所有提交署長存放而沒有收到署長意見的文件、和根據本許可證提交並已依照署長的意見作出修訂的所有文件,將詮釋為本許可證C部所說的許可證條件的一部分。對提交文件所作的任何修訂,均須獲得署長的書面批准,或符合有關許可證條件所述。凡與所提交的文件有不符合的情況,均可能構成違反《環境影響評估條例》(第499章)。所有文件或其任何修訂,按本許可證規定提交署長前,須由下述條件第2.1及2.2項所述環境小組組長核證及獨立環境查核人核實。
1.10
The Permit Holder shall release all
finalized submissions as required under this Permit, to the public by
depositing copies in the EIAO Register Office, or in any other places, or any
internet websites as specified by the Director, or by any other means as
specified by the Director for public inspection. For this purpose, the Permit
Holder shall provide sufficient copies of the submissions.
許可證持有人須把所有根據本許可證規定而提交的文件定稿向公眾發放,方法是把上述文件的副本存放在環境影響評估條例登記冊辦事處,或署長指定的任何其他地方或互聯網網站,或依照署長指定的任何其他方法,供公眾查閱。因此,許可證持有人須提供足夠數量的文件複本。
1.11
All submissions to the Director
required under this Permit shall be delivered either in person or by registered
mail to the EIAO Register Office (currently at 27/F, Southorn
Centre,
按本許可證的規定向署長提交的所有文件,須親身送交或以掛號方式郵寄至環境影響評估條例登記冊辦事處(現址為香港灣仔軒尼詩道130號修頓中心27樓)。所有按本許可證規定提交的文件定稿的電子版本,均須以超文本標示語言 (HTML) (第4.0或較後版本) 和便攜式文件格式
(PDF) (第4.0或較後版本) 製作,除非另獲署長同意,並須與硬複本同時提交。
1.12
The Permit Holder shall notify the
Director in writing the commencement date of operation of the Project at least
two weeks prior to the commencement of operation of the Project. The Permit
Holder shall notify the Director in writing immediately if there is any change
of the commencement date of the operation.
許可證持有人須在開始營辦工程項目前,至少提早2個星期以書面方式把開始營辦工程項目的日期通知署長。營辦日期如有任何更改,許可證持有人必須立即以書面方式通知署長。
2.
Specific Conditions
特定條件
Employment of Environmental Monitoring and Audit
(EM&A) Personnel
聘用環境監察及審核(環監)人員
2.1
An Environmental Team (ET) shall be established by the Permit Holder no later than two weeks before the commencement of
operation of the Project. The ET shall not be in any way an associated body of the
Contractor or the Independent Environmental Checker (IEC) for the Project. The
ET shall be headed by an ET Leader. The ET Leader shall be a person who has at
least 7 years of experience in environmental monitoring and auditing (EM&A)
or environmental management. The ET and the ET Leader shall be responsible for
the implementation of the EM&A programme in accordance with the EM&A
requirements as contained in the EM&A Manual of the Project. The ET Leader
shall keep a contemporaneous log-book of each and every instance or
circumstance or change of circumstances, which may affect the compliance with
the recommendations of the EIA Report (Register No.:
AEIAR-122/2008) and this Permit. The ET Leader shall notify the IEC
within one working day of the occurrence of any such instance or circumstance
or change of circumstances. The ET Leader’s log-book shall be kept readily
available for inspection by all persons assisting in supervision of the
implementation of the recommendations of the EIA Report (Register No.: AEIAR-122/2008) and this Permit or by the Director
or his authorized officers. Failure to maintain records in the log-book,
failure to discharge the duties of the ET Leader as defined in the EM&A
Manual or failure to comply with this Condition would entitle the Director to
require the Permit Holder by notice in writing to
replace the ET Leader. Failure by the Permit Holder to make replacement, or further failure to keep contemporaneous
records in the log-book despite the employment of a new ET Leader may render the Permit liable to
suspension, cancellation or variation.
在工程項目的營辦展開前,許可證持有人須至少提早2個星期成立一個環境小組。環境小組不得與工程項目的承辦商或獨立環境查核人有任何聯繫。環境小組須由一名環境小組組長帶領。環境小組組長須在環境監察及審核(環監)或環境管理方面至少有7年經驗。環境小組及環境小組組長須按工程項目的環監手冊內載的環監要求,執行環監計劃。環境小組組長須保存一本記錄冊,同時記載可能會影響環評報告(登記冊編號:AEIAR-122/2008)的建議及本許可證的符合情況的每宗事件、每種情況或每次情況變化。環境小組組長須在發生任何類似事件、情況或情況變化後1個工作天內通知獨立環境查核人。存放這本環境小組組長記錄冊的地方,須可供協助督導執行環評報告(登記冊編號:AEIAR-122/2008)的建議及本許可證的所有人士、署長或獲授權人員隨時查閱。環境小組組長如未能在記錄冊保存記錄、未能執行環監手冊所列明的環境小組組長職務,或未能符合本條件的規定,署長有權以書面要求許可證持有人撤換環境小組組長。許可證持有人如未能安排人選替補,或在聘用新環境小組組長後仍未能在記錄冊保存同期的記錄,或會導致許可證遭暫時吊銷、取消或更改。
2.2
An IEC shall
be employed by the Permit Holder no later than two weeks before the commencement of operation of the Project.
The IEC shall not be in any way an associated body of the Contractor or the ET
for the Project. The IEC shall be a person who has at least 7 years of
experience in EM&A or environmental management. The IEC shall be
responsible for duties defined in the EM&A Manual and shall audit the
overall EM&A performance, including the implementation of all environmental
mitigation measures, submissions required in the EM&A Manual, and any other
submissions required under this Permit. In addition, the IEC shall be
responsible for verifying the environmental acceptability of permanent and
temporary works, relevant design plans and submissions under this Permit. The
IEC shall verify the log-book(s) mentioned in Condition 2.1 of this Permit. The
IEC shall notify the Director by fax, within one working day of receipt of
notification from the ET Leader of each and every change of circumstances or
non-compliance with the recommendations of the EIA Report (Register No.: AEIAR-122/2008) and this Permit,
which might affect the monitoring or control of adverse environmental impacts
from the Project. In case the IEC fails to so notify the Director of the same, fails to discharge the duties of the IEC as defined in
the EM&A Manual or fails to comply with this Condition, the Director may
require the Permit Holder by notice in
writing to replace the IEC. Failure to replace the IEC as directed or further
failure to so notify the Director despite employment of a new IEC may render
the Permit liable to suspension, cancellation or variation. Notification by the
Permit Holder is the same as notification by the IEC for the purpose of this
Condition.
在工程項目的營辦展開前,許可證持有人須至少提早2個星期聘用一名獨立環境查核人。獨立環境查核人不得與工程項目的承辦商或環境小組有任何聯繫。獨立環境查核人須在環監或環境管理方面至少有7年經驗。獨立環境查核人須執行環監手冊所列明的職務,以及審核整體的環監表現,包括實施所有環境緩解措施、提交環監手冊規定的文件,以及提交本許可證所要求的其他文件。此外,獨立環境查核人須核實永久及臨時工程在環境上的可接受程度、相關的設計圖則和根據本許可證提交的文件,並須核實本許可證條件第2.1項所述的記錄冊。在每次發生事件、出現情況變化或不符合環評報告(登記冊編號:AEIAR-122/2008)的建議及本許可證的情況,而可能會妨礙就工程項目所造成不良環境影響而進行的監察或控制工作時,獨立環境查核人須在接獲環境小組組長通知後1個工作天內以傳真方式通知署長。獨立環境查核人如未能通知署長有關情況,未能執行環監手冊所列明的獨立環境查核人職務,或未能符合本條件的規定,署長可以書面要求許可證持有人撤換獨立環境查核人。如未能按指示撤換獨立環境查核人,或在聘用新獨立環境查核人後仍未能通知署長有關情況,則或會導致許可證遭暫時吊銷、取消或更改。為執行本條件,許可證持有人的通知等同獨立環境查核人的通知。
Measures to Mitigate Odour
Impact during Operation of the Project
工程項目營辦期間氣味影響緩解措施
2.3
To minimize the odour impact
arising from the operation of the pumping station, the following measures shall
be implemented before operation of the Project:
為盡量減少抽水站操作期間造成的氣味影響,工程項目營辦前須實施下列措施:
(i)
The
entire pumping station shall be enclosed;
抽水站須全面圍封;
(ii) A deodorizer
with at least 90% odour removal efficiency or
otherwise agreed by the Director shall be installed. The vent pipe of the deodorizer shall be
directed away from the adjacent sensitive receivers as shown in Figure 2; and裝設除臭效能至少達90% 或經署長同意的除臭裝置。除臭裝置排氣管的朝向須如圖2所示,遠離附近的敏感受體; 以及
(iii) A
standby deodorizer, with at least 90% odour removal efficiency or otherwise agreed by the
Director, shall be provided to cater for breakdown and maintenance of the duty
deodorizer.
裝設除臭效能至少達90% 或經署長同意的備用除臭裝置,以防原有的除臭裝置發生故障或進行維修。
Measures to Mitigate Water Quality Impacts during
Operation of the Project
工程項目營辦期間水質影響緩解措施
2.4
To minimize the occurrence of
emergency discharge of untreated effluent from the Project, a standby pump and
dual power supply shall be provided and properly maintained before and during
operation of the Project respectively.
為盡量減低工程項目發生緊急排放未經處理污水的情況,工程項目營辦之前及期間,須分別配置後備泵及維持雙重電力供應,並妥為維修保養。
3.
Environmental
Monitoring and Audit Requirements
環境監察及審核規定
3.1
All measures recommended in the
EIA Report (Register No. AEIAR-122/2008) and the EM&A Manual shall be fully
and properly implemented in accordance with the requirements and time
schedule(s) set out in the EM&A Manual and any subsequent amendments
approved by the Director.
環評報告(登記冊編號:AEIAR-122/2008)及環監手冊內建議的所有措施,均須按照環監手冊的規定和時間表,以及其後獲署長批准的任何修改,予以徹底及妥善執行。
3.2
Any changes to the monitoring and
audit requirements shall be justified by the ET Leader and verified by the IEC
as conforming to the information and requirements set out in the EM&A
Manual, and shall be submitted to the Director for approval.
環監規定如有任何更改,須由環境小組組長提出充分理由,並由獨立環境查核人核實,證明其符合環監手冊所載資料及規定,並須提交署長批准。
Notes:
註:
1. This Permit
consists of three parts, namely, Part A (Main
Permit), Part B (Description of Designated Project)
and Part C (Permit Conditions). Any person relying on this permit should
obtain independent legal advice on the legal implications under the EIAO, and
the following notes are for general information only.
本許可證共有3部,即A部 (許可證主要部分);B部 (指定工程項目的說明) 及C部 (許可證條件)。任何援引本許可證的人士須就環境影響評估條例 (「條例」) 的法律含意徵詢獨立法律意見,下述註解只供一般參考用。
2. If there is a breach
of any condition of this Permit, the Director or his authorized officer may,
with the consent of the Secretary for the Environment, order the cessation of
associated work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
如違反本許可證的任何條件,署長或獲授權人員可在環境局局長的同意下勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或獲授權人員同意,不得進行任何相關工程。
3. The Permit Holder
may apply under Section 13 of the EIAO to the Director for a variation of the
conditions of this Permit. The Permit Holder shall replace the original permit
displayed on the Project site by the amended permit.
許可證持有人可根據條例第13條的規定向署長申請更改本許可證的條件。許可證持有人須以經修訂的許可證替換在工程項目的工地內展示的原有許可證。
4. A person who
assumes the responsibility for the whole or a part of the Project may, before
he assumes responsibility of the Project, apply under Section 12 of the EIAO to
the Director for a further environmental permit.
承擔工程項目整項或部分工程的責任的人,在承擔責任之前,可根據條例第12條的規定向署長申請新的環境許可證。
5. Under Section 14
of the EIAO, the Director may with the consent of the Secretary for the
Environment suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site.
根據條例第14條的規定,署長可在環境局局長的同意下暫時吊銷、更改或取消本許可證。遭暫時吊銷、更改或取消的許可證必須從工程項目的工地除下,不再展示。
6. If this Permit is
cancelled or surrendered during operation of the Project, another environmental
permit must be obtained under the EIAO before the Project could be
continued. It is an offence under
Section 26(1) of the EIAO to operate a designated project listed in Part I of Schedule 2 of the EIAO without a valid environmental
permit.
如本許可證在工程項目營辦期間取消或交回,則在繼續進行工程項目之前,必須先根據條例規定取得另一份環境許可證。根據條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下營辦條例附表2第I部所列明的指定工程項目,即屬犯罪。
7. Any person who
operates the Project contrary to the conditions in the Permit, and is convicted
of an offence under the EIAO, is liable:
如任何人在違反本許可證的條件下營辦工程項目,根據條例,即屬犯罪:
(i)
on a first conviction on indictment to a fine of $2
million and to imprisonment
for 6 months;
一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;
(ii)
on a second or
subsequent conviction on indictment to a fine of $5 million and to imprisonment
for 2 years;
一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;
(iii)
on a first summary conviction to a fine at level 6 and
to imprisonment for 6 months;
一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;
(iv)
on a second or subsequent summary conviction to a fine
of $1 million and to imprisonment for 1 year; and
一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;及
(v)
in any case where
the offence is of a continuing nature, the court or magistrate may impose a
fine of $10,000 for each day on which he is satisfied the offence continued.
在任何情況下如該罪行屬連續性質,法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。
8.
The Permit Holder may appeal against any condition of
this Permit under Section 17 of the EIAO within 30 days of receipt of this
Permit.
許可證持有人可在接獲本許可證後30天內,根據條例第17條就本許可證的任何條件提出上訴。
9.
The Notes are for general reference only and that the
Permit Holder should refer to the EIAO for details and seek independent legal
advice.
上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。