Environmental Permit
No. FEP-13/364/2009/H
Àô¹Ò³\¥iÃÒ½s¸¹ FEP-13/364/2009/H
ENVIRONMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10¤Î12±ø
FURTHER
ENVIRONMENTAL PERMIT TO CONSTRUCT
PART
OF A DESIGNATED PROJECT
«Ø³y«ü©w¤uµ{¶µ¥Øªº³¡¤À¦Óµo¥X·sªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant
to Sections 10 and 12 of the Environmental Impact Assessment Ordinance (EIAO),
the Director of Environmental Protection (the Director) grants this Further Environmental
Permit to LEIGHTON CONTRACTORS (ASIA) LIMITED and CHINA STATE
CONSTRUCTION ENGINEERNG (HONG KONG) LIMITED jointly trading as LEIGHTON ¡V CHINA
STATE JOINT VENTURE (hereinafter
referred to as the "Permit Holder") to construct the part of designated project described in Part B subject to the conditions specified in Part
C. The issue of this Further Environmental
Permit is based on the documents, approvals or permissions described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò)²Ä10±ø¤Î12±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»·sªºÀô¹Ò³\¥iÃҧ天§¹y«Ø¿v(¨È¬w)¦³¤½¥q¤Î¤¤°ê«Ø¿v¤uµ{(»´ä)¦³¤½¥qÁp¦X¸gÀ秹y¡V¤¤«ØÁpÀç (¤UºÙ ¡§³\¥iÃÒ«ù¦³¤H¡¨)¡C¥H«Ø³y¥»³\¥iÃÒB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Øªº³¡¤À¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»·sªºÀô¹Ò³\¥iÃÒªºµo¥X¡A¤Î¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§åã©Î³\¥i§@¬°®Ú¾Ú¡G
Application No. ¥Ó½Ð®Ñ½s¸¹ |
FEP-199/2020
|
Document in the Register : µn°O¥U¤Wªº¤å¥ó: |
1.
Central - Wan Chai Bypass and Island Eastern
Corridor Link (Register No.:
AEIAR-041/2001) -
Environmental Impact
Assessment Report (July 2001) -
Environmental Monitoring
and Audit Manual -
Executive Summary 2.
The Director¡¦s letter of approval of the
CWB&IECL EIA Report dated 31 August 2001 referenced (19) in Ax(2) to
EP2/H4/A/10 II 3.
Wan Chai Development Phase II and Central-Wan
Chai Bypass (Register No.: AEIAR-125/2008) -
Environmental Impact
Assessment Report (December 2007) -
Environmental Monitoring
and Audit Manual -
Executive Summary -
Further information
received from the Civil Engineering and Development Department on 11 March
2008, 9 April 2008 and 14 November 2008 under Section 8(1) of the Environmental Impact Assessment Ordinance 4.
The Director¡¦s letter of approval of the WDII&CWB
EIA Report dated 11 December 2008 referenced (85) in EP2/H4/S3/15 Pt.2 5.
Central Reclamation Phase III ¡V Studies, Site
Investigation, Design and Construction (Register
No.: AEIAR-040/2001) -
Environmental Impact
Assessment Report (July 2001) -
Environmental Monitoring
and Audit Manual -
Executive Summary 6.
The Director¡¦s letter of approval of the CRIII
EIA Report dated 31 August 2001 referenced (19) in Ax(4) to EP2/H4/C/09 II 7.
Environmental Permit Issued ¡V Permit No.:
EP-356/2009 issued to Civil Engineering and Development Department on 30 July
2009 for construction of the following designated projects: (i) Permanent and temporary reclamation works
including associated dredging works in Wan Chai Development Phase II (WDII)
area (referred to as ¡§DP3¡¨ in the WDII&CWB EIA Report); (ii) Wan Chai East Sewage Outfall (referred to as ¡§DP5¡¨ in the
WDII&CWB EIA Report); and (iii) Dredging for the Cross-harbour
Water Mains from Wan Chai to Tsim Sha Tsui (referred to
as ¡§DP6¡¨ in the WDII&CWB EIA Report). 8.
Application for Environmental Permit and
attachments submitted by the Permit Holder on 27 July 2009 (Application No.:
AEP-364/2009) 9.
Environmental Permit (No. EP-364/2009) issued
on 17 August 2009 10.
Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 28 July 2010 (Application No. VEP-321/2010) 11.
Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 31 August 2012 (Application No. VEP-374/2012) 12.
Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 20 June 2014 (Application No. VEP-443/2014) 13. Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 28 October 2015 (Application No. VEP-485/2015) 14. Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 7 December 2016 (Application No. VEP-512/2016) 15. Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 10 May 2019 (Application No. VEP-561/2019) 16. Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 17 September 2019 (Application No. VEP-565/2019) 17. Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 27 March 2020 (Application No. VEP-572/2020) 18.
Application
documents for Further of Environmental Permit including all attachments
submitted by the Permit Holder on 7 May 2020 (Application No. FEP-199/2020) 1.
¤¤Àô¤ÎÆW¥J¶¹D©MªF°Ï¨«´Y³s±µ¸ô³]p¤Î«Ø¿v¤uµ{ (µn°O¥U½s¸¹: AEIAR¢w041/2001) -
Àô¹Ò¼vÅTµû¦ô³ø§i (2001¦~7¤ë) [¤UºÙ¡uCWB&IECLÀôµû³ø§i¡v] -
Àô¹ÒºÊ¹î¼f®Ö¤â¥U - ¦æ¬FºKn 2.
¸pªø©ó2001 ¦~8¤ë31¤éµo¥XCWB&IECLÀôµû³ø§iªº§åã«H¡AÀÉ®×½s¸¹: (19) in Ax(2) to EP2/H4/A/10 II 3.
ÆW¥Jµo®ip¹º²Ä¤G´Á¤Î¤¤ÀôÆW¥J¶¹D (µn°O¥U½s¸¹: AEIAR-125/2008) ¡P
Àô¹Ò¼vÅTµû¦ô³ø§i (2007¦~12¤ë) [¤UºÙ¡uWDII&CWBÀôµû³ø§i¡v] ¡P
Àô¹ÒºÊ¹î¼f®Ö¤â¥U ¡P
¦æ¬FºKn ¡P
¤g¤ì¤uµ{©Ý®i¸p®Ú¾Ú±ø¨Ò²Ä8.(1)±ø©ó2008¦~3¤ë11¤é¡B2008¦~4¤ë9¤é¤Î2008¦~11¤ë14¤é©Ò´£¥æªº¶i¤@¨B¸ê®Æ 4.
¸pªø©ó2008 ¦~12¤ë11¤éµo¥X§åãWDII&CWBÀôµû³ø§iªº«H¥ó¡AÀÉ®×½s¸¹:
(85) in EP2/H4/S3/15 Pt.
2 5.
¤¤Àô¶ñ®üp¹º²ÄIII´Á - ¬ã¨s¡B¹ê¦a³ô´ú¡B³]p»P«Ø¿v(µn°O¥U½s¸¹:AEIAR-040/2001) ¡P
Àô¹Ò¼vÅTµû¦ô³ø§i (2001¦~7¤ë) [¤UºÙ¡uCRIIIÀôµû³ø§i¡v] ¡P
Àô¹ÒºÊ¹î¼f®Ö¤â¥U ¡P
¦æ¬FºKn 6.
¸pªø©ó2001 ¦~8¤ë31¤éµo¥X CRIIIÀôµû³ø§iªº§åã«H¡AÀÉ®×½s¸¹: (19) in Ax(4) to EP2/H4/C/09 II 7.
¤wñµoªºÀô¹Ò³\¥iÃÒ¡V ³\¥iÃÒ½s¸¹EP-356/2009; ©ó2009¦~7¤ë30¤éñµo»P¤g¤ì¤uµ{©Ý®i¸p¥H«Ø³y¥H¤U«ü©w¤uµ{¶µ¥Ø: (i) ¦bÆW¥Jµo®ip¹º²Ä¤G´Áªº¥Ã¤[¤ÎÁ{®É¶ñ®ü¤uµ{(¥]¬A¬ÛÁp«õªd¤uµ{) (WDII&CWBÀôµû³ø§i¤ººÙ¡§DP3¡¨) (ii)
ÆW¥JªF¦Ã¤ô±Æ¤ô¤f(WDII&CWBÀôµû³ø§i¤ººÙ¡§DP5¡¨);¤Î (iii)
ÆW¥J¦Ü¦y¨F©C®ü©³¿é¤ôºÞªº«õªd¤uµ{(WDII&CWBÀôµû³ø§i¤ººÙ¡§DP6¡¨)¡C 8.
³\¥iÃÒ«ù¦³¤H©ó2009 ¦~7 ¤ë27 ¤é´£¥æªºÀô¹Ò³\¥iÃҥӽФå¥ó¤Îªþ¥ó(¥Ó½Ð®Ñ½s¸¹: AEP-364/2009) 9.
¤wñµoªºÀô¹Ò³\¥iÃÒ (½s¸¹ : EP-364/2009) ©ó 2009¦~ 8 ¤ë 17¤éñµo 10. ³\¥iÃÒ«ù¦³¤H©ó2010¦~ 7¤ë28¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-321/2010) 11. ³\¥iÃÒ«ù¦³¤H©ó2012¦~ 8¤ë31¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-374/2012) 12. ³\¥iÃÒ«ù¦³¤H©ó2014¦~ 6¤ë20¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-443/2014) 13. ³\¥iÃÒ«ù¦³¤H©ó2015¦~ 10¤ë28¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-485/2015) 14. ³\¥iÃÒ«ù¦³¤H©ó2016¦~12¤ë7¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-512/2016) 15. ³\¥iÃÒ«ù¦³¤H©ó2019¦~5¤ë10¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-561/2019) 16. ³\¥iÃÒ«ù¦³¤H©ó2019¦~9¤ë17¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-565/2019) 17. ³\¥iÃÒ«ù¦³¤H©ó2019¦~3¤ë27¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GVEP-572/2020) 18. ³\¥iÃÒ«ù¦³¤H©ó2020¦~5¤ë7¤é´£¥æªº·sªºÀô¹Ò³\¥iÃҥӽФå¥ó¥]¬A©Ò¦³ªþ¥ó(¥Ó½Ð®Ñ½s¸¹¡GFEP-199/2020) |
2 June 2020 2020 ¦~ 6 ¤ë 2 ¤é |
|
|
Date ¤é´Á |
|
(Sunny C.W.Cheung) Principal Environmental Protection
Officer for Director of Environmental
Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô ±i®iµØ
¥N¦æ) |
PART B
(DESCRIPTION OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder
is the description of the designated project mentioned in Part
A of this environmental permit (hereinafter referred to as ¡§the
Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title of Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Central ¡V Wan
Chai Bypass (CWB) including its Road Tunnel and Slip Roads (referred to as ¡§DP1¡¨ in the
WDII&CWB EIA Report) (This designated project is hereafter referred to as
¡§the Project¡¨) ¡V as part of the ¡§DP1¡¨ which is
covered in the Environmental Permit No. EP-364/2009/H ¤¤ÀôÆW¥J¶¹D¡A¥]¬A¨ä¦æ¨®ÀG¹D¤Î³s±µ¸ô (¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ¡§¤uµ{¶µ¥Ø¡¨) |
Nature of Designated Project «ü©w¤uµ{¶µ¥Øªº©Ê½è |
The Project
will involve construction of: ¡P
a trunk road; and ¡P
its road tunnel more than 800m in
length between portals ¦¹¤uµ{¶µ¥Ø¯A¤Î¿³«Ø: ¡P
¤@±ø¥D·F¹D; ¤Î ¡P
¨ä¤J¤f¤§¶¡ªºªø«×¶W¹L800¦Ìªº¦æ¨®ÀG¹D |
Location of the part of Designated Project ¨ä¤¤³¡¤À«ü©w¤uµ{¶µ¥Øªº¦aÂI |
The location
of the part of the Project is ¡§Slip road 3¡¨, details shown in Figure 1 of this Permit ¸Ó³¡¤À«ü©w¤uµ{¶µ¥Ø¦ì©ó³s±µ¸ô3¡A¸Ô±¡½Ð°Ñ¾\³\¥iÃÒ¹Ï1 |
Scale and Scope of the Part of the Designated Project |
The
scope of the part of the Project includes: ¡P
slip roads to connect the CWB to the
local road system in the Wan Chai North and Causeway Bay area; ¡P
associated road lighting, road
signing, traffic control and surveillance system; and ¡P
other associated works Remarks: (a)
The scope of part the Project does not
include (i) the tunnel structure works of the CWB within
Central Reclamation Phase III (CRIII) area in Central waterfront area; (ii) the
permanent and temporary reclamation and associated dredging works related to
the CWB construction; and (iii) the Road P2 and other roads which are
classified as primary/district distributor roads in Wan Chai waterfront area
near Hong Kong Convention and Exhibition Centre (referred to as ¡§DP2¡¨ in the
WDII&CWB EIA Report (Register No. AEIAR-125/2008) ¸Ó³¡¤À¤uµ{¶µ¥Øªº½d³ò¥]¬A: ¡P
³s±µ¥D·F¹D»PÆW¥J¥_©M»ÉÆrÆW¦a°Ï²{¦³¹D¸ôªº³s±µ¹D; ¡P
¬ÛÃöªº¹D¸ô·Ó©ú¡B¹D¸ô¼Ð»x©M¥æ³qºÞ¨î¤ÎºÊ¹î¨t²Î; ¤Î ¡P
¨ä¥L¬ÛÃö¤uµ{ ³Æµù: (a) ¥»³\¥iÃÒ¤£¥]¬A: (i) ¤¤ÀôÆW¥J¶¹D¦ì©ó¤¤Àô¶ñ®ü²Ä¤T´Á¦a°Ï¤ºªºÀG¹Dµ²ºc«Ø³y¤uµ{¡B(ii)
¤¤ÀôÆW¥J¶¹D¬ÛÃöªº¥Ã¤[¤ÎÁ{®É¶ñ®ü¤uµ{(¥]¬A¬ÛÁp«õªd¤uµ{)¤Î(iii) ¦bWDII&CWBÀôµû³ø§i¤¤´£¤Îªº«ü©w¤uµ{¶µ¥ØDP2¡A¦ì©óÆW¥J®ü®Ç¦a°Ï¡Aªñ»´ä·|ij®iÄý¤¤¤ßªºP2¸ô©M¨ä¥L¤ÀÃþ¬°¥Dn·F¹D©Î¦a°Ï·F¹Dªº¹D¸ô |
1. General
Conditions
1.1
The
Permit Holder and any person working on the part of the Project shall comply
with all conditions set out in this Permit. Any non-compliance by any person
may constitute a contravention of the Environmental Impact Assessment Ordinance
(EIAO) (Cap.499) and may become the subject of appropriate action being taken
under the Ordinance.
1.2
The Permit Holder shall ensure full
compliance with all legislation from time to time in force including, without
limitation to, the Noise Control Ordinance (Cap.400), Air Pollution Control
Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Dumping at
Sea Ordinance (Cap.466) , and Waste Disposal Ordinance
(Cap. 354). This Permit does not of itself constitute any ground of defense
against any proceedings instituted under any legislation or imply any approval
under any legislation.
1.3
The Permit Holder shall make copies of
this Permit together with all documents referred to in this Permit and the
documents referred to in Part A of this Permit
readily available at all times for inspection by the Director or his authorized
officers at all sites covered by this Permit. Any reference to the Permit shall
include all documents referred to in the Permit and also the relevant documents
in the Register.
1.4
The Permit Holder shall give a copy of
this Permit to the person(s) in charge of the site(s) and ensure that such
person(s) fully understands all conditions and all requirements incorporated by
the Permit. The site(s) refers to site(s) of construction of the part of the Project
and shall mean the same hereafter.
1.5
The Permit Holder shall display
conspicuously a copy of this Permit on the construction site(s) at all
vehicular site entrances/exits or at a convenient location for public¡¦s
information at all times. The Permit Holder shall ensure that the most updated
information about this Permit, including any amended Permit, is displayed at
such locations. If the Permit Holder surrenders a part or the whole of this
Permit, the notice he sends to the Director shall also be displayed at the same
locations as the original Permit. The suspended, varied or cancelled Permit
shall be removed from display at the construction site(s).
1.6
The Permit Holder shall construct the
part of the Project in accordance with the project description in Part B of this Permit.
1.7 The Permit Holder shall ensure that the part of the Project is designed and constructed in accordance with the relevant information and recommendations described in the approved CWB&IECL EIA Report (Register No. AEIAR-041/2001), the approved WDII&CWB EIA Report (Register No. AEIAR-125/2008), the approved CRIII EIA Report (Register No. AEIAR-040/2001), the application documents for environmental permits and other relevant documents in the Register, and the information or mitigation measures described in this Permit, and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the part of the Project. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit.
1.8
All deposited submissions, as required
under this Permit, shall be rectified and resubmitted in accordance with the
comments, if any, made by the Director within one month of the receipt of the
Director¡¦s comments or otherwise specified by the Director.
1.9
All submissions approved by the
Director, all submissions deposited without comments by the Director, or all
submissions rectified in accordance with comments by the Director under this
Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall
be approved by the Director in writing or as prescribed in the relevant permit
conditions. Any non-compliance with the submissions may constitute a
contravention of the Environmental Impact Assessment Ordinance (Cap.499). All
submissions or any variation of the submissions shall be certified by the
Environmental Team (ET) Leader and verified by the Independent Environmental
Checker (IEC) referred to in Conditions 2.1 and 2.2 below before submitting to the Director under this
Permit.
1.10
The Permit Holder shall release all finalised submissions, as required under this Permit, to
the public by depositing copies in the Environmental Impact Assessment
Ordinance Register Office, or in any other places, or any internet websites as
specified by the Director, or by any other means as specified by the Director
for public inspection. For this purpose, the Permit Holder shall provide
sufficient copies of the submissions.
1.11
All
submissions to the Director required under this Permit shall be delivered
either in person or by registered mail to the Environmental Impact Assessment
Ordinance Register Office (currently at 27/F, Southorn
Centre, 130 Hennessy Road, Wanchai, Hong Kong).
Electronic copies of all finalised submissions
required under this Permit shall be prepared in Hyper Text Markup Language
(HTML) (version 4.0 or later) and in Portable Document Format (PDF version 1.3
or later), unless otherwise agreed by the Director and shall be submitted at
the same time as the hard copies.
Special Conditions
Submissions or Measures to be
implemented before Construction of the Project
Employment of Environmental Monitoring and
Audit Personnel
2.1 An Environmental Team (ET) shall be established by the Permit Holder no later than one month before the commencement of construction of the part of the Project. The ET shall not be in any way an associated body of the Contractor or the Independent Environmental Checker (IEC) for the part of the Project. The ET shall be headed by an ET Leader. The ET Leader shall be a person who has at least 7 years of experience in environmental monitoring and auditing (EM&A) or environmental management. The ET and the ET Leader shall be responsible for the implementation of the EM&A programme in accordance with the EM&A requirements as contained in the updated EM&A Manual of the part of the Project. The ET Leader shall keep a contemporaneous log-book of each and every instance or circumstance or change of circumstances, which may affect the compliance with the recommendations of the EIA Report and this Permit. The ET Leader shall notify the IEC within one working day of the occurrence of any such instance or circumstance or change of circumstances. The ET Leader¡¦s log-book shall be kept readily available for inspection by all persons assisting in supervision of the implementation of the recommendations of the EIA Report and this Permit or by the Director or his authorised officers. Failure to maintain records in the log-book, failure to discharge the duties of the ET Leader as defined in the updated EM&A Manual of the part of the Project or failure to comply with this Condition would entitle the Director to require the Permit Holder by notice in writing to replace the ET Leader. Failure by the Permit Holder to make replacement, or further failure to keep contemporaneous records in the log-book despite the employment of a new ET Leader may render the Permit liable to suspension, cancellation or variation.
2.2 An IEC shall be
employed by the Permit Holder no later than one month before commencement of
construction of the part of the Project.
The IEC shall not be in any way an associated body of the Contractor or
the ET for the part of the Project.
The IEC shall be a person who has at least 7 years of experience in
EM&A or environmental management.
The IEC shall be responsible for duties defined in the updated EM&A
Manual and shall audit the overall EM&A performance, including the
implementation of all environmental mitigation measures, submissions required
in the updated EM&A Manual, and any other submissions required under this
Permit. In addition, the IEC shall
be responsible for verifying the environmental acceptability of permanent and
temporary works, relevant design plans and submissions under this Permit. The IEC shall verify the log-book(s)
mentioned in Condition 2.1 of this Permit. The IEC shall notify the Director by
fax, within one working day of receipt of notification from the ET Leader of
each and every occurrence, change of circumstances or non-compliance with the
EIA Report and this Permit, which might affect the monitoring or control of
adverse environmental impacts from the part of the Project. In the case where the IEC fails to so
notify the Director of the same, fails to discharge the
duties of the IEC as defined in the updated EM&A Manual or fails to comply
with this Condition, the Director may require the Permit Holder by notice in
writing to replace the IEC. Failure
to replace the IEC as directed or further failure to so notify the Director
despite employment of a new IEC may render the Permit liable to suspension,
cancellation or variation.
Notification by the Permit Holder is the same as notification by the IEC
for the purpose of this Condition.
Environmental Project Committee
2.3 To oversee and facilitate effective control of the construction of the part of the Project and concurrent works under the entire Wan Chai Development Phase II (WDII) and Central ¡V Wan Chai Bypass (CWB) (hereafter referred to as the whole Project), the Permit Holder shall take part as a member of the Environmental Project Committee (ENPC) being set up for the whole project (see note 8).
The ENPC shall make recommendation
to enhance the monitoring and audit of the environmental performance of the
whole project and other relevant nearby projects on top of requirements as set
out in Conditions 3.1 to 4.2 of this Permit or corresponding requirements set
out under subsequent Environmental Permits issued for the whole project and
other relevant nearby projects (see notes 7 & 8).
Measures to Mitigate
Construction Noise Impact
2.4 To mitigate construction noise impact, at least two weeks prior to the commencement of construction of the corresponding component(s) of the part of the Project, four hard copies and one electronic copy of the construction noise management plan shall be deposited with the Director. The construction noise management plan shall consist of layout plan(s) in the scale of 1:1,000 or other appropriate scale and explanatory statement(s) showing the noise mitigation measures to include the use of movable/temporary noise barriers, the use of quiet powered mechanical equipment and the adoption of multiple-phase construction schedules, where appropriate. The submission(s) shall be certified by the ET Leader and verified by the IEC as conforming to the relevant information and recommendations contained in the approved CWB&IECL EIA Report (Register No. AEIAR-041/2001) and the WDII&CWB EIA Report (Register No. AEIAR-125/2008) before deposit with the Director. All measures recommended in the finalised submission(s) under this Condition shall be fully and properly implemented. Measures covered by other pollution control Ordinances shall not be included in this construction noise management plan (see note 8).
Measures to
Mitigate Landscape and Visual Impact
2.5 To reduce the
landscape and visual impact during construction stage of the part of the
Project, the Permit Holder shall implement a series of landscape and visual
mitigation measures. The Permit
Holder shall, at least one month before the commencement of corresponding parts
of landscape works of the part of the Project, deposit with the Director four
hard copies and one electronic copy of landscape plan(s). The landscape plan(s) shall show the
design details, locations, implementation programme, maintenance and management
schedules, and drawings in the scale of 1:1,000 or other appropriate scale of
the landscape and visual mitigation measures of the part of the Project. Before
submission to the Director, the landscape plan(s) shall be certified by the ET
Leader and verified by the IEC as conforming to the relevant information and
recommendations contained in the approved CWB&IECL EIA Report (Register No.
AEIAR-041/2001) and the WDII&CWB EIA Report (Register No. AEIAR-125/2008). All
measures recommended in the finalised submission(s) under this Condition shall
be fully and properly implemented.
3
Environmental Monitoring and Audit Requirements
3.1
The EM&A programme shall be implemented in accordance with the
procedures and requirements as set out in the updated EM&A Manual. Any major changes to the programme shall
be justified by the ET Leader and verified by the IEC as conforming to the
information and requirements contained in the updated EM&A Manual before
submission to the Director for approval.
The EM&A programme shall include, among other items, the air quality
and noise monitoring and audit details to cover the different construction
phases.
(a)
conducting impact monitoring;
(b)
carrying out remedial actions described
in Event/Action Plans of the updated EM&A Manual in accordance with the
time frames set out in Event/Action Plans, or as agreed by the Director, in
case where specified criteria in the updated EM&A Manual of this Permit are
exceeded; and
(c)
logging and keeping records of details
of (a) to (c) above for all parameters within 3 working days of collection of
data or completion of remedial action(s), for the purpose of preparing and
submitting the monthly EM&A Reports and to make available for inspection on
site.
3.3
Four hard copies and one electronic
copy of monthly EM&A Report shall be submitted to the Director within 10
working days after the end of each reporting month. The EM&A Reports shall
include a summary of all non-compliance (exceedances)
of the environmental quality performance limits (Action and Limit Levels). In
compiling this monthly EM&A Report, the Permit Holder shall address all
relevant cumulative construction impacts due to concurrent activities of the
concurrent projects including the Central Reclamation Phase III and the Wan
Chai Development Phase II projects. The submissions shall be verified by the
IEC. Additional copies of the submission shall be provided to the Director upon
request by the Director.
3.4 All environmental monitoring and audit data submitted under this Permit shall be true, valid and correct.
4
Electronic Reporting
of EM&A Information
4.1 To facilitate public inspection of the regular EM&A Reports via the EIAO Internet Website and at the EIAO Register Office, electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 1.3 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hardcopies as described in Conditions 0.3 of this Permit. For the HTML version, a content page capable of providing hyperlink to each section and sub-section of these Reports shall be included in the beginning of the document. Hyperlinks to all figures, drawings and tables in these Reports shall be provided in the main text from where the respective references are made. All graphics in these Reports shall be in interlaced GIF format unless otherwise agreed by the Director. The content of the electronic copies of these Reports must be the same as the hardcopies.
4.2 All environmental monitoring data described in Condition 4.1 above shall be made available to the public via a dedicated web site being set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two weeks after the relevant environmental monitoring data are collected or become available, unless otherwise agreed with the Director.
Notes :
1. This Permit consists of
three parts, namely, PART A (Main Permit), PART
B (Description of Designated Project) and PART C (Permit
Conditions). Any person relying on this permit should obtain independent
legal advice on the legal implications under the Ordinance, and the following
notes are for general information only.
2. If there is a breach of any
conditions of this Permit, the Director or his authorised officer may, with the
consent of the Secretary for the Environment, order the cessation of associated
work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorised
officer.
3. The Permit Holder may apply
under Section 13 of the Ordinance to the Director for a variation of the
conditions of this Permit. The Permit Holder shall replace the original
permit displayed on the
construction site by the amended permit.
4.
A person who assumes the responsibility for the whole or a part of the
designated project(s) may, before he assumes responsibility of the designated
project(s), apply under Section 12 of the
Ordinance to the Director for a further environmental permit.
5.
Under Section 14 of the Ordinance, the Director may with the consent of
the Secretary for the Environment, suspend, vary or cancel this Permit.
The suspended, varied or cancelled Permit shall be removed from display at the
construction site.
6.
If this Permit is cancelled or surrendered during construction of the
Project, another environmental permit must be obtained under the Ordinance
before the Project could be continued. It is an offence under section
26(1) of the Ordinance to construct or operate a designated project listed in
Part I of schedule 2 of the Ordinance without a valid
environmental permit.
7.
Highways Department (HyD), the Holder of
Environmental Permit (EP) No. EP-364/2009, is required under EP-364/2009, or
any subsequent EP amended by the Director under the Ordinance:
(i)to
establish an Environmental Team (ET) which shall be headed by an ET Leader;
(ii)to employ an Independent Environmental
Checker (IEC);
(iii)to liaise with the Holder of Environmental
Permit No. EP-356/2009 on to jointly set up an Environmental Project Committee
(ENPC); and
(iv)to liaise with the Holder of Environmental
Permit No. EP-356/2009 to jointly set up a Community Liaison Group (CLG),
for the CWB Project.
8.
HyD, the Holder of EP-364/2009 is required under
EP-364/2009, or any subsequent EP amended by the Director under the Ordinance:
(i)to
notify the Director in writing the commencement date of construction of the CWB
Project;
(ii)to notify the Director the date of setting
up the ENPC;
(iii)to notify the Director the date of setting
up the CLG;
(iv)to submit to the Director for approval the
updated Environmental Monitoring and Audit Manual (updated EM&A Manual);
(v)to inform the Director in writing the
management organization of the main construction companies and/or any form of
joint ventures associated with the construction of the CWB Project;
(vi)to deposit with the Director a detailed
works schedule and location plans;
(vii)to deposit with the Director a
construction noise management plan;
(viii)to deposit with the Director an
operational air quality management plan;
(ix)to deposit with the Director landscape
plan(s);
(x)to deposit with the Director an additional
mitigation plan for Slip Road 8;
(xi)to submit to the Director the Baseline
Monitoring Report; and
(xii) to submit to the Director the monthly
EM&A Reports,
for the CWB Project.
All submissions or any variation
of the submission shall be certified by the ET Leader(s) and verified by the
IEC before submitting the Director.
9.
HyD, the Holder of Environmental Permit
EP-364/2009, is required under EP-364/2009, or any subsequent EP amended by the
Director under the Ordinance:
(i) to implement the
proposed construction works of CWB including its Road Tunnel and Slip Roads,
ventilation buildings and vent shaft(s) at the location shown in Figure
1 of EP-364/2009 together with the relevant environmental mitigation measures;
and
(ii) to set up a dedicated web site and notify
the Director in writing the Internet address where the environmental monitoring
and project data is to be placed,
for the CWB Project.
10.
Any person who constructs the Project contrary to the conditions in the
Permit, and is convicted of an offence under the Ordinance, is liable:-
(i)
on a first conviction on
indictment to a fine of $ 2 million and to imprisonment for 6 months;
(ii)
on a second or subsequent
conviction on indictment to a fine of $ 5 million and to imprisonment for 2
years;
(iii)
on a first summary conviction
to a fine at level 6 and to imprisonment for 6 months;
(iv)
on a second or subsequent
summary conviction to a fine of $1 million and to imprisonment for 1 year; and
(v)
in any case where the offence is of a continuing nature, the court or
magistrate may impose a fine of $ 10,000 for each day on which he is satisfied
the offence continued.
11.
The Permit Holder may appeal against any condition of this Permit under
Section 17 of the Ordinance within 30 days of receipt of this Permit.
12.
The Notes are for general reference only and that the Permit Holder
should refer to the EIA Ordinance for details and seek independent legal advice.