Table 2b Noise Mitigation Measures to be Implemented Before Commencement of Population Intake at the Planned Developments at Lam Tei |
|||||
Mitigation
Measure |
Location |
Type |
Approx. Length |
Chainage No. |
Remarks |
Cantilever Barrier DBL8 |
Ramp B of Lam Tei Interchange connecting DBL mainline (NB) |
Cantilever barrier (5.5m vertical plus 2.2m extension) |
519m |
4+766~1+168 |
To protect F1A planned development area |
Cantilever Barrier DBL11M1 |
Mainline of DBL (central
divider) in the north of Ramp D of Lam Tei
Interchange |
Cantilever barrier (5.5m
vertical plus 2.2m extension) |
365m |
4+766~5+100 |
To protect F1A planned development area |
Cantilever Barrier LT10 |
Ramp G of Lam Tei Interchange |
Cantilever barrier (5.5m
vertical plus 2.2m extension) |
250m |
0+150~0+400 |
To protect F1B planned development area |
Barrier YLH14 |
Ramp connecting to Yuen Long Highway (EB) – south of Lam Tei Interchange |
6m vertical barrier |
82m |
0+080~0+162 |