Table 1 – Schedule of Recommended Noise Mitigation Measures
to be implemented before commencement of operation of the Project (to be read
in conjunction with Figures 2,3,4,5 and 7 attached to this Permit)
(Extracted from Table 8-1 of the
Environmental Review attached to the Environmental Permit Application No. :
AEP-135/2002)
Mitigation Measures |
Location |
Low noise road surfacing (LNRS) |
On Trunk Road T3 (see Figure 2) |
A 5.8m high with 3m cantilever
of approx. 55m long (see segment no. 1 in Figure 3), A 5.8m high with 5m cantilever
of approx. 90m long (see segment no. 2 in Figure 3), A 5.8m high with 3m cantilever
of approx. 95m long (see segment no. 3 in Figure 3), A 3m high vertical barrier of
approx. 130m long (see segment no. 4 in Figure 3), and A 5.8m high with 3m cantilever
of approx. 660m long (see segment no. 5 in Figure 3). |
near |
A 4m high vertical barrier of
approx. 150m long (see segment no. 6 in Figure 3), and A 3.5m high vertical barrier of
approx. 155m long (segment no. 7 in Figure 3). |
near |
A 5.8m high with 2m cantilever
of approx. 100m long (see segment no. 8 in Figure 3), A 5.8m high with 1.5m
cantilever of approx. 255m long (see segment no. 9 in Figure 3), and A 2.5m high vertical barrier of
approx. 80m long (see segment no. 13 in Figure 3). |
near Sha Tin Clinic, |
A 5m high vertical barrier of
approx. 120m long (see segment no. 10 in Figure 3), A 4m high vertical barrier of
approx. 150m long (see segment no. 11 in Figure 3), A 5m high vertical barrier of
approx. 275m long (see segment no. 12 in Figure 3), A 5m high vertical barrier of
approx. 145m long (see segment no. 14 in Figure 3), A 6m high vertical barrier of
approx. 105m long (see segment no. 15 in Figure 3), and A 5m high vertical barrier of
approx. 215m long (see segment no. 16 in Figure 3) |
near |
A 3m high vertical barrier of
approx. 330m long (see segment no. 17 in Figure 3), A partial enclosure of approx.
235m long (see segment no. 18 in Figure 4), A 5.8m high with 5m cantilever
of approx. 150m long (see segment no. 19 in Figure 4), A 5.8m high vertical barrier of
approx. 15m long (see segment no. 20 in Figure 4), A 5.8m high with 5m cantilever
of approx. 85m long (see segment no. 21 in Figure 4), A 3m high vertical barrier of
approx. 120m long (see segment no. 22 in Figure 4), A 5.5m high vertical barrier of
approx. 85m long (see segment no. 23 in Figure 4), A 5.8m high with 1.5m
cantilever of approx. 215m long (see segment no. 24 in Figure 4), A full enclosure of approx.
130m long (see segment no. 25 in Figure 4), A partial enclosure of approx.
190m long (see segment no. 26 in Figure 4), A 5m high vertical barrier of
approx. 75m long (see segment no. 27 in Figure 4), and A 5.8m high with 5m cantilever
of approx. 145m long (see segment no. 28 in Figure 4). |
near |
A 4m high vertical barrier of
approx. 75m long (see segment no. 29 in Figure 4), A 2m high vertical barrier of
approx. 40m long (see segment no. 49 in Figure 4), A 2m high vertical barrier of
approx. 50m long (see segment no. 50 in Figure 4), and A 4.5m high vertical barrier of
approx. 50m long (see segment no. 54 in Figure 4). |
near |
A 5m high vertical barrier of
approx. 35m long (see segment no. 30 in Figure 4), and A 5.8m high with 1.5m
cantilever of approx. 350m long (see segment no. 31 in Figure 4). |
near |
A 5.8m high with 3m cantilever
of approx. 350m long (see segment no. 32 in Figure 4), A partial enclosure of approx.
295m long (see segment no. 33 in Figures 4 and 5), A partial enclosure of approx.
125m long (see segment no. 34 in Figures 4 and 5), A 5.8m high with 1.5m
cantilever of approx. 120m long (see segment no. 35 in Figures 4 and 5), A 5.5m high vertical barrier of
approx. 75m long (see segment no. 36 in Figure 5), and A 5.8m high with 5m cantilever
of approx. 115m long (see segment no. 37 in Figure 5). |
near |
A partial enclosure of approx.
50m long (see segment no. 38 in Figure 5), A 5.8m high with 5m cantilever
of approx. 170m long (see segment no. 39 in Figure 5), A 4m high vertical barrier of
approx. 137m long (see segment no. 40 in Figure 5 & Figure 7), A 3m high vertical barrier of
approx. 50m long (see segment no. 41 in Figure 5), A 4m high vertical barrier of
approx. 80m long (see segment no. 42 in Figure 5), A 5.8m high with 1.5m
cantilever of approx. 70m long (see segment no. 52 in Figure 5), and A 5m high vertical barrier of
approx. 35m long (see segment no. 53 in Figure 5). |
near Glamour Garden, Grandeur
Garden, Holford Garden, Lau Pak Lok Secondary School, Cheng Wing Gee College
and planned development at Tai Wai Depot |
A 5m high vertical barrier of
approx. 120m long (see segment no. 43 in Figure 5), A 6m high vertical barrier of
approx. 135m long (see segment no. 44 in Figure 5), and A full enclosure of approx. 85m
long (see segment no. 45 in Figure 5) |
near planned development at
Vista Do Vale, Area 37 and Area 38 |
A 5m high vertical barrier of
approx. 55m long (see segment no. 48 in Figure 4). |
near planned development at Mui
Lee |