Table 3 – Locations and extent of noise barriers where absorptive panels as originally provided to a height of 2.5m above the road level are replaced by transparent reflective panels (to be read in conjunction with Figures 8,9,10,11,12 and 13 attached to this Permit)

(Extracted from the Application VEP-169/2005)

 

Segment no. in this Permit

Chainage

Length (m)

Height, h(m)

Relevant Figures

21

From CH 0 to CH +87

87

1.7h for 87m long

see Figures 8 and 9 for details

 

20

From CH+79.237 to CH +96.237

17

2.5h for 17m long

see Figures 8 and 9 for details

 

48

From CH+246.31 to CH +250.31

4

2.5h for 4m long

see Figures 10 and 11 for details

 

31

From CH+496.4 to CH +515.3 and

From CH+517.3 to CH +528.3

30

2.5h for 19m long

1.7h for 11m long

see Figures 12 and 13 for details