Environmental Permit No. EP-342/2009/A
環境許可證編號EP-342/2009/A

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

SECTIONS 10 AND 13

環境影響評估條例

(499)

10條及13

 

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE

A DESIGNATED PROJECT

建造及營辦指定工程項目的環境許可證

 

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) granted the Environmental Permit EP-342/2009 to HIGHWAYS DEPARTMENT (hereinafter referred to as the “Permit Holder”) on 15 May 2009.  Pursuant to Section 13 of the Ordinance, the Director amends the Environmental Permit (No. EP-342/2009) based on the Application No. VEP-301/2009.  The amendments, described below, are incorporated into the Environmental Permit (No. EP-342/2009/A).  This Environmental Permit as amended is for the construction and operation of the designated project described in Part B subject to the conditions specified and attached to Part C of this Permit.  The issue of this environmental permit is based on the documents, approvals or permissions described below:

 

根據環境影響評估條例(環評條例) 10條的規定,環境保護署署長(署長)2009515將環境許可證(編號EP-342/2009)批予路政署 (下稱許可證持有人”)根據環評條例第13條的規定,署長因應更改環境許可證的申請編號VEP-301/2009 修訂環境許可證。以下修訂已包含在本環境許可證內(編號EP-342/2009/A)。本經修訂的環境許可證,適用於建造及營辦本許可證B所說明的指定工程項目,但須遵守C所列明的條件。本環境許可證是依據下列文件、批准或許可而簽發﹕

 

Application No.

申請書編號

VEP-301/2009

 

Document in the Register:

登記冊上的文件

 

(1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

 

 

 

 

 

 

(3)

 

 

 

 

 

(4)

 

 

 

 

 

(5)

Traffic Improvements to Tuen Mun Road Town Centre Section –

Environmental Impact Assessment Report (December 2008)

[Hereinafter referred to as the “EIA Report”]

EIA Executive Summary (December 2008)

[Hereinafter referred to as the “EIA Executive Summary”]

  Environmental Monitoring and Audit Manual (December 2008)

[Hereinafter referred to as the “EM&A Manual”]

(Register No. AEIAR-128/2009)

屯門公路市中心段交通改善工程環境影響評估報告(200812) [下稱“環評報告”]

環境影響評估報告行政摘要 (200812) [下稱“環評摘要”]

環境監察及審核手冊 (200812) [下稱 環監手冊”]

(登記冊檔號: AEIAR-128/2009)

 

 

The Director’s letter of approval of the EIA report dated 17 February 2009 (Reference: (37) in Ax (5) to EP2/G/A/61 Pt.2)

署長於2009 217發出批准環評報告的信件 (檔案編號:(37) in Ax (5) to EP2/G/A/61 Pt.2)

 

 

Application for environmental permit submitted by the Permit Holder on 20 April 2009 (Application No. AEP-342/2009)

許可證持有人於2009420日提交的環境許可證申請 (申請書編號:AEP- 342/2009)

 

 

Environmental Permit issued on 15 May 2009 (Permit No. EP-342/2009)

2009515發出的環境許可證(許可證編號:EP-342/2009)

 

 

Application for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 30 September 2009 (Application No. VEP-301/2009)

許可證持有人於2009930提交的更改環境許可證申請包括所有附件(申請書編號:VEP-301/2009

 

 

Application No.

申請書編號

Date of Application

申請日期

List of Amendments incorporated into this Environmental Permit

已包含在本環境許可證內的修訂項目

Date of Amendments

修訂日期

VEP-301/2009

30 September 2009

2009930

Amend Condition 2.10 in Part C

更改C條件第2.10

27 October 2009

20091027

 

 

 

 

            27 October 2009

          20091027

Date

日期

 

(Lawrence K K NGO)

Ag. Principal Environmental Protection Officer

for Director of Environmental Protection

環境保護署署長

(署理首席環境保護主任敖國強代行)


PART B (DESCRIPTION OF DESIGNATED PROJECT)

B (指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the “Permit”):

 

下列為本環境許可證(下稱許可證”)A所提的指定工程項目的說明﹕

 

Title of Designated Project

指定工程項目的名稱

Traffic Improvements to Tuen Mun Road  Town Centre Section [This designated project is hereinafter referred to as “the Project”]

屯門公路市中心交通改善工程[本指定工程項目下稱 工程項目”]

 

Nature of Designated Project
指定工程項目的性質

A major improvement to an existing trunk road and construction of a district distributor road

對現有主要幹路作重大改善工程及建造一條地區幹路

 

Location of Designated Project

指定工程項目的地點

Located within the Tuen Mun Road Town Centre Section. The location of the Project is shown in Figure 1 attached to this Permit.

本工程位於屯門公路市心中心段。工程項目的位置載於本許可證夾附的1

Scale and Scope of Designated Project

指定工程項目的規模和範圍

 

The project is to widen about 1.5km long of Tuen Mun Road from  Yan Oi Square to Wong Chu Road Interchange from dual-two to dual-three carriageway and to construct of 450m long one-lane flyover from Tsing Hoi Circuit to Tuen Mun Road Kowloon bound.

本工程將擴闊由仁愛堂至皇珠路交匯處之間長約1.5公里的屯門公路及及建造一條約450長的單線行車天橋以接駁青海圍及屯門公路往九龍方向的行車道。

 

 

               

 


PART C (PERMIT CONDITIONS)

 

1.         General Conditions

 

1.1       The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of appropriate action being taken under the EIAO.

 

1.2       The Permit Holder shall ensure full compliance with all legislation from time to time in force including, without limitation to, the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358), Waste Disposal Ordinance (Cap. 354) and Dumping at Sea Ordinance (Cap. 466). This Permit does not of itself constitute any ground of defence against any proceedings instituted under any legislation or imply any approval under any legislation.

 

1.3       The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorised officers at all sites/offices covered by this Permit. Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register.

                             

1.4       The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in the Permit. The site(s) refers to site(s) of construction and operation of the Project and shall mean the same hereafter.

 

1.5       The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular site entrances/exits or at a convenient location for public’s information at all times. The Permit Holder shall ensure that the most updated information about the Permit, including any amended Permit, is displayed at such locations.  If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit.  The suspended, varied or cancelled Permit shall be removed from display at the Project site(s).

 

1.6       The Permit Holder shall construct and operate the Project in accordance with the project description in Part B of this Permit.

 

1.7       The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and all recommendations described in the EIA Report (Register No. AEIAR – 128/2009); the application documents including all attachments (Application No. AEP-342/2009), other relevant documents in the Register; and the information or mitigation measures described in this Permit, and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this permit, and mitigation measures to be recommended under ongoing surveillance and monitoring activities during all stages of the Project. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implement unless expressly excluded or impliedly amended in this Permit.

 

1.8       All deposited submissions, as required under this Permit, shall be rectified and resubmitted in accordance with the comments, if any, made by the Director within one month of the receipt of the Director’s comments or otherwise as specified by the Director.

 

1.9       All submissions approved by the Director, all submissions deposited without comments by the Director, or all submissions rectified in accordance with comments by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap. 499).  All submissions or any variation of the submissions shall be certified by the Environmental Team (ET) Leader and verified by the Independent Environmental Checker (IEC) referred to Conditions 2.1 and 2.2 below, before submitting to the Director under the Permit.

 

1.10     The Permit Holder shall release all finalized submissions as required under this Permit, to the public by depositing copies in the EIAO Register Office, or in any other places, or any internet websites as specified by the Director, or by any other means as specified by the Director for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of the submissions.

 

1.11     All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalized submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 1.3 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

 

1.12     The Permit Holder shall notify the Director in writing the commencement date of construction of the Project at least two weeks prior to the commencement of construction of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the construction.

 

1.13     For the purpose of this Permit, “commencement of construction” does not include works related to site clearance and preparation, or other works as agreed by the Director.

 

2.                  Specific Conditions

 

Employment of Environmental Monitoring and Audit (EM&A) Personnel

 

2.1       An Environmental Team (ET) shall be established by the Permit Holder no later than two weeks before the commencement of construction of the Project.  The ET shall not be in any way an associated body of the Contractor or the Independent Environmental Checker (IEC) for the Project.  The ET shall be headed by an ET Leader. The ET Leader shall be a person who has at least 7 years of experience in environmental monitoring and auditing (EM&A) or environmental management.  The ET and the ET Leader shall be responsible for the implementation of the EM&A programme in accordance with the EM&A requirements as contained in the EM&A Manual of the Project.  The ET Leader shall keep a contemporaneous log-book of each and every instance or circumstance or change of circumstances, which may affect the compliance with the recommendations of the EIA Report (Register No.: AEIAR-128/2009) and this Permit.  The ET Leader shall notify the IEC within one working day of the occurrence of any such instance or circumstance or change of circumstances.  The ET Leader’s log-book shall be kept readily available for inspection by all persons assisting in supervision of the implementation of the recommendations of the EIA Report (Register No.: AEIAR-128/2009) and this Permit or by the Director or his authorized officers.  Failure to maintain records in the log-book, failure to discharge the duties of the ET Leader as defined in the EM&A Manual or failure to comply with this Condition would entitle the Director to require the Permit Holder by notice in writing to replace the ET Leader.  Failure by the Permit Holder to make replacement, or further failure to keep contemporaneous records in the log-book despite the employment of a new ET Leader may render the Permit liable to suspension, cancellation or variation.

 

2.2       An IEC shall be employed by the Permit Holder no later than two weeks before the commencement of construction of the Project.  The IEC shall not be in any way an associated body of the Contractor or the ET for the Project.  The IEC shall be a person who has at least 7 years of experience in EM&A or environmental management.  The IEC shall be responsible for duties defined in the EM&A Manual and shall audit the overall EM&A performance, including the implementation of all environmental mitigation measures, submissions required in the EM&A Manual, and any other submissions required under this Permit.  In addition, the IEC shall be responsible for verifying the environmental acceptability of permanent and temporary works, relevant design plans and submissions under this Permit.  The IEC shall verify the log-book(s) mentioned in Condition 2.1 of this Permit.  The IEC shall notify the Director by fax, within one working day of receipt of notification from the ET Leader of each and every change of circumstances or non-compliance with the recommendations of the EIA Report (Register No.: AEIAR-128/2009) and this Permit, which might affect the monitoring or control of adverse environmental impacts from the Project.  In case the IEC fails to so notify the Director of the same, fails to discharge the duties of the IEC as defined in the EM&A Manual or fails to comply with this Condition, the Director may require the Permit Holder by notice in writing to replace the IEC.  Failure to replace the IEC as directed or further failure to so notify the Director despite employment of a new IEC may render the Permit liable to suspension, cancellation or variation.  Notification by the Permit Holder is the same as notification by the IEC for the purpose of this Condition.

 

Submissions after Commencement of Construction of the Project

 

2.3       The Permit Holder shall, within one month after the commencement of construction of the Project, inform the Director in writing the management organization of the main construction companies and/or any form of joint ventures appointed for the Project. The information, to be submitted, shall include at least an organization chart, names of responsible persons and their contact details.

 

 

 

Measures to Mitigate Air Quality Impacts during Construction of the Project

 

2.4       Every vehicle shall be washed to remove dusty materials from its body and wheels before leaving the construction site

 

2.5       All dusty materials shall be sprayed with water prior to any loading, unloading and transfer operations.

 

Measures to Mitigate Water Quality Impacts during Construction of the Project

 

2.6       Silt removal facilities shall be provided to remove silt particles from runoff on site.

 

2.7       On-site storage of construction materials or construction wastes shall be covered with tarpaulin or similar materials during rainstorms.

 

2.8       Debris and refuse on site shall be properly collected, handled and disposed of.

 

2.9       Construction work force sewage shall be handled by temporary sanitary facilities or portable chemical toilets.

 

Measures to Mitigate Traffic Noise Impact

 

2.10     To mitigate the traffic noise impact arising from the Project, noise mitigation measures shall be implemented before commencement of operation of the Project in accordance with Table 1 and Figure 2 to Figure 16 attached to this Permit. Each noise barrier or enclosure shall be a continuous structure with no gap or opening except where an access road or an emergency exit is required.  The noise mitigation measures shall be properly maintained during operation of the Project.

 

Measures to Mitigate Water Quality Impacts during Operation of the Project

 

2.11     The road drainage shall be directed through silt traps in gully inlets to remove silt and grit before entering the public storm water drainage system.

 

2.12     The silt traps shall be properly and regularly cleaned and maintained to ensure efficient operation at all times.

 

Submission of Landscape Plan

                                                                    

2.13     At least one month before the commencement of the construction of the Project, 3 hard copies and one electronic copy of landscape plan shall be deposited with the Director. The landscape plan, with drawings in the scale of 1:1000 or other appropriate scales showing the landscape and visual mitigation measures of the Project, shall include:

 

(i)                  locations, size, number and plant species of trees to be transplanted and their final transplanting locations;

            (ii)       locations, size, number and plant species of trees to be felled ;

            (iii)      locations, size, number and plant species of compensatory plantings; and

(iv)              architectural and chromatic treatment of the noise barriers and enclosures.

 

           Before the submission to the Director, the landscape plan shall be certified by the ET Leader and verified by the IEC as conforming to the information, requirements and recommendations contained in the approved EIA report. (Register No.: AEIAR-128/2009).

 

            All landscape and visual mitigation measures shall be properly implemented and maintained for the Project in accordance with the deposited landscape plan.

 

 

3.         Environmental Monitoring and Audit Requirements

 

3.1       All measures recommended in the EIA Report (Register No. AEIAR-128/2009) and the EM&A Manual shall be fully and properly implemented in accordance with the requirements and time schedule(s) set out in the EM&A Manual and any subsequent amendments approved by the Director.

 

3.2       Any changes to the monitoring and audit requirements shall be justified by the ET Leader and verified by the IEC as conforming to the information and requirements set out in the EM&A Manual, and shall be submitted to the Director for approval.

 

3.3       Samples, measurements and necessary remedial actions shall be taken in accordance with the requirements of the EM&A Manual by:

 

(i)                  conducting baseline environmental monitoring;

(ii)                 conducting impact monitoring;

(iii)               carrying out remedial actions described in the Event/Action Plans of the EM&A Manual in accordance with the time frame set out in the Event/Action Plans, or as agreed by the Director, in case where specified criteria in the EM&A Manual are exceeded; and

(iv)              logging and keeping records of the details of (a) and (c) above for all parameters within 3 working days of the collection of data or completion of remedial action(s), for the purpose of preparing and submitting the monthly EM&A Reports and to make available the information for inspection on site.

 

3.4       All EM&A results submitted under this Permit shall be true, valid and correct.

 

3.5      Four hard copies and one electronic copy of Baseline Monitoring Report shall be submitted to the Director at least 2 weeks before the commencement of construction of the Project.  The submissions shall be certified by the ET Leader and verified by the IEC as having complied with the requirements as set out in the EM&A Manual before submission to the Director.  Additional copies of the Baseline Monitoring Report shall be provided upon request by the Director.

 

3.6      Four hard copies and one electronic copy of Monthly EM&A Reports for the construction stage of the Project shall be submitted to the Director, within 2 weeks after the end of the reporting month.  The monthly EM&A Reports shall include a summary of all non-compliance (exceedances) of the environmental quality performance limits (Action and Limit Levels).  The submissions shall be certified by the ET Leader and verified by the IEC as having complied with the requirements as set out in the EM&A Manual before submission to the Director.  Additional copies of the Monthly EM&A Reports shall be provided upon request by the Director.

 

4.         Electronic Reporting of EM&A Information

 

4.1    To facilitate public inspection of the Baseline Monitoring Report and Monthly EM&A Reports via the EIAO Internet Website and at the EIAO Register Office, electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 1.3 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies as described in Conditions 3.5 and 3.6 above of this Permit.  For the HTML version, a content page capable of providing hyperlink to each section and sub-section of these Reports shall be included in the beginning of the document. Hyperlinks to all figures, drawings and tables in these Reports shall be provided in the main text from where the respective references are made.  All graphics in these Reports shall be in interlaced GIF format unless otherwise agreed by the Director.  The content of the electronic copies of these Reports must be the same as the hard copies.

 

 

 

 

Notes:

 

1.         This Permit consists of three parts, namely, Part A (Main Permit), Part B (Description of Designated Project) and Part C (Permit Conditions).  Any person relying on this permit should obtain independent legal advice on the legal implications under the EIAO, and the following notes are for general information only.

 

2.         If there is a breach of any condition of this Permit, the Director or his authorized officer may, with the consent of the Secretary for the Environment, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

 

3.         The Permit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the Project site by the amended permit.

 

4.         A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the EIAO to the Director for a further environmental permit.

 

5.         Under Section 14 of the EIAO, the Director may with the consent of the Secretary for the Environment suspend, vary or cancel this Permit.  The suspended, varied or cancelled Permit shall be removed from display at the Project site.

 

6.         If this Permit is cancelled or surrendered during construction or operation of the Project, another environmental permit must be obtained under the EIAO before the Project could be continued.  It is an offence under Section 26(1) of the EIAO to construct or operate a designated project listed in Part I of Schedule 2 of the EIAO without a valid environmental permit.

 

7.         Any person who constructs or operates the Project contrary to the conditions in the Permit, and is convicted of an offence under the EIAO, is liable:

(i)                  on a first conviction on indictment to a fine of $2 million and to   imprisonment for 6 months;

(ii)                on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years;

(iii)               on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;

(iv)              on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year; and

(v)                in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied the offence continued.

 

8.         The Permit Holder may appeal against any condition of this Permit under Section 17 of the EIAO within 30 days of receipt of this Permit.

 

9.         The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice.

 

 Environmental Permit No. EP-342/2009/A


 

Table 1: Noise Mitigation Measures to be Implemented before Operation of Project

 

(This table is to be read in conjunction with Figures 2 to 16 attached.) 

 

Legends

TMR*:Tuen Mun Road                                                                  

**: see Figure 3 attached for details of NM1 and NM2                        

***: see Figure 4 attached for details of NM4                        

@: see Figures 4 and 5 attached for details of NM8                    

@@: see Figure 6 attached for details of NM11                          

@@@: see Figure 7 attached for details of NM12 and NM15                                         

#: see Figure 8 attached for details of NM16

##: see Figure 9 attached for details of NM17 and NM18

###: see Figures 10 and 11 attached for details of NM19

^: see Figure 12 attached for details of NM21

^^: see Figures 12, 13, 14 and 15 attached for details of NM24

^^^: see Figures 13 and 15 attached for details of NM25

^^^^: see Figure 16 attached for details of NM34

 

Mitigation measures

Type

Approximate Length

Location

Semi-enclosure NM1**               

6m high semi-enclosure with 4m cantilever projecting from central divider to Yuen Long bound

104m

At Kowloon bound of TMR* in front of Rose Dale Garden

Full enclosure NM2**               

8m high full enclosure with 7m cantilever projecting from central divider to Yuen Long bound

82m

At Kowloon bound of TMR* close to Fast East Consortium Tuen Mun Central Building

Semi-enclosure NM4***                  

Portion of semi-enclosure along Kowloon bound with height increasing from 8m gradually to merge with NM8

 

Portion of semi-enclosure along Yuen Long bound with 8m height and with 6m wide roof opening

60m

Roof section projecting 4.5m from road kerb at Kowloon bound of TMR* in front of Orchid Court

 

Roof section projecting 3m from road kerb at Yuen Long bound of TMR* in front of Forward Mansion

Full enclosure NM5 

            

6m high full enclosure

48m

At slip road leaving TMR* in front of Orchid Court on Kowloon bound of TMR*

Full enclosure NM8@             

Portion of full enclosure along Kowloon bound with height increasing gradually from NM4 to 12m at Yan Ching Footbridge

 

Portion of full enclosure along Yuen Long bound with 8m height between Yan Ching Footbridge and NM4

 

Full enclosure covering both bounds of TMR* with height decreasing from 8m at Yan Ching Footbridge to 6m gradually to merge with Pui To Road

82m

At TMR* in front of Man Shing Building

Full enclosure NM9             

6m high full enclosure

73m

At TMR* in front of Tuen Mun Town Plaza Block 2

Semi-enclosure NM10                        

6m high semi-enclosure

14m

At TMR* in front of the junction of Tuen Lung Street and TMR*

Semi-enclosure NM11@@                         

6m high semi-enclosure with 4m cantilever projecting from central divider to Yuen Long bound

63m

At Kowloon bound of TMR* in front of Tuen Mun Town Plaza Block 3

Semi-enclosure NM12@@@                  

8m high semi-enclosure

 

60m

Roof sections projecting 4.5m from road kerb and projecting 4m from central divider at Kowloon bound of TMR* in front of Waldorf Garden Block 2

 

Roof section projecting 4m from road kerb and projecting 4m from central divider at Yuen Long bound of TMR* in front of Waldorf Garden Block 2

Semi-enclosure NM15@@@                       

8m high semi-enclosure at Kowloon bound and along road kerb of Yuen Long bound

100m

Roof section projecting 4.5m from road kerb at Kowloon bound of TMR* in front of Waldorf Garden Block 5

 

Semi-enclosure NM16#                     

Semi-enclosure along Kowloon bound with height increasing from 8m to merge with NM17 and with

8m high cantilever at Yuen Long bound projecting 10m from central divider

21m

At TMR* in front of New Town Mansion Block B

Semi-enclosure     NM17##                  

Semi-enclosure along Kowloon bound with height increasing gradually from NM16 to NM18 and with

8m high cantilever at Yuen Long bound projecting 10m from central divider

22m

At TMR* in front of New Town Mansion

Semi-enclosure NM18##                       

Semi-enclosure along Kowloon bound with height increasing gradually from NM17 to 12m and with 8m high cantilever at Yuen Long bound projecting 10m from central divider

26m

At TMR*in front of New Town Mansion Block A

Full enclosure NM19###

Portion of full enclosure along Kowloon bound with 8m height

 

Portion of full enclosure along Yuen Long bound with height increasing gradually from 8m at NM21 to 12m at Siu On Footbridge and increasing from 8m at Siu On Footbridge to 12m at Tuen Hing Road Bridge

175m

At TMR* in front of Siu On Court

Full enclosure NM20              

8m high full enclosure

83m

At slip road entering TMR* in front of CMA Choi Cheung Kok Secondary School

Semi-enclosure NM21^              

Portion of semi-enclosure along Kowloon bound with height increasing gradually from 8m to merge with NM24

 

Portion of semi-enclosure along Yuen Long bound with 8m height

100m

Roof section projecting 3.5m from road kerb at Kowloon bound of TMR* in front of Lee Bo Building

 

Roof sections projecting 6m from central divider and projecting 4m from road kerb of Yuen Long bound of TMR* in front of Lee Bo Building

Full enclosure NM24^^               

Portion of full enclosure along Kowloon bound with height increasing gradually from NM21 to 12m at Chi Lok Footbridge, with 8m height between Chi Lok Footbridge and NM26

 

Portion of full enclosure along Yuen Long bound with 8m height between NM21 and Chi Lok Footbridge and with height increasing from 8m at NM25 to 12m at Chi Lok Footbridge

78m

At TMR* in front of Chi Lok Fa Yuen Block 3

Semi-enclosure NM25^^^              

8m high semi-enclosure with 7m cantilever projecting from central divider to Kowloon bound

95m

At Yuen Long bound of TMR* in front of Chi Lok Fa Yuen Block 5

Barrier NM26            

5.5m high cantilevered barrier with 4m cantilever inclined at 45o

97m

At slip road leaving TMR* in front of Chi Lok Fa Yuen Block 5

Barrier NM27              

5.5m high absorptive cantilevered barrier with 4m cantilever inclined at 45o

315m

At slip road close to Hong King Garden

Semi-enclosure NM28              

6m high semi-enclosure

122m

At slip road entering TMR* in front of Lui Cheung Kwong Lutheran Primary School

Barrier NM29              

Vertical Panel

40m

Filling the gap under the slip road in front of Chi Lok Fa Yuen Block 5

Barrier NM30              

5m high absorptive vertical barrier

160m

Under the slip road in front of Tsing Wah Soccer Pitch and on road kerb of TMR*

Barrier NM31              

5.5m high absorptive cantilevered barrier with 4m cantilever inclined at 45o

91m

At Yuen Long bound of TMR* in front of Hong King Garden

Barrier NM32              

5.5m high absorptive cantilevered barrier with 4m cantilever inclined at 45o

140m

At central divider of Yuen Long bound of TMR* in front of Hong King Garden

Full enclosure NM34^^^^              

6m high full enclosure covering Kowloon bound and part of Yuen Long bound (6m cantilever projecting from central divider to Yuen Long bound) with absorptive vertical panel (facing CSBS Mrs. Aw Boon Haw Secondary School) on the central divider

114m

At Kowloon bound of TMR* in front of CSBS Mrs. Aw Boon Haw Secondary School

Full enclosure NM35              

8m high full enclosure with absorptive panel of 30m in length at central divider of TMR*

180m

At Kowloon bound of TMR* in front of Kam Fai Garden

 

ID: TMroadvep10.09

| Figure 1 | Figure 2 | Figure 3 | Figure 4 | Figure 5 | Figure 6 | Figure 7 | Figure 8 | Figure 9 | Figure 10 | Figure 11 | Figure 12 | Figure 13 | Figure 14 | Figure 15 | Figure 16 |


[ Back to First Page ] / [ Back to Main Index ]