Environmental Permit No.
EP-359/2009/A
環境許可證編號EP-359/2009/A
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTIONS 10 and 13
環境影響評估條例
(第499章)
第10條 及13條
ENVIRONMENTAL
PERMIT TO CONSTRUCT AND OPERATE
A
DESIGNATED PROJECT
建造及營辦指定工程項目的環境許可證
A部 (許可證主要部分)
Pursuant
to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the
Director of Environmental Protection (the Director) granted the environmental
permit (EP-359/2009) to the Drainage
Services Department (hereinafter referred to as the “Permit Holder”) on
12 August 2009. Pursuant to Section 13 of the EIAO, the Director amends the
environmental permit (EP-359/2009) based on the Application No. VEP-390/2013.
The amendments, described below, are incorporated into this environmental
permit (No. EP-359/2009/A). This environmental permit as amended is for the
construction and operation of the designated project described in Part B subject to the conditions specified in Part C. The issue of this environmental permit is based
on the documents, approvals or permissions described below:
根據《環境影響評估條例》(環評條例) 第10條的規定,環境保護署署長(署長)於
Application No. 申請書編號 |
VEP-390/2013 |
Document in the Register: 登記冊上的文件: |
(1) Project
Profile - "Water Reclamation Facilities for Yuen Long, Sai Kung and (Register
No. PP-390/2009) (1) 工程項目簡介 – 元朗、西貢及赤柱污水處理廠的再造水生產設施 (登記冊編號: PP-390/2009) (2) The
Director’s letter of permission to apply directly for environmental permit
dated 22 July 2009. (Ref.: EP 2/G/F/156) (2) 署長於 (檔案編號: EP 2/G/F/156) (3) Application
for environmental permit submitted by the Permit Holder on 24 July 2009
(Application No. AEP-359/2009 ) (3) 許可證持有人於 (4)
Environmental Permit issued on 12 August 2009 (Permit No. EP-359/2009) (4) 於 (5) Application
for Variation of Environmental Permit including all attachments submitted by
the Permit Holder on 21 January 2013 (Application No. VEP-390/2013) (5)許可證持有人於 |
Application
No. 申請書編號 |
Date of
Application 申請日期 |
List of
Amendments Incorporated into Environment Permit 已包含在環境許可證內的修訂項目 |
Date of
Amendment 修訂日期 |
VEP-390/2013 |
21
January 2013 |
Vary
Condition 2.1 and Figure 1 in Part C of Environmental Permit No. EP-359/2009 |
7 February 2013 |
7 February
2013
Date 日期 |
|
(Ken Y.K. Wong) Principal Environmental
Protection Officer for Director of
Environmental Protection 環境保護署署長 (首席環境保護主任 黃耀光代行) |
PART B (DESCRIPTION OF DESIGNATED PROJECT)
B部 (指定工程項目的說明)
Hereunder
is the description of the designated project mentioned in Part
A of this environmental permit (hereinafter referred to as
the “Permit”):
下列為本環境許可證(下稱“許可證”)A部所提述的指定工程項目的說明﹕
Title of Designated Project 指定工程項目的名稱 |
Water
Reclamation Facility for Stanley Sewage Treatment Works (Stanley STW) [This
designated project is hereafter referred to as “the Project”] 赤柱污水處理廠的再造水設施 [本指定工程項目下稱 “工程項目”] |
Nature
of Designated Project |
Reuse of treated sewage effluent from a
water reclamation facility. 循環再用經再造水設施處理的廢水。 |
Location of Designated Project 指定工程項目的地點 |
Within the boundary of the existing
Stanley STW 位於現有赤柱污水處理廠設施範圍內: The location of the Project is
shown in Figure 1 of this
Permit. 指定工程項目的位置載於本許可證圖1。 |
Scale and Scope of Designated Project 指定工程項目的規模和範圍 |
Construction and operation of a water reclamation facility with a
maximum design flow of about 工程項目的範圍包括安裝及營運再造水設施,包括一台薄膜過濾〈微過濾 / 超過濾〉裝置及一台逆滲透裝置。設施每日產生約 |
1. General
Conditions
1.1 The Permit Holder and
any person working on the Project shall comply with all conditions set out in
this Permit. Any non-compliance by any person may constitute a contravention of
the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become
the subject of appropriate action being taken under the EIAO.
1.2 The
Permit Holder shall ensure full compliance with all legislation from time to
time in force including, without limitation to, the Noise Control Ordinance
(Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control
Ordinance (Cap. 358), Waste Disposal Ordinance (Cap. 354) and Dangerous Goods
Ordinance (Cap. 295). This Permit does not of itself constitute any ground of
defence against any proceedings instituted under any legislation or imply any
approval under any legislation.
1.3 The
Permit Holder shall make copies of this Permit together with all documents
referred to in this Permit or the documents referred to in Part
A of the Permit readily available at all times for inspection by the
Director or his authorised officers at all sites/offices covered by this
Permit. Any reference to the Permit shall include all documents referred to in
the Permit and also the relevant documents in the Register.
1.4 The
Permit Holder shall give a copy of this Permit to the person(s) in charge of
the site(s) and ensure that such person(s) fully understands all conditions and
all requirements incorporated by the Permit. The site(s) refers to site(s) of
construction and operation of the Project and shall mean the same hereafter.
1.5 The
Permit Holder shall display conspicuously a copy of this Permit on the Project
site(s) at all vehicular site entrances/exits or at a convenient location for
public’s information at all times. The Permit Holder shall ensure that the most
updated information about the Permit, including any amended Permit, is
displayed at such locations. If the Permit Holder surrenders a part or
the whole of the Permit, the notice he sends to the Director shall also be
displayed at the same locations as the original Permit. The suspended, varied
or cancelled Permit shall be removed from display at the Project site(s).
1.6 The
Permit Holder shall construct and operate the Project in accordance with the
project description in Part B of this Permit.
1.7 The
Permit Holder shall ensure that the Project is constructed and operated in
accordance with the information and recommendations described in the Project Profile (Register No: PP-390/2009);
the application documents for
environmental permits; other relevant documents in the Register; the information
or mitigation measures described in this Permit; mitigation measures to be
recommended in submissions that shall be deposited with or approved by the
Director as a result of permit conditions contained in this Permit; and
mitigation measures to be recommended under on going surveillance and
monitoring activities during all stages of the Project. Where recommendations
referred to in the documents of the Register are not expressly referred to in
this Permit, such recommendations are nevertheless to be implemented unless
expressly excluded or impliedly amended in this Permit.
1.8 All
submissions, as required under this Permit, shall be rectified and resubmitted
in accordance with the comments, if any, made by the Director within one month of
the receipt of the Director’s comments or otherwise as specified by the
Director.
1.9 All
submissions approved by the Director, all submissions deposited without
comments by the Director, or all submissions rectified in accordance with
comments by the Director under this Permit shall be construed as part of the
permit conditions described in Part C of this
Permit. Any variation of the submissions shall be approved by the Director in
writing or as prescribed in the relevant permit conditions. Any non-compliance
with the submissions may constitute a contravention of the Environmental Impact
Assessment Ordinance (Cap. 499). All submissions or any
variation of the submissions shall be verified by the Permit Holder.
1.10 The Permit Holder shall release all
finalized submissions as required under this Permit, to the public by
depositing copies in the EIAO Register Office, or in any other places, or any
internet websites as specified by the Director, or by any other means as
specified by the Director for public inspection. For this purpose, the Permit
Holder shall provide sufficient copies of the submissions.
1.11 All submissions to the Director
required under this Permit shall be delivered either in person or by registered
mail to the EIAO Register Office (currently at
27/F, Southorn Centre,
1.12 The Permit Holder shall notify the
Director in writing the commencement dates of construction and operation of the
Project at least two weeks prior to the commencement of construction and operation
of the Project. The Permit Holder shall notify the Director in writing
immediately if there is any change of the commencement dates of the
construction and operation.
1.13 For the purpose of this Permit,
“commencement of construction” does not include works related to site clearance
and preparation, or other works as agreed by the Director.
2. Special
Conditions
2.1
The
reclaimed water shall be used for non-potable uses such as make-up water for
deodorizer, ground and facility washing, toilet flushing, landscape irrigation
and polymer preparation within the Stanley Sewage Treatment Works. The reclaimed
water quality of this Project shall meet the requirements set out in Table 1
of this Permit.
2.2
Any surplus
reclaimed water shall be diverted back to the Stanley Sewage Treatment Works.
2.3
To avoid
mis-connection to potable water pipelines, the reclaimed water pipelines shall
be clearly labeled with warning signs and notices; colour-coded; and of
different sizes.
Notes:
1. This
Permit consists of three parts, namely, Part A
(Main Permit), Part B (Description of Designated
Project) and Part C (Permit Conditions). Any person relying on this permit should
obtain independent legal advice on the legal implications under the EIAO, and
the following notes are for general information only.
2. If
there is a breach of any condition of this Permit, the Director or his
authorized officer may, with the consent of the Secretary
for the Environment, order the cessation of associated work until the
remedial action is taken in respect of the resultant environmental damage, and
in that case the Permit Holder shall not carry out any associated works without
the permission of the Director or his authorized officer.
3. The
Permit Holder may apply under Section 13 of the EIAO to the Director for a
variation of the conditions of this Permit. The Permit Holder shall replace the
original permit displayed on the Project site by the amended permit.
4. A
person who assumes the responsibility for the whole or a part of the Project
may, before he assumes responsibility of the Project, apply under Section 12 of
the EIAO to the Director for a further environmental permit.
5. Under
Section 14 of the EIAO, the Director may with the consent of the Secretary for the Environment, suspend, vary or
cancel this Permit. The suspended, varied or cancelled Permit shall be removed
from display at the Project site.
6. If
this Permit is cancelled or surrendered during construction or operation of the
Project, another environmental permit must be obtained under the EIAO before
the Project could be continued. It
is an offence under Section 26(1) of the EIAO to construct or operate a
designated project listed in Part I of Schedule 2 of the EIAO without a valid
environmental permit.
7. Any
person who constructs or operates the Project contrary to the conditions in the
Permit, and is convicted of an offence under the EIAO, is liable:
(i)
on a first conviction on indictment
to a fine of $2 million and to
imprisonment for 6 months;
(ii)
on a second or subsequent
conviction on indictment to a fine of $5 million and to imprisonment for 2
years;
(iii)
on a first summary conviction to a
fine at level 6 and to imprisonment for 6 months;
(iv)
on a second or subsequent summary
conviction to a fine of $1 million and to imprisonment for 1 year; and
(v)
in any case where the offence is of
a continuing nature, the court or magistrate may impose a fine of $10,000 for
each day on which he is satisfied the offence continued.
8. The
Permit Holder may appeal against any condition of this Permit under Section 17
of the EIAO within 30 days of receipt of this Permit.
9.
The Notes are for general reference
only and that the Permit Holder should refer to the EIAO for details and seek
independent legal advice.
| Figure 1 |
[ Back to First Page ] / [ Back to Main Index ]
Table 1 The
standards of reclaimed water quality
(based
on Table 1 of Project Profile (Register No. PP-390/2009) and to be read in
conjunction with Condition 2.1 of this Permit)
Water
quality parameter |
Unit |
Reclaimed
Water Quality of this Project |
||||
Make-up
water |
Ground and
facility washing |
Toilet
flushing |
Polymer
preparation |
Landscape
irrigation |
||
pH |
- |
6-9 |
6-9 |
6-9 |
6.2-8.3 |
6-9 |
Colour |
HU |
N.S. |
N.S. |
N.S. |
< 20 |
N.S. |
Turbidity |
NTU |
≦ 2 |
≦ 2 |
≦ 2 |
≦ 2 |
≦ 2 |
Total
Suspended Solids (TSS) |
mg/L |
≦ 10 |
≦ 10 |
≦ 10 |
≦ 5 |
≦ 10 |
Biochemical
Oxygen Demand (BOD5) |
mg/L |
≦ 10 |
≦ 10 |
≦ 10 |
≦ 10 |
≦ 10 |
E. Coli |
No./100mL |
Not
Detectable |
Not
Detectable |
Not
Detectable |
Not
Detectable |
Not
Detectable |
Total
Residual Chlorine (TRC) |
mg/L |
≧ 1 |
≧ 1 |
≧ 1 |
N.S. |
≦ 1 |
Total
Dissolved Solids (TDS) |
mg/L |
N.S. |
N.S. |
N.S. |
< 200 |
N.S. |