Environmental Permit No. EP-313/2008/H
Àô¹Ò³\¥iÃÒ½s¸¹ EP-313/2008/H
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Sections 10 & 13
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10¤Î13±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE
A DESIGNATED PROJECT
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section
10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of
Environmental Protection (the Director) grants the Environmental Permit (EP-313/2008) to the
MTR
Corporation Limited (hereinafter referred to as the "Permit
Holder")
on 12 January 2009. Pursuant to Section 13 of the EIAO, the
Director amends the Environmental Permit based on the Application No. VEP-422/2013. The amendments, described below, are
incorporated into this Environmental Permit (EP-313/2008/H). This Environmental Permit as amended is
for the construction and operation of the designated
project described in Part B subject to the conditions
specified in Part C. The issue of this environmental
permit is based on the documents, approvals or permissions described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]±ø¨Ò¡^²Ä10¤Î13±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø¡]¸pªø¡^©ó 2009 ¦~ 1¤ë 12¤é±NÀô¹Ò³\¥iÃÒ (½s¸¹EP-313/2008)
§å¤©»´ä鐡¸ô¦³¤½¥q (¤UºÙ ¡§³\¥iÃÒ«ù¦³¤H¡¨¡^¡C®Ú¾Ú±ø¨Ò²Ä13±øªº³W©w¡A¸pªø¦]À³§ó§ïÀô¹Ò³\¥iÃÒªº¥Ó½Ð½s¸¹VEP-422/2013×qÀô¹Ò³\¥iÃÒ¡C¥H¤U×q¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤º(EP-313/2008/H) ¡C¥»¸g×qªºÀô¹Ò³\¥iÃÒ§@¬°«Ø³y¤ÎÀç¿ì¥»³\¥iÃÒB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§åã©Î³\¥i§@¬°®Ú¾Ú¡G
Application No. ¥Ó½Ð®Ñ½s¸¹ |
VEP-422/2013 |
Document in the Register : µn°O¥U¤Wªº¤å¥ó: |
(1) West Island Line Environmental Impact Assessment (EIA) Report, Environmental Monitoring and Audit (EM&A) Manual and Executive Summary (Register No.: AEIAR-126/2008) [Hereinafter referred to as the ¡§EIA Report¡¨] (1) ¦è´ä®q½uÀô¹Ò¼vÅTµû¦ô³ø§i¡AÀô¹ÒºÊ´ú¤Î¼f®Ö¤â¥U¤Î¦æ¬FºKn (µn°O¥UÀɸ¹:
AEIAR-126/2008) [¤UºÙ ¡§Àôµû³ø§i¡¨] |
|
(2) The Director¡¦s
letter of approval of the EIA report dated 23 Dec 2008 [ Ref.: (10) in
EP2/G/A/ (2) ¸pªø©ó |
(3) Application for an Environmental Permit No. AEP-313/2008. [Hereafter referred to as ¡§the
Application No. AEP-313/ (3)¥Ó½ÐÀô¹Ò³\¥iÃÒ½s¸¹ AEP-313/2008¡C[¤UºÙ ¡§¥Ó½Ð®Ñ½s¸¹
AEP-313/ |
|
(4) Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 15 June 2009 (Application No. VEP-291/2009) (4) ³\¥iÃÒ«ù¦³¤H©ó |
|
(5) Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 24 June 2009 and 17 July 2009 (Application No. VEP-294/2009) (5) ³\¥iÃÒ«ù¦³¤H©ó |
|
|
(6) Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 18 August 2009 (Application No. VEP-298/2009) (6) ³\¥iÃÒ«ù¦³¤H©ó |
|
(7) Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 24 December 2009 (Application No. VEP-333/2010) (7) ³\¥iÃÒ«ù¦³¤H©ó |
|
(8) Application
documents for Variation of Environmental Permit including all attachments
submitted by the Permit Holder on 25
July 2012 (Application No. VEP-372/2012) (8) ³\¥iÃÒ«ù¦³¤H©ó |
|
(9) Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 24 September 2012 (Application No. VEP-376/2012) (9) ³\¥iÃÒ«ù¦³¤H©ó |
|
(10) Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 6 May 2013 (Application
No. VEP-404/2013) (10) ³\¥iÃÒ«ù¦³¤H©ó |
|
(11) Application documents for Variation of
Environmental Permit including all attachments submitted by the Permit Holder
on 3 December 2013
(Application No. VEP-422/2013) (11) ³\¥iÃÒ«ù¦³¤H©ó |
Application No. ¥Ó½Ð®Ñ½s¸¹ |
Date of Application ¥Ó½Ð¤é´Á |
List of Amendments Incorporated into
Environmental Permit ¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤ºªº×q¶µ¥Ø |
Date of Amendment ×q¤é´Á |
VEP-291/2009 |
15 June 2009 |
Vary Conditions
1.14, 2.7 and §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008 C³¡²Ä
1.14, 2.7 ©M |
26 June 2009 |
VEP-294/2009 |
24 June 2009 |
Vary Condition §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/A C³¡ ²Ä1.7
¶µ±ø¥ó¡C Vary table in
Condition §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/A C³¡ ²Ä
Vary Figures 1 and 2 of Environmental Permit No. EP-313/2008/A, and add Figures 3 & 4 to include additional Works Areas A1, A2 and A3. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/A ªº¹Ï1¤Î2, ¥H¤Î·s¼W ¹Ï 3 & 4 ¥H¥]¬A·sªº¬I¤u°ÏA1, A2 ¤ÎA3¡C Re-number Figures 3, 4 & 5 Environmental Permit No. EP-313/2008/A as Figures 8, 9 & 10. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/A ªº¹Ï3, 4¤Î5½s¸¹¬°¹Ï8, 9¤Î10¡C |
22 July 2009 |
VEP-298/2009 |
18 August 2009 |
Vary Condition §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/B C³¡ ²Ä1.7
¶µ±ø¥ó¡C Add Condition 2.14 to specify measures to mitigate landscape & visual impacts at extended Works Area I. ·s¼W²Ä2.14 ¶µ±ø¥ó¡A«ü©w¨ãÅé±¹¬I¡A¥H´î»´ÂX¤jªº¬I¤u°ÏIªº´ºÆ[¤Îµøı¼vÅT¡C Vary Figures 1 and 2 of Environmental Permit No. EP-313/2008/B, and add Figure 5 to include extended Works Area I. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/B ªº¹Ï1¤Î2, ¥H¤Î·s¼W ¹Ï 5¥H¥]¬AÂX¤jªº¬I¤u°ÏI¡C Add Figures 6 to 9 to show details of extended Works Area I. ·s¼W¹Ï 6¦Ü9¥HÅã¥ÜÂX¤jªº¬I¤u°ÏIªº²Ó¸`¡C Re-number Figures 5 to 10 in Environmental Permit No. EP-313/2008/B as Figures 10 to 15. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/B ªº¹Ï5¦Ü 10½s¸¹ ¬° ¹Ï10¦Ü15¡C |
31August 2009 |
VEP-333/2010 |
24 December 2010 |
Vary Conditions §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/C ªºC³¡ªº ²Ä Add Conditions ¦bÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/D ªºC³¡·s¼W²Ä Re-number Condition §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/C ªºC³¡ªº²Ä Vary Figure 13 Detail B in
Environmental Permit No. EP-313/2008/C and add Figures 14 and 15 in Environmental Permit No.
313/2008/D. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/C ªº¹Ï13²Ó¸`B
¤Î¦bÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/D·s¼W¹Ï14¤Î15¡C Re-number Figures 14 and §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/C ªº¹Ï14¤Î15¬°Àô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/D ªº¹Ï16¤Î17¡C |
19 January 2011 |
VEP-372/2012 |
25 July 2012 |
Vary table in Condition §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/D ªºC³¡²Ä
Add Conditions 2.15 and ·s¼W²Ä2.15¤Î Add Figure 13 to show
details of the mitigation measures. ·s¼W¹Ï13¥HÅã¥Ü½w¸Ñ±¹¬Iªº²Ó¸`¡C Add Figure 14 to show the
locations of ·s¼W¹Ï14¥HÅã¥Ü¯ë«w¹D©x¥ß¤p¾Ç¡B¬ü¨FଶE©Ò¡B¹l¼z»Õ¤Îª÷¹ç¤j·Hªº¦ì¸m¡C Re-number Figures 13 to 17 in Environmental Permit No.
EP-313/2008/D as Figures 15 to 19 in Environmental Permit No.
EP-313/2008/E. §ó§ïÀô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/D ªº¹Ï13¦Ü17¬°Àô¹Ò³\¥iÃÒ½s¸¹EP-313/2008/E ªº¹Ï15¦Ü19¡C |
1 August 2012 |
VEP-376/2012 |
24 September 2012 |
Condition ²¾°£«ü©wÃz¬µ«~¹B°e©¹¬I¤u°ÏM3ªº¦w±Æªº²Ä |
5 October 2012 |
VEP-404/2013 |
6 May 2013 |
Condition ²¾°£«ü©w¤ôÀ£¸ü¨t²Îªº²Ä Vary Conditions §ó§ï²Ä Vary Figure 13. §ó§ï¹Ï13¡C |
16 May 2013 |
VEP-422/2013 |
3 December 2013 |
Vary Conditions §ó§ï²Ä Figure 19 is not used. ²¾°£¹Ï19¡C |
16 December 2013 |
16 December 2013 |
|
|
Date ¤é´Á |
|
(Ken
Y. K. WONG) Principal
Environmental Protection Officer for
Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô 黄Ä£¥ú ¥N ¦æ) |
PART B (DESCRIPTION OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the
description of the designated project mentioned in Part A
of this environmental permit (hereinafter referred to as ¡§the Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title
of Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ
|
[This designated project
hereinafter referred to as ¡§the Project¡¨] ¦è´ä®q½u [³o«ü©w¤uµ{¶µ¥Ø¤UºÙ¡§¤uµ{¶µ¥Ø¡¨] |
Nature
of Designated Project «ü©w¤uµ{¶µ¥Øªº©Ê½è |
Construction
and operation of an approximately ¿³«Ø©M¹B§@¤@±øªø¬ù3 ¤½¨½ªº¦a©³ÅK¸ô¤Î¦³Ãöªº¤õ¨®¯¸¡C |
Location
of Designated Project «ü©w¤uµ{¶µ¥Øªº¦aÂI
|
Sheung
Wan, Sai Ying Pun and ¤WÀô¡B¦èÀç½L©M°í¥§¦a«°¡C¤uµ{¶µ¥Øªº¦ì¸m¨£¸ü©ó¥»³\¥iÃÒ§¨ªþªº¹Ï1 ¤Î 2¡C |
Scale and Scope of Designated Project |
Construction
and operation of an approximately ¿³«Ø©MÀç¿ì¤@±øªø¬ù3¤½¨½ªº¦a©³ÅK¸ô¡B¦èÀç½L¯¸¡B¤j¾Ç¯¸©M°í¥§¦a«°¯¸¡B¦³Ãöªº³q·¼Ó¡B¾÷¼Ó ¤Î Á{®É¦a¤U¬µÃÄ®w¡C |
1.
General Conditions
1.1 The Permit
Holder and any person working on the Project shall comply with all conditions
set out in this Permit. Any non-compliance by any person may constitute a
contravention of the Environmental Impact Assessment Ordinance (Cap. 499) and
may become the subject of appropriate action being taken under the Ordinance.
1.2 The Permit Holder shall ensure full
compliance with all legislation from time to time in force including but
without limitation the Noise Control Ordinance (Cap. 400), Air Pollution
Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358),
Waste Disposal Ordinance (Cap. 354), Occupational Safety and Health Ordinance
(Cap. 509), Factories and Industrial Undertakings Ordinance (Cap. 59) and
Dangerous Goods Ordinance (Cap.295).
This Permit does not of itself constitute any ground of defense against
any proceedings instituted under any legislation.
1.3 The
Permit Holder shall make copies of this Permit together with all documents
referred to in this Permit or the documents referred to in Part
A of the Permit readily available at all times for inspection by the
Director or his authorised officers at all sites/offices covered by this
Permit. Any reference to the Permit
shall include all documents referred to in the Permit and also the relevant
documents in the Register.
1.4 The
Permit Holder shall give a copy of this Permit to the person(s) in charge of
the site(s) and ensure that such person(s) fully understands all conditions and
all requirements incorporated by the Permit. The site(s) refers to site(s) of
construction and operation of the Project and shall mean the same hereafter.
1.5 The Permit Holder shall display
conspicuously a copy of this Permit on the construction site(s) at all
vehicular site entrances/exits or at a convenient location for public¡¦s
information at all times. The
Permit Holder shall ensure that the most updated information about the Permit,
including any amended permit, is displayed at such locations. If the Permit
Holder surrenders a part or the whole of the Permit, the notice he sends to the
Director shall also be displayed at the same locations as the original Permit.
The suspended, varied or cancelled Permit shall be removed from display at the
construction site(s).
1.6
The Permit Holder shall construct
and operate the Project in accordance with the project descriptions in Part B of this Permit.
1.7 The
Permit Holder shall ensure that the Project is designed, constructed and
operated in accordance with the information and all recommendations described
in the EIA Report (Register No.: AEIAR- 126/2008), the application documents
including all attachments (Application No. AEP-313/2008), the Applications for
Variation of Environmental Permit including all attachments submitted by the
Permit Holder, other relevant documents in the Register; and the information or
mitigation measures described in this Permit, and mitigation measures to be
recommended in submissions that shall be deposited with or approved by the
Director as a result of permit conditions contained in this Permit, and
mitigation measures to be recommended under on going surveillance and
monitoring activities during all stages of the Project. Where recommendations
referred to in the documents of the Register are not expressly referred to in
this Permit, such recommendations are nevertheless to be implemented unless expressly
excluded or impliedly amended in this Permit.
1.8 All
deposited submissions, as required under this Permit, shall be rectified and
resubmitted in accordance with the comments, if any, made by the Director
within one month of the receipt of the Director¡¦s comments or otherwise as
specified by the Director.
1.9 All
submissions approved by the Director, all submissions deposited without
comments by the Director, and all submissions rectified in accordance with
comments by the Director under this Permit shall be construed as part of the
permit conditions described in Part C of this Permit. Any
variation of the submissions shall be approved by the Director in writing or as
prescribed in the relevant permit conditions. Any non-compliance with the
submissions may constitute a contravention of the Environmental Impact
Assessment Ordinance (Cap. 499). All submissions or any variation of the
submissions shall be certified by the Environmental Team (ET) Leader and
verified by the Independent Environmental Checker (IEC) referred to in
Conditions 2.1 and 2.2 below, before submitting to the Director under this
Permit.
1.10 The Permit Holder
shall release all finalised submissions as required under this Permit, to the
public by depositing copies in the Environmental Impact Assessment Ordinance
Register Office, or in any other places, or any internet websites as specified
by the Director, or by any means as specified by the Director, for public
inspection. For this purpose, the Permit Holder shall provide sufficient copies
of the submissions.
1.11 The Permit Holder
shall notify the Director in writing the commencement date of construction of
the Project no later than one month prior to the commencement of construction
of the Project. The Permit Holder shall notify the Director in writing
immediately if there is any change of the commencement date of the
construction.
1.12 All submissions
to the Director required under this Permit shall be delivered either in person
or by registered mail to the Environmental Impact Assessment Ordinance Register
Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong
Kong). Electronic copies of all finalised submissions required under this
Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or
later) and in Portable Document Format (PDF version 1.3 or later), unless
otherwise agreed by the Director and shall be submitted at the same time as the
hardcopies.
1.13 For the purpose
of this Permit, ¡§commencement of construction¡¨ does not include works related
to site clearance and preparation, or other works as agreed by the Director.
1.14 The Permit Holder
shall notify the Director in writing the commencement date of operation of the
Project no later than one week prior to the commencement of operation of the
Project. The Permit Holder shall notify the Director in writing immediately if
there is any change of the commencement date of the operation.
2
Special Conditions
Submissions or Measures
before Commencement of Construction of the Project
2.1 An
Environmental Team (ET) shall be established by the Permit Holder no later than
one month before the commencement of construction of the Project. The ET shall
not be in any way an associated body of the Contractor or the Independent
Environmental Checker (IEC) for the Project. The ET shall be headed by an ET
Leader. The ET Leader shall be a person who has at least 7 years of experience
in environmental monitoring and auditing (EM&A) or environmental
management. The ET and the ET Leader shall be responsible for the
implementation of the EM&A programme in accordance with the EM&A
requirements as contained in the EM&A Manual of the Project. The ET Leader shall
keep a contemporaneous log-book of each and every instance or circumstance or
change of circumstances, which may affect the compliance with the
recommendations of the EIA Report (Register No. AEIAR-126/2008) and this
Permit. The ET Leader shall notify the IEC within one working day of the
occurrence of any such instance or circumstance or change of circumstances. The
ET Leader¡¦s log-book shall be kept readily available for inspection by all
persons assisting in supervision of the implementation of the recommendations
of the EIA Report (Register No. AEIAR-126/2008) and this Permit or by the
Director or his authorized officers. Failure to maintain records in the
log-book, failure to discharge the duties of the ET Leader as defined in the
EM&A Manual or failure to comply with this Condition would entitle the
Director to require the Permit Holder by notice in writing to replace the ET
Leader. Failure by the Permit Holder to make replacement, or further failure to
keep contemporaneous records in the log-book despite the employment of a new ET
Leader may render the Permit liable to suspension, cancellation or variation.
2.2 An
Independent Environmental Checker (IEC) shall be employed by the Permit Holder
no later than one month before commencement of construction of the Project. The
IEC shall not be in any way an associated body of the Contractor or the ET for
the Project. The IEC shall be a person who has at least 7 years of experience
in EM&A or environmental management. The IEC shall be responsible for duties
defined in the EM&A Manual and shall audit the overall EM&A
performance, including the implementation of all environmental mitigation
measures, submissions required in the EM&A Manual, and any other
submissions required under this Permit. In addition, the IEC shall be
responsible for verifying the environmental acceptability of permanent and
temporary works, relevant design plans and submissions under this Permit. The
IEC shall verify the log-book(s) mentioned in Condition 2.1 of this Permit. The
IEC shall notify the Director by fax, within one working day of receipt of
notification from the ET Leader of each and every occurrence, change of
circumstances or non-compliance with the EIA Report (Register No.
AEIAR-126/2008) and this Permit, which might affect the monitoring or control
of adverse environmental impacts from the Project. In the case where the IEC
fails to so notify the Director of the same, fails to discharge the duties of
the IEC as defined in the EM&A Manual or fails to comply with this Condition,
the Director may require the Permit Holder by notice in writing to replace the
IEC. Failure to replace the IEC as directed or further failure to so notify the
Director despite employment of a new IEC may render the Permit liable to
suspension, cancellation or variation. Notification by the Permit Holder is the
same as notification by the IEC for the purpose of this Condition.
2.3 The
Permit Holder shall, no later than two weeks before the commencement of
construction of the Project, inform the Director in writing the management
organization of the main construction companies and/or any form of joint
ventures associated with the construction of the Project. The submitted
information shall include at least an organization chart, names of responsible
persons and their contact details.
2.4 The Permit
Holder shall, no later than two weeks before the commencement of construction
of the Project, deposit with the Director six hard copies and one electronic
copy of the construction programme showing the commencement and completion
dates of major items of construction works, including dates of taking
possession of and subsequent exit from Works Area B. The construction programme shall be
certified by the ET Leader and verified by the IEC as conforming to the
information, requirements and recommendations set out in the approved EIA
report (Register No. AEIAR-126/2008).
The Permit Holder shall inform the Director accordingly in writing in
case of any subsequent changes of items contained in this submitted construction
programme.
2.5 The
Permit Holder shall appoint a Certified Arborist for the Project to advise on,
monitor and ensure proper implementation of measures for protecting trees
affected by the Project, in particular the tree walls and registered Old and
Valuable Trees around Forbes Street Temporary Playground and
2.6 The
Permit Holder shall set up Community Liaison Groups comprising representatives
of concerned and affected parties, including owners¡¦ corporations, management
offices, local committees and schools in the affected areas, to facilitate
communication, enquiries and complaints handling on all environmental issues,
including the follow up on the implementation of remedial mitigation measures,
and other initiatives by the Permit Holder such as Indirect Technical Remedy in
the form of upgraded glazing and air conditioning for eligible dwellings
affected by construction air-borne noise impact, as well as any need for real
time noise monitoring and web camera monitoring. The Permit Holder shall notify the
Director the date of setting up the Community Liaison Groups at least 2 weeks
before commencement of construction of the Project. A designated complaint
hotline shall also be set up for the Project to address such concerns and
complaints in an efficient manner.
2.7 The
Certified Arborist appointed under Condition 2.5 shall no later than two weeks
before the commencement of construction of the Project, deposit with the
Director six (6) hard copies and one electronic copy of a Tree Protection Plan
detailing the requirements and measures for the proper protection and
monitoring of trees affected by the construction of the Project, including all
Old and Valuable Trees within the Project boundary and the tree walls at Forbes
Street Temporary Playground and King George V Memorial Park. The Tree
Protection Plan shall also cover Works Area MA (magazine site) shown in Figure 2 and shall include:
(i)
detailed
working method statement for the protection of retained trees;
(ii)
tree
transplanting proposal including final location for transplanted trees that
will be affected by the works and are trees of high to medium survival rate;
(iii)
compensatory
tree planting proposal including location of trees planted as compensation to
felled trees;
(iv)
water
table monitoring proposal at Forbes Street Temporary Playground;
(v)
an
audit report proposal on the tree protection activities to be implemented
throughout the construction period
Before submission to the
Director, the Tree Protection Plan shall be certified by the ET Leader and
verified by the IEC as conforming to the information, requirements and
recommendations as set out in the approved EIA report.
2.8 Prior
to the commencement of construction work at Works Area MA (the magazine site),
to protect the two individual plants, Hong Kong Pavetta (Pavetta
hongkongensis), located within the footprint of proposed tunnel portal and
access entrance from Works Area MA, shall be transplanted to a suitable nearby
tall shrubland or woodland habitats. The transplantation shall be supervised by
the Certified Arborist appointed under Condition 2.5. The existing trees and
species of conservation importance (i.e. the two identified Silver-back
Artocarpus, Artocarpus hypargyreus) located near the Works Area MA shall be
fenced off and the trunk protected with hessian sacking as far as practicable
prior to the commencement of construction work at Works Area MA.
2.9 The
Tunnel Boring Machine (TBM) to be used in the Project shall be launched at
Works Area N1 (
Submissions
or Measures during Construction of the Project
2.10 Measures
to Mitigation Construction Stage Air-Borne Noise Impacts
Mitigation
Measures (Details
& timing to refer to approved EIA Report) |
Works
areas |
Movable
noise barrier shall be used for the following PME where practicable: Breaker,
Mini Backhoe, Generator, Backhoe, Crane, Hand-held Vibratory Poker, Hydraulic
Breaker, Wheel Loader, Crusher, Hand Held Breaker, Compressor, Grout Plant,
Grout Mixer, Concrete Pump, Excavator, Lorry Crane, Mobile Crane, Crawler
Crane. |
Works
areas A, C, D, H, I, J, J1, L1, M1, N1, M3, O1, O2 and O3 |
Noise
enclosure / acoustic shed shall be used for the following PMEs where
practicable: Air Compressor Concrete Pump, Shotcrete Pump, Hand Held Breaker,
Grout Pump, Concrete Corer. |
All
works areas |
Acoustic
Enclosure shall be used for enclosing the rock drill as fully as possible. |
Works
areas H, N1 and M |
Noise
insulating cover shall be used to cover the following PME: Breaker, Backhoe,
Submersible Electric Water Pump, Crawler Mounted Rock Drill Trucks, Rock
drill, Air Compressor, Electric Winch, Concrete pump, Hand-held Vibratory
Poker, Hand Held Breaker, Crane, Shotcrete pump. |
Works
areas J1, N1, M1 and M3 |
Silencer
shall be used for the ventilation fan. |
Works
areas MA, A, C, D, G, H, I, J, J1, J2, J3, L1, M, M1, M3, N1, O1, O2 and O3. |
Noise
insulating fabric shall be applied where practicable to cover the following
PME: Pile Rig, Drill Rig, Pile Extractor, Power Rammer, Earth Auger Pilling,
Hydraulic Piling, Sheet Piling Machine. |
Works
areas A, A1, A2, A3 MA, C, D, G, H, I, J, J1, J2, J3, L1, M, M1, M3, N1, O1,
O2 and O3. |
Use
of ¡§Noise Control Curtain¡¨ - a noise insulating fabric to be mounted on the
steel scaffold erected on the buildings to be demolished to an extent such
that the line of sight between the noise source and NSR would be blocked. |
Works
area A |
Temporary
noise barriers shall be erected at the works areas of West of KET Station and
SYP Entrance A1 & A2. |
Works
area C, as shown in Figures 10, 11 & 12, and Works Area N1 |
Decking
over shall be provided to cover the excavation area. |
Works
areas J, J3, G and L1. Works Area
C as shown in Figures 10, 11 & 12. |
Full
enclosure of entire works area. |
Works
area J2 |
Use
of concrete crusher instead of hydraulic breaker. |
Works
area J2, M1 and M3 |
Soundproof
cover as shown in Figure 13 shall
be mounted on top of the construction shaft and fully enclosed during
blasting. |
Works
area M3 |
2.11 Submissions
or Measures to Mitigate Construction Stage Cultural Heritage Impacts
2.12 Submissions
or Measures for Construction Waste Management
2.13 Measures
to Mitigate Construction Water Quality Impact
2.14 Measures to Mitigate Landscape & Visual Impacts at Extended
Works Area I
2.15 Special Conditions pertaining to Blasting at Works Area M3
(a)
Not
used.
(b)
A
sprinkler system as shown in Figure 13
shall be installed in the shaft under the soundproof cover. The sprinkler system shall start
immediately after the blast and be operated for at least 30 minutes to allow
sufficient time for dust settling.
(c)
The
exhaust outlet of ventilation system shall be provided with dust filter and
shall point away from any air sensitive uses. The ventilation system shall be stopped
immediately before each blast and remain switched off for at least 30 minutes
to allow sufficient time for dust settling.
3 Special
Conditions pertaining to Works Area B
3.1 Entry
to, taking possession of, or commencing temporary use of Works Area B
(a)
At
least two weeks before the Permit Holder¡¦s entry to or taking possession of
Works Area B, the Permit Holder shall deposit with the Director six hard copy
and an electronic copy of a detailed updated Project programme, to be
accompanied by layout plans with detailed descriptions and drawings of
mitigation measures in scale of 1:1000 or in other suitable scale as agreed by
the Director, showing clearly the relevant works and/or temporary uses in Works
Area B of the Project. The works and/or
temporary uses in Works Area B of Project shall be implemented according to the
updated programme.
(b)
Six
hard copies and one electronic copy of Remediation Report shall be deposited
with the Director after the completion of the remediation and disposal of
contaminated soil and wastes at Works Area B. The Remediation Report shall demonstrate
that the remediation and disposal work has been undertaken according to the
specified methodology and has been shown to be adequate. The Remediation Report shall be
submitted at least one month before the Permit Holder¡¦s entry to or taking
possession of Works Area B.
(a)
An
Independent Structural Checker (ISC) shall be appointed by the Permit Holder no
later than one month before commencing temporary use of Works Area B. The ISC
shall be a person with at least 7 years' experience in structural engineering
design or structural engineering project management. The ISC shall not be in
any way an associated body of the Contractor or the Permit Holder for the
Project.
(b)
At
locations within the Works Area B identified to be temporarily used as
mentioned in Condition
3.2 Measures
to be implemented and/or maintained during temporary use of Works Area B
(a)
use
adequately designed and maintained perimeter channels, sediment traps,
temporary channels, temporary diversion and oil interception facilities to
mitigate site run-off impacts;
(b)
divert
all clean surface water around Works Area B;
(c)
provide
bunded areas for generators, and for storage of fuel, oil and chemical wastes;
and
(d)
the
provision of mitigation measures to avoid any potential release of additional
underground contaminants into the environment resulting from the temporary use
of Works Area B as mentioned in Condition
3.3 Exit from, handing over, or ceasing
temporary use of Works Area B
(a)
the
additional concrete paving and the layer of general fill material within the
areas as marked in green and red as shown in Figure 16 of this Permit; and
(b)
the
temporary site office and facilities for other temporary uses mentioned in
Condition
The site hoardings shall not be removed but shall be
properly maintained, complete and intact surrounding the site at all times
during the Permit Holder¡¦s exit from, handing over, or ceasing temporary use of
Works Area B.
(a)
a
Sampling and Testing proposal for the general fill material, to be implemented
at no less than 15 sampling points, the indicative locations of which are shown
in Figure 16. The proposal shall
confirm the exact number and location of sampling points and the details of the
contaminants of concern to be included in the general fill material sampling
and testing programme, making reference to Appendix A of this Permit and where
appropriate update;
(b)
a
programme for the submission of the Sampling and Testing Report (STR) and the
submission of a Remediation Action Plan (RAP) in the event that the STP found
contamination in the sampled general fill material; and
(c)
a
detailed Method Statement for the removal, temporary storage and treatment if
necessary, and disposal of the additional concrete paving and general fill
material, and an event and action plan for ensuring structural integrity of the
existing concrete paving throughout the removal process.
Before
submission to the Director, the above submissions shall be certified by the ET
Leader and verified by the IEC as conforming to the information and
recommendations contained in the VEP Application Document (No. VEP-333/2010).
4. Submissions or Measures before
Commencement of Operation of the Project
4.1 Submissions
or Measures for Operation Stage Ground-Borne Noise Impacts
4.2 Submissions
or Measures for Operation Stage Landscape and Visual Impacts
5. Submissions during Operation of the
Project
5.1 Submission for Operation Visual and
Landscape Impact
6. Environmental Monitoring and Audit
Requirements
6.1 The
EM&A programme shall be implemented in accordance with the procedures and
requirements as set out in the approved EM&A Manual. Any changes to the
programme shall be justified by the ET Leader and verified by the IEC as
conforming to the information and requirements contained in the EM&A Manual
before submission to the Director for approval. The EM&A programme shall include,
among other items, the following :
(i)
ground-borne
construction noise monitoring shall be conducted for TMB tunneling work. The monitoring locations shall be above
the cutting face of the TBM, and shall be located as close to the cutting face
as practicable, in accordance with the requirements in the approved EM&A
Manual;
(ii)
construction
vibration monitoring shall be conducted at Declared Monuments, Graded Historic
Buildings or other Built Heritage Resources within the Project boundary as
identified in the approved EIA Report and reported in accordance with the
requirements of the approved EM&A Manual; and
(iii)
ground
water table monitoring shall be conducted on a weekly basis at
6.2 Samples,
measurements and necessary remedial actions shall be taken in accordance with
the requirements of the EM&A Manual by:
(a)
conducting
baseline environmental monitoring;
(b)
conducting
impact monitoring;
(c)
carrying
out remedial actions described in Event/Action Plans of the approved EM&A
Manual in accordance with the time frames set out in Event/Action Plans, or as
agreed by the Director, in case where specified criteria in the approved
EM&A Manual are exceeded; and
(d)
logging
and keeping records of details of (a) to (c) above for all parameters within 3
working days of collection of data or completion of remedial action(s), for the
purpose of preparing and submitting the monthly EM&A Reports and to make
available for inspection on site.
6.3 Six
(6) hard copies and one electronic copy of the Baseline Monitoring Report shall
be submitted to the Director at least one month before commencement of
construction of the Project. The submission shall be certified by the ET Leader
and verified by the IEC. Additional copies of the submission shall be made
available to the Director upon his request.
6.4 Six
(6) hard copies and one electronic copy of monthly EM&A Report shall be
submitted to the Director within 10 working days after the end of the reporting
month. The EM&A Reports shall include a summary of all non-compliance
(exceedances) of the environmental quality performance limits (Action and Limit
Levels). The submissions shall be verified by the IEC. Additional copies of the
submission shall be provided to the Director upon request by the Director.
6.5 All
environmental monitoring and audit data submitted under this Permit shall be
true, valid and correct.
7. Electronic
Reporting of EM&A Information
7.1 To
facilitate public inspection of the Baseline Monitoring Report and monthly
EM&A Reports via the EIAO Internet Website and at the EIAO Register Office,
electronic copies of these Reports shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF
version 1.3 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hardcopies as described in Condition 6 of
this Permit. For the HTML version, a content page capable of providing
hyperlink to each section and sub-section of these Reports shall be included in
the beginning of the document. Hyperlinks to all figures, drawings and tables
in these Reports shall be provided in the main text from where the respective
references are made. All graphics in these Reports shall be in interlaced GIF
format unless otherwise agreed by the Director. The content of the electronic
copies of these Reports must be the same as the hardcopies.
7.2 The Permit Holder
shall, set up a dedicated web site and notify the Director in writing the
Internet address where the environmental monitoring and project data is to be
placed, within six weeks after the commencement of construction of the Project.
All environmental monitoring data described in Condition 6 above shall be made
available to the public via a dedicated web site to be set up by the Permit
Holder in the shortest possible time and in no event later than 2 weeks after
the relevant environmental monitoring data are collected or become available,
unless otherwise agreed with the Director.
7.3 The
Internet website as described in Condition 7.2 above shall enable user-friendly
public access to the monitoring and project data including the approved EIA
report and the environmental permit(s) and the project profile of the Project.
The Internet website shall have features capable of:
(a)
providing
access to all environmental monitoring data collected since the commencement of
works;
(b)
searching
by date;
(c)
searching
by types of monitoring data (noise, water and air quality); and
(d)
hyperlinks
to relevant monitoring data after searching;
or otherwise as agreed
by the Director.
Notes :
1. This Permit consists of three
parts, namely, PART A (Main Permit), PART
B (Description of Designated Project) and PART C(Permit
Conditions). Any person relying on this permit should obtain independent
legal advice on the legal implications under the Ordinance, and the following
notes are for general information only.
2. If there is a breach of any
conditions of this Permit, the Director or his authorized officer may, with the
consent of the Secretary for the Environment, order the cessation of associated
work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
3. The Permit Holder may apply under
Section 13 of the Ordinance to the Director for a variation of the conditions
of this Permit. The Permit Holder shall replace the original permit
displayed on the construction site by the amended permit.
4. A person who assumes the
responsibility for the whole or a part of the designated project may, before he
assumes responsibility of the designated project, apply under Section 12 of the
Ordinance to the Director for a further environmental permit.
5. Under Section 14 of the Ordinance,
the Director may with the consent of the Secretary for the Environment,
suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the construction site.
6. If this Permit is cancelled or
surrendered during construction or operation of the Project, another
environmental permit must be obtained under the Ordinance before the Project
could be continued. It is an offence under section 26(1) of the Ordinance
to construct or operate a designated project listed in Part I of schedule 2 of
the Ordinance without a valid environmental permit.
7. Any person who constructs or
operates the Project contrary to the conditions in the Permit, and is convicted
of an offence under the Ordinance, is liable:-
(i) on
a first conviction on indictment to a fine of $ 2 million and to imprisonment
for 6 months;
(ii) on
a second or subsequent conviction on indictment to a fine of $ 5 million and to
imprisonment for 2 years;
(iii)
on a first summary conviction to a fine at level 6 and to imprisonment for 6
months;
(iv)
on a second or subsequent summary conviction to a fine of $1 million and to
imprisonment for 1 year; and
(v)
in any case where the offence is of a continuing nature, the court or
magistrate may impose a fine of $ 10,000 for each day on which he is satisfied
the offence continued.
8. The Permit Holder may appeal
against any condition of this Permit under Section 17 of the Ordinance within
30 days of receipt of this Permit.
9. The Notes are for general
reference only and that the Permit Holder should refer to the EIA Ordinance for
details and seek independent legal advice.
| Figure
1 | Figure 2 | Figure 3 | Figure 4 | Figure 5 | Figure 6 | Figure 7 | Figure 8 | Figure 9 | Figure 10 |
Figure 11 | Figure 12 | Figure 13 | Figure 14 | Figure 15 | Figure 16 | Figure 17 | Figure 18 |
[ Back to First Page ] / [ Back to Main Index ]
Appendix A
Proposed Fill Testing Recommendations
Remarks:
1.
This table is
produced according to Table 6.1 of the VEP application document (No.
VEP-333/2010).
2.
This table is to
be read in conjunction with Condition
COCs |
Recommended Test Method |
Recommended Reporting Limit (mg/kg) |
Acceptance Criteria (mg/kg)* |
Arsenic |
USEPA |
1 mg/kg |
21.8 |
Barium |
1 mg/kg |
10,000 |
|
Cadmium |
0.1 mg/kg |
7.28 |
|
Copper |
1 mg/kg |
2,910 |
|
Molybdenum |
1 mg/kg |
364 |
|
Nickel |
1 mg/kg |
1,460 |
|
Zinc |
20 mg/kg |
10,000 |
|
Mercury |
0.05 mg/kg |
6.52 |
|
Chromium III |
Subtracting CrVI from total Cr |
1 mg/kg |
10,000 |
Chromium VI |
APHA 3500Cr: D |
1 mg/kg |
218 |
Naphthalene |
USEPA 8270 |
0.5 mg/kg |
85.6 |
COCs |
Recommended Test Method |
Recommended Reporting Limit (mg/kg) |
Acceptance Criteria (mg/kg)* |
Anthracene |
|
0.5 mg/kg |
10,000 |
Fluoranthene |
|
0.5 mg/kg |
2,270 |
Pyrene |
|
0.5 mg/kg |
1,710 |
Benzo(a)Pyrene |
|
0.5 mg/kg |
1.14 |
Benzene |
|
0.2 mg/kg |
2.79 |
Toluene |
|
0.2 mg/kg |
705 |
Ethylbenzene |
|
0.2 mg/kg |
298 |
m-Xylene |
|
0.4 mg/kg |
36.8 |
O-Xylene |
|
0.4 mg/kg |
36.8 |
TPH C6-C8** |
USEPA 8015 |
50 mg/kg |
545 |
TPH C9-C16** |
|
50 mg/kg |
1,330 |
TPH C17-C35** |
|
100 mg/kg |
10,000 |
* Based on the ¡§Rural Residential Landuse¡¨ recommended
in the Risk-Based Remediation Goals promulgated in the EPD¡¦s (1) Guidance Note
for Contaminated Land Assessment and Remediation, (2) Guidance Manual for Use
of Risk-Based Remediation Goals for Contaminated Land Management.
** Number of carbon in Total Petroleum Hydrocarbon
Appendix B
Operation Stage Ground-Borne Noise Mitigation
Measures
(Rail Track Types and Location)
Remarks:
1.
The chain-age indicated in
this table is for reference only. Please refer to Figures 18 of this Permit for the
extent of the ground-borne noise mitigation measures.
Chain-age (Approx.) |
Type
of Rail Track |
|
Eastbound |
97256 ¡V 97764 |
MAB1 |
97764 ¡V 97820 |
Turnout2 |
|
97820 ¡V 98476 |
HAB3 |
|
98476 ¡V 99502 |
MAB |
|
99502 ¡V 100206 |
HAB |
|
100206 ¡V 100510 |
MAB |
|
100510 ¡V 100579 |
Turnout |
|
100579 ¡V 100611 |
MAB |
|
Westbound |
100628 ¡V 100507 |
MAB |
100507 ¡V 100467 |
Turnout |
|
100467 ¡V 100210 |
MAB |
|
100210 ¡V 99515 |
HAB |
|
99515 ¡V 98352 |
MAB |
|
98352 ¡V 97825 |
HAB |
|
97825 ¡V 97769 |
Turnout |
Note:
1.
MAB ¡V Medium Attenuation Baseplate trackform with
stiffness of about 25kN/mm.
2.
Turnout ¡V a rail pad with stiffness of about 90kN/mm
maximum, and a baseplate pad with stiffness in a range of about 26 to 36kN/mm.
3.
HAB ¡V High Attenuation Baseplate trackform with stiffness
of about 13kN/mm.