Environmental Permit No. EP-353/2009/I
Àô¹Ò³\¥iÃÒ½s¸¹ EP-353/2009/I
ENVIRONMENTAL IMPACT
ASSESSMENT ORDINANCE
(CHAPTER 499)
Section
10 and 13
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10±ø¤Î13±ø
ENVIRONMENTAL PERMIT TO
CONSTRUCT AND OPERATE A DESIGNATED PROJECT
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡
(³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section 10
of the Environmental Impact Assessment Ordinance (EIAO), the Director of
Environmental Protection (the Director) granted the Environmental Permit (No. EP-353/2009) to the Highways
Department (hereinafter referred to as the "Permit
Holder") on 4 November 2009. Pursuant to Section 13 of
the EIAO, the Director amends the Environmental Permit (No. EP-353/2009/H) based on the
Application No. VEP-477/2015. The amendments,
described below, are incorporated into this Environmental Permit (No. EP-353/2009/I). This Environmental Permit as amended is for the
construction and operation of the designated project described in Part B of
this Permit subject
to the conditions specified in and
attached to Part C of
this Permit.
The issue of this environmental permit is based on the documents, approvals or
permissions described below:
®Ú¾ÚÀô¹Ò¼vÅTµû¦ô±ø¨Ò(±ø¨Ò)²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø¡]¸pªø¡^©ó
Application
No. ¥Ó½Ð®Ñ½s¸¹ |
VEP-477/2015 |
Document in the Register
: µn°O¥U¤Wªº¤å¥ó: |
1. Project Profile ¡V ¡§Hong Kong -
Zhuhai - ¤uµ{¶µ¥Ø²¤¶
―¡§´ä¯]¿D¤j¾ô»´äÉI©¤¡¨¡]µn°O¥U½s¸¹¡GPP-346/2008¡^ 2. Hong Kong ¡V Zhuhai ¡V
Macao Bridge Hong Kong Boundary Crossing Facilities - Environmental Impact Assessment (EIA)
Report, Executive Summary, Environmental Monitoring and Audit Manual (Register No.: AEIAR-145/2009) Hereinafter
referred to as ¡§the EIA Report¡¨ ´ä¯]¿D¤j¾ô»´äÉI©¤
- Àô¹Ò¼vÅTµû¦ô(Àôµû)³ø§i¡A¦æ¬FºKn¡AÀô¹ÒºÊ¹î¤Î¼f®Ö¤â¥U (µn°O¥U½s¸¹:
AEIAR-145/2009) ¤UºÙ¡§Àôµû³ø§i¡¨ 3. Application for Environmental Permit
on ³\¥iÃÒ«ù¦³¤H©ó 4. The
Director¡¦s letter of approval of the EIA Report dated ¸pªø©ó 5. Application for Variation of an
Environmental Permit No. VEP-315/2010 and attached documents submitted by the
Permit Holder on ³\¥iÃÒ«ù¦³¤H©ó 6.
Environmental Permit Issued on ©ó 7.
Application for Variation of an Environmental
Permit on 27 October 2010 (Application No. VEP-327/2010) ³\¥iÃÒ«ù¦³¤H©ó 8.
Environmental Permit Issued on 16 November 2010
(No. EP-353/2009/B) ©ó 9.
Application for Variation of an Environmental
Permit on 21 November 2011 (Application No. VEP-343/2011) ³\¥iÃÒ«ù¦³¤H©ó 10.
Environmental Permit Issued on 25 November 2011
(No. EP-353/2009/C) ©ó 11.
Application for Variation of an Environmental
Permit on 27 February 2012 (Application No. VEP-355/2012) ³\¥iÃÒ«ù¦³¤H©ó 12.
Application for Variation of an Environmental
Permit on 8 October 2012 (Application No. VEP-380/2012) ³\¥iÃÒ«ù¦³¤H©ó 13.
Application for Variation of an Environmental
Permit on 18 April 2013 (Application No. VEP-402/2013) ³\¥iÃÒ«ù¦³¤H©ó 14.
Application for Variation of an Environmental
Permit on 29 July 2013 (Application No. VEP-410/2013) ³\¥iÃÒ«ù¦³¤H©ó 15.
Application for Variation of an Environmental
Permit on 16 January 2015 (Application No. VEP-463/2015) ³\¥iÃÒ«ù¦³¤H©ó2015¦~1¤ë16¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó(¥Ó½Ð®Ñ½s¸¹ VEP-463/2015) 16.
Application for Variation of an Environmental
Permit on 30 June 2015 (Application No. VEP-477/2015) ³\¥iÃÒ«ù¦³¤H©ó2015¦~6¤ë30¤é´£¥æªº§ó§ïÀô¹Ò³\¥iÃҥӽФå¥ó(¥Ó½Ð®Ñ½s¸¹ VEP-477/2015) |
Application No. ¥Ó½Ð®Ñ½s¸¹ |
Date of Application ¥Ó½Ð¤é´Á |
List of Amendments
Incorporated into this Environmental Permit ¤w¥]§t¦b¥»Àô¹Ò³\¥iÃÒ¤ºªº×q¶µ¥Ø |
Date of Amendment ×q¤é´Á |
|
VEP-315/2010 |
|
(1)
Add Conditions 2.12, (¤@) ¥[¤JÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009) C³¡ªº²Ä2.12, (2) Vary Conditions 1.7,
3.1, 3.3, 3.18, 3.19, 3.21 and (¤G) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009) C³¡ªº²Ä1.7, 3.1, 3.3, 3.18,
3.19, 3.21 ¤Î 3.22¶µ±ø¥ó (3) Add Figures 11 to 29 to the Environmental Permit (No.
EP-353/2009) |
2010¦~6¤ë24 ¤é |
|
VEP-327/2010 |
|
(1) Delete
Conditions 2.12, (¤@) §R°£Àô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/A) C³¡ªº²Ä2.12,
(2) Vary
Conditions 3.1, 3.17B, (¤G) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/A) C³¡ªº²Ä3.1,
3.17B, (3) Delete Figure 2
to 7, (No.
EP-353/2009/A) (¤T) §R°£Àô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/A)¹Ï2 ¦Ü7¤Î9¦Ü10 (4) Vary Figure 22, 23, 25 to 27 and 29 of the Environmental
Permit (No. EP-353/2009/A) (¥|) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-352/2009/A)¹Ï22,
23, 25¦Ü27¤Î29 (5)
Add Figure 21a
and 27a to Environmental Permit
(EP-353/2009/A) |
16 November 2010 |
|
VEP-343/2011 |
21 November 2011 |
(1) Vary
Conditions 1.7 and 3.17B to Part C of the Environmental
Permit (No. EP-353/2009/B) (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/B) C³¡ªº²Ä1.7¤Î3.17B¶µ±ø¥ó (2) Vary
Figure 24 of the Environmental
Permit (No. EP-353/2009/B) (¤G) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-352/2009/B)¹Ï24 |
25 November 2011 |
|
VEP-355/2012 |
27 February 2012 |
(1) Vary
Conditions 1.7, 3.17B, 3.18, 3.19 and 3.22 to Part C of the
Environmental Permit (No. EP-353/2009/C) (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/C) C³¡ªº²Ä1.7,
3.17B, 3.18, 3.19 ¤Î3.22¶µ±ø¥ó (2) Add
Conditions (¤G) ¥[¤JÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/C) C³¡ªº²Ä (3) Vary
Figure 1 of the Environmental
Permit (No. EP-353/2009/C) (¤T) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-352/2009/C)¹Ï1 (4)
Add Figures 30 & 31 to Environmental Permit (No.
EP-353/2009/C) |
7 March 2012 |
|
VEP-380/2012 |
8 October 2012 |
(1) Vary
Conditions 1.7 and (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/D) C³¡ªº²Ä1.7¤Î (2) Add
Figures 32 & 33 to
Environmental Permit (No. EP-353/2009/D) (¤G) ¥[¤JÀô¹Ò³\¥iÃÒ(½s¸¹EP-352/2009/D)¹Ï32¤Î33 |
16 October 2012 |
|
VEP-402/2013 |
18 April 2013 |
(1) Vary
Conditions 1.7 and (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/E) C³¡ªº²Ä1.7¤Î (2)
Replace Figure 32 and Figure 33 to Environmental Permit (No. EP-353/2009/E)
with the amended Figure 32 (¤G) ¥Hק蠟¹Ï32¨ú¥NÀô¹Ò³\¥iÃÒ(½s¸¹EP-352/2009/E)¹Ï32¤Î33 |
24 April 2013 |
|
VEP-410/2013 |
29 July 2013 |
(1) Vary
Part B and Condition 1.7 to Part C of
the Environmental Permit (No. EP-353/2009/F) (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/F) B³¡¤ÎC³¡ªº²Ä1.7¶µ±ø¥ó (2) Add
Conditions 4.3 to 4.6 to Part C of the Environmental
Permit (No.EP-353/2009/F) (¤G) ¦bÀô¹Ò³\¥iÃÒ(½s¸¹ EP-353/2009/F) C³¡¥[¤J²Ä4.3¦Ü4.6¶µ±ø¥ó |
6 August 2013 |
|
VEP-463/2015 |
16 January 2015 2015¦~1¤ë16¤é |
(1) Vary
Part B and Condition 1.7 to Part C
of the Environmental Permit (No. EP-353/2009/G) (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/G) B³¡¤ÎC³¡ªº²Ä1.7¶µ±ø¥ó (2)
Add Conditions 3.24 to 3.26 to Part
C of the Environmental Permit (No.EP-353/2009/G) (¤G) ¦bÀô¹Ò³\¥iÃÒ(½s¸¹ EP-353/2009/G) C³¡¥[¤J²Ä3.24¦Ü3.26¶µ±ø¥ó |
19 January 2015 2015¦~1¤ë19¤é |
|
VEP-477/2015 |
30 June
2015 2015¦~6¤ë30¤é |
(1) Vary
Condition 1.7 to Part C of the Environmental Permit (No.
EP-353/2009/H) (¤@) §ó§ïÀô¹Ò³\¥iÃÒ(½s¸¹EP-353/2009/H) C³¡ªº²Ä1.7¶µ±ø¥ó (2)
Add Conditions 3.27 and
3.28 to
Part C of the Environmental Permit (No.EP-353/2009/H) (¤G) ¦bÀô¹Ò³\¥iÃÒ(½s¸¹ EP-353/2009/H) C³¡¥[¤J²Ä3.27¦Ü3.28¶µ±ø¥ó |
17 July 2015 2015¦~7¤ë17¤é |
|
17 July 2015
|
Date ¤é´Á |
|
(Louis P.L. CHAN) Principal Environmental Protection Officer for Director of Environmental Protection Àô¹Ò«OÅ@¸p¸pªø ¡]º®uÀô¹Ò«OÅ@¥D¥ô ³¯ÂbªL¥N¦æ¡^ |
PART
B (DESCRIPTION OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the
description of the designated project mentioned in Part A
of this environmental permit (hereinafter referred to as ¡§the Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title of Designated
Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
(This designated project is hereafter referred
to as ¡§the Project¡¨) ´ä¯]¿D¤j¾ô»´äÉI©¤ (¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ¡§¤uµ{¶µ¥Ø¡¨) |
Nature of Designated
Project «ü©w¤uµ{¶µ¥Øªº©Ê½è |
1.
Reclamation works (including
associated dredging works) more than 2.
A dredging operation
exceeding 3.
A road bridge more
than 4.
A
railway and its associated stations; 5.
A railway tunnel more
than 6.
An activity for the
reuse of treated sewage effluent from a treatment plant. (¤@) ±¿n¶W¹L5¤½³¼ªº¶ñ®ü¤uµ{(¥]¬A¬ÛÁp«õªd¤uµ{)¡F (¤G) «õªd¶q¶W¹L500,000¥ß¤è¦Ìªº«õªd§@·~¡F (¤T) ¾ô¥x¤§¶¡ªºªø«×¶W¹L (¥|) ÅK¸ô¤Î¨ä¬ÛÁp¨®¯¸¡F (¤) ¤J¤f¤§¶¡ªºªø«×¶W¹L (¤») ¹ï±q³B²z¼t¬y¥Xªº¦Ã¤ô¶i¦æ¦A¨Ï¥Îªº¬¡°Ê¡C |
Location of Designated
Project «ü©w¤uµ{¶µ¥Øªº¦aÂI |
Northeast of Chek Lap Kok The location of the Project is shown in Figure 1 of this Permit. ¨ª鱲¨¤¤§ªF¥_± ¤uµ{¶µ¥Øªº¦aÂI®i¥Ü©ó¥»³\¥iÃÒ¹Ï1¤º |
Scale and Scope of
Designated Project «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
The project mainly comprises the followings: (i)
Dredging
and reclamation at the northeast waters off the (ii)
cargo
processing facilities including kiosks for clearance of goods vehicles,
customs inspection platform, X-ray buildings and related supporting
facilities; (iii)
passenger
related facilities including processing kiosks and examination facilities for
private cars and coaches, passengers clearance building and halls and related
supporting facilities; (iv)
accommodation
for and facilities of the Government departments providing services in
connection with the HKBCF; (v)
provision
of transport and miscellaneous facilities inside the HKBCF including public
transport interchange, transport drop-off and pick-up areas, vehicle holding
areas, passenger queuing areas, road networks, footbridges, fencing, sewage
system including reclaimed water
treatment facility, drainage systems, water supply system, utilities,
electronic system, traffic control and surveillance system and related
supporting facilities; (vi)
provision
of road access for connection of the HKBCF to the (vii)
reprovisioning of the affected Airport¡¦s facilities such as the
existing Fire Services Department¡¦s (viii) provision of other facilities for connection with the
Airport such as an Automated People Mover system (i.e. a railway system) to
connect the Airport Terminal with the HKBCF. ¤uµ{¶µ¥Ø¥Dn½d³ò¥]¬A¥H¤U¦U¶µ¡G¡Ð 1.
¦b¾÷³õ®qªF¥_¤ô°ì¶i¦æ«õªd¤Î¶ñ®ü¤uµ{¡A¥H¶}©Ý¤g¦aÅP«Ø»´ä¤f©¤¤Î¤Ùªù¦Ü¨ª鱲¨¤³s±µ¸ôªº«n±¶ñ®ü°Ï¡F 2.
³fª«³B²z³]¬I¡A¥]¬A³f¨®²MÃöÀˬd«F¡B®üÃöÅç³f¥x¡BX ¥úÀˬd¤j¼Ó¤Î¬ÛÃö°t®M³]¬I¡F 3.
»P®È«È¦³Ãöªº³]¬I¡A¥]¬A¨p®a¨®©M®È¹C¤Ú¤h¹LÃö«F©MÀˬd³]¬I¡B®ÈÀˤj¼Ó©M®È«È¥X¤J¹Ò¤j°ó¤Î¬ÛÃö°t®M³]¬I¡F 4.
´£¨Ñ»P»´ä¤f©¤¦³ÃöªA°Èªº¬F©²³¡ªùªº¿ì¤½¦a¤è©M³]¬I¡F 5.
¦b»´ä¤f©¤³]¸m¹B¿é©M¨ä¥L³]¬I¡A ¥]¬A¤½¦@¹B¿é¥æ¶×³B¡B¨®½ø¤W¸¨«È°Ï¡B¨®½ø°±Ô°Ï¡B®È«È½üÔ°Ï¡B¹D¸ôºôµ¸¡B¦æ¤H¤Ñ¾ô¡B³òºô¡B¦Ã¤ô¨t²Î(¥]¬A¦A³y¤ô³B²z³]¬I)¡B±Æ¤ô¨t²Î¡B¨Ñ¤ô¨t²Î¡B¤½¥Î³]¬I¡B¹q¤l¨t²Î¡B¥æ³qºÞ¨î¤Î¸ê°T¨t²Î¤Î¬ÛÃö°t®M³]¬I¡F 6.
¾Q¿v¹D¸ô¥H³s±µ»´ä¤f©¤©M´ä¯]¿D¤j¾ô»´ä±µ½u¡B¤Ùªù¦Ü¨ª鱲¨¤³s±µ¸ô¤Î¾÷³õ¡F 7.
«¸m¨ü¤uµ{p¹º¼vÅTªº¾÷³õ³]¬I¡A¨Ò¦p²{¦³ªº®ø¨¾³B®ü¤W±Ï´©ªFªy¦ì¡F¤Î 8.
³]¸m¨ä¥L³]¬I¥H³s±µ¾÷³õ¡A¨Ò¦p©µ®i²{¦³ªº®È«È±¶¹B¨t²Î¡]§YÅK¸ô¨t²Î¡^¥H«K³s±µ¾÷³õ«È¹B¤j¼Ó©M»´ä¤f©¤¡C |
1.
General Conditions
1.1 The
Permit Holder and any person working on the Project shall comply with all conditions
set out in this Permit. Any non-compliance by any person may constitute a
contravention of the Environmental Impact Assessment Ordinance (Cap.499) and
may become the subject of appropriate action being taken under the Ordinance.
1.2 The
Permit Holder shall ensure full compliance with all legislation from time to
time in force including, without limitation to, the Noise Control Ordinance
(Cap. 400), Air Pollution Control Ordinance (Cap. 311), Water Pollution Control
Ordinance (Cap. 358), Dumping at Sea Ordinance (Cap. 466) and Waste Disposal
Ordinance (Cap. 354). This Permit does not of itself constitute any ground of
defence against any proceedings instituted under any legislation or imply any
approval under any legislation.
1.3 The
Permit Holder shall make copies of this Permit together with all documents
referred to in this Permit and the documents referred to in Part
A of the Permit readily available at all times for inspection by the Director
or his authorised officers at all sites/offices covered by this Permit. Any
reference to the Permit shall include all documents referred to in the Permit
and also the relevant documents in the Register.
1.4 The
Permit Holder shall give a copy of this Permit to the person(s) in charge of
the site(s) and ensure that such person(s) fully understands all conditions and
all requirements incorporated in the Permit. The
site(s) refers to site(s) of construction of the Project and shall mean the same
hereafter.
1.5 The
Permit Holder shall display conspicuously a copy of this Permit on the Project
site(s) at all vehicular site entrances/exits or at a convenient location for
public¡¦s information at all times. The Permit Holder shall ensure that the most
updated information about the Permit, including any amended Permit, is
displayed at such locations. If the Permit Holder surrenders a part or the
whole of the Permit, the notice he sends to the Director shall also be
displayed at the same locations as the original Permit. The suspended, varied
or cancelled Permit shall be removed from display at the Project site(s).
1.6 The Permit Holder shall construct and operate the
Project in accordance with the project descriptions in Part B
of this Permit.
1.7 The
Permit Holder shall ensure that the Project is designed, constructed and
operated in accordance with the information and recommendations described in
the EIA Report, the application
documents including all attachments (Application No. AEP-353/2009,
Application No. VEP-315/2010, Application No. VEP-327/2010, Application No. VEP-343/2011,
Application No. VEP-355/2012, Application No. VEP-380/2012, Application No. VEP-402/2013, Application No. VEP-410/2013, Application No. VEP-463/2015 and Application No. VEP-477/2015), other relevant
documents in the Register; and the information or mitigation measures described
in this Permit and mitigation measures to be recommended in submissions that shall
be deposited with or approved by the Director as a result of permit conditions
contained in this Permit, and mitigation measures to be recommended under
on-going surveillance and monitoring activities during all stages of the
Project. Where recommendations referred to in the documents of the Register are
not expressly referred to in this Permit, such recommendations are nevertheless
to be implemented unless expressly excluded or amended in this Permit.
1.8 All
deposited submissions, as required under this Permit, shall be rectified and
resubmitted in accordance with the comments, if any, made by the Director,
within one month of the receipt of the Director¡¦s comments or otherwise as
specified by the Director.
1.9 All
submissions approved by the Director, all submissions deposited without
comments by the Director, and all submissions rectified in accordance with
comments by the Director under this Permit shall be construed as part of the
permit conditions described in Part C of this Permit. Any
variation of the submissions shall be approved by the Director in writing or as
prescribed in the relevant permit conditions. Any non-compliance with the
submissions may constitute a contravention of the Environmental Impact
Assessment Ordinance (Cap. 499). All
submissions or any variation of the submissions shall be certified by the
Environmental Team (ET) Leader and verified by the Independent Environmental
Checker (IEC) referred to in Conditions 2.1 and 2.2 below, before submitting to
the Director under this Permit.
1.10 The
Permit Holder shall release all finalized submissions as required under this
Permit, to the public by depositing copies in the Environmental Impact
Assessment Ordinance Register Office, or in any other places, or any internet
websites as specified by the Director, or by any other means as specified by
the Director for public inspection. For this purpose, the Permit Holder shall
provide sufficient copies of the submissions.
1.11 The
Permit Holder shall notify the Director in writing the commencement date of
construction of the Project no later than one month prior to the commencement of construction of
the Project. The Permit Holder shall notify the Director in writing immediately
if there is any change of the commencement date of the construction.
1.12 All
submissions to the Director required under this Permit shall be delivered
either in person or by registered mail to the Environmental Impact Assessment Ordinance
Register Office (currently at 27/F, Southorn Centre,
130 Hennessy Road, Wanchai, Hong Kong). Electronic
copies of all finalized submissions required under this Permit shall be
prepared in Hyper Text Markup Language (HTML)
(version 4.0 or later) and in Portable Document Format (PDF version 1.3 or
later), unless otherwise agreed by the Director and shall be submitted at the
same time as the hard copies.
1.13 For
the purpose of this Permit, ¡§commencement of construction¡¨ does not include
works related to site clearance and preparations, or other works as agreed by
the Director.
Specific
Conditions
2. Measures and
Submissions before Commencement of Construction
Employment of Environmental Monitoring and
Audit (EM&A) Personnel
2.1 An
Environmental Team (ET) shall be established by the Permit Holder no later than
6 weeks before the commencement of construction of the Project. The ET shall
not be in any way an associated body of the Contractor or the Independent
Environmental Checker (IEC) for the Project. The ET shall be headed by an ET
Leader. The ET leader shall be a person who has at least 7 years of experience
in environmental monitoring and auditing (EM&A) or environmental
management. The ET and the ET Leader shall be responsible for the
implementation of the EM&A programme in
accordance with the EM&A requirements as contained in the EM&A Manual
of the Project. The ET Leader shall keep a contemporaneous log-book of each and
every instance or circumstance or change of circumstances, which may affect the
compliance with the recommendations of the EIA Report and this Permit. The ET
Leader shall notify the IEC within one working day of the occurrence of any
such instance or circumstance or change of circumstances. The ET Leader¡¦s
log-book shall be kept readily available for inspection by all persons
assisting in supervision of the implementation of the recommendations of the
EIA Report and this Permit or by the Director or his authorized officers.
Failure to maintain records in the log-book, failure to discharge the duties of
the ET Leader as defined in the EM&A Manual or failure to comply with this
Condition would entitle the Director to require the Permit Holder by notice in
writing to replace the ET Leader. Failure by the Permit Holder to make replacement, or further failure to keep contemporaneous
records in the log-book despite the employment of a new ET Leader may render
the Permit liable to suspension, cancellation or variation.
2.2
An
IEC shall be employed by the Permit Holder no later than 6 weeks before commencement of
construction of the Project. The IEC shall not be in any way an associated body
of the Contractor or the ET for the Project. The IEC shall be a person who has
at least 7 years of experience in EM&A or environmental management. The IEC
shall be responsible for duties defined in the EM&A Manual and shall audit
the overall EM&A performance, including the implementation of all
environmental mitigation measures, submissions required in the EM&A Manual,
and any other submissions required under this Permit. In addition, the IEC
shall be responsible for verifying the environmental acceptability of permanent
and temporary works, relevant design plans and submissions under this Permit.
The IEC shall verify the log-book(s) mentioned in Condition 2.1 of this Permit.
The IEC shall notify the Director by fax, within one working day of receipt of
notification from the ET Leader of each and every occurrence, change of
circumstances or non-compliance with the EIA Report and this Permit, which
might affect the monitoring or control of adverse environmental impacts from
the Project. In the case where the IEC fails to so notify the Director of the same, fails to discharge the duties of the IEC as defined in
the EM&A Manual or fails to comply with this Condition, the Director may
require the Permit Holder by notice in writing to replace the IEC. Failure to
replace the IEC as directed or further failure to so notify the Director
despite employment of a new IEC may render the Permit liable to suspension,
cancellation or variation. Notification by the Permit Holder is the same as
notification by the IEC for the purpose of this Condition.
Management
organization of main construction companies
2.3
The Permit Holder shall, at least 2 weeks before
the commencement of construction of each
relevant contract under the Project, inform the
Director in writing the management organization of the main construction
companies and/or any form of joint ventures associated with the construction of
the corresponding part of the Project. The submitted information shall
include at least an organization chart, names of responsible persons and their
contact details.
Submissions
of specification and plan on marine ecological mitigation measures
2.4
The Permit Holder shall advance the preparation
works for the designation of the marine park in the
2.5
The Permit Holder shall deposit with the
Director, at least 2 weeks before the commencement of the construction of the
Project, three hard copies and one electronic copy of a proposal, including the
proposed size and management plan, of the proposed marine park in the Brothers
Islands in consultation with the Director of Agriculture, Fisheries and
Conservation.
2.6
The Permit Holder shall
deposit with the Director prior to the commencement of marine works of the
Project, three hard copies and one electronic copy of a Dolphin Watching Plan.
The plan shall include regular inspection of the silt curtains, visual
inspection of the waters surrounded by the curtains, and an action plan shall
be devised to cope with any unpredicted incidents such as the case that Chinese
White Dolphin is found within the water surrounded by the silt curtains.
2.7
The Permit Holder shall deposit with the
Director at least 1 month before the commencement of construction of the
Project, three hard copies and one electronic copy of a Spill Response Plan
detailing the actions to be taken in the event of accidental spillage of oil or
other hazardous chemicals from construction activities including vessels
operating for the Project, with specific provisions for protecting marine
ecology and the Chinese White Dolphins.
2.8
To minimize the chance of vessel collision and
the disturbance to the Chinese White Dolphins, the Permit Holder shall deposit
with the Director, at least 2 weeks before the commencement of the construction
of the Project, three hard copies and one electronic copy of a plan showing the
regular marine travel routes of vessels moving to and from the Project work
sites. Any subsequent changes to the regular routes shall be verified by the
IEC as conforming to the requirements in the EIA Report and deposited with the
Director.
Landscape
and Visual Plan
2.9
The Permit Holder shall deposit with the
Director, at least 1 month before the commencement of construction of relevant part of the
Project, three hard copies and one electronic copy of a landscape and visual
plan incorporating aesthetic architectural design on buildings structures and
related infrastructure of the Project, streetscape elements, planting proposals
and other measures including night-time lighting control.
Waste
management plan
2.10
The Permit Holder shall deposit with the
Director, at least 1 month before the commencement of the construction of the
project, three hard copies and one electronic copy of a waste management plan
(WMP) for the construction stage of the Project. The WMP shall describe the arrangements
for avoidance, reuse, recovery and recycling, storage, collection, treatment
and disposal of different categories of waste to be generated from the
construction activities and shall include the recommended mitigation measures
on waste management in the EIA Report.
The WMP shall indicate the disposal location(s) of all surplus excavated
spoil and other waste. A trip
ticket system shall be included in the WMP. Surplus excavated spoil and other wastes
shall only be disposed of at designated disposal locations unless otherwise
approved by the Director. All measures
recommended in the WMP shall be fully and properly implemented by the Permit Holder
and any person working on the Project throughout the construction period.
Environmental Project
Office
2.11
To
oversee the cumulative environmental impacts arising from the Project and other
concurrent projects in the adjoining area and to liaise closely with the
mainland project teams for the
2.12
Not used.
3. Submissions
or Measures during Construction of the Project
Measures
to mitigate disturbance to Chinese White Dolphins
3.1
A dolphin exclusion zone
of
3.2
Once
the perimeter silt curtains as mentioned in Condition 3.1 above are installed
or re-deployed, the Dolphin Watching Plan as deposited under Condition 2.6 of
this Permit shall be implemented as part of the EM&A programme.
3.3
To minimize the acoustic disturbance
to Chinese White Dolphins, silence piling equipment such as vibratory piler shall be used for installation of sheet pile
structure into the seabed.
3.4
No underwater percussive piling shall be used
for the Project.
3.5
All vessels within the work areas shall not
travel at a speed higher than 10 knots.
3.6
Air
compressors and other noisy equipment mounted on construction vessels shall be
acoustically- decoupled.
3.7
Not used.
3.8
Not used.
3.9
Not used.
3.10
Not used.
3.11
Not used.
3.12
Not used.
3.13
Not used.
3.14
Not used.
3.15
Not used.
3.16
Not used.
3.17
Not used.
Measures to mitigate water quality impacts
3.17B The Permit Holder
shall construct the Project in accordance with Figures 11 to 28 of this Permit. The perimeter silt curtains as described
in Figure 12 shall be installed
around the HKBCF site before the commencement of marine works. No dredging works of marine sediment
shall be carried out for the Project except for the construction of box
culverts and seawalls at Portion D, the Fire Services Department (FSD) Rescue
Berth and APM Tunnel. FSD Rescue Berth and APM shall not commence construction
before the completion of reclamation of the HKBCF and TMCLKL southern landfall,
unless with prior approval by the Director. The Permit Holder shall notify the
Director in writing any proposed changes in the construction sequences and/or
arrangements before implementation of such changes. The proposed changes shall
be certified by the ET Leader and verified by the IEC as conforming to the
information and requirements contained in the EIA Report.
3.17D A layer of
geotextile shall be placed on top of the seabed
before any filling activities take place inside the cellular structures to form
the seawall. To prevent spillage of
the filling materials onto the surrounding water, the conveyor belts shall be
fitted with windboards and conveyor release points
shall be covered with curtain.
3.17E Except for the filling of the
cellular structures, not more than 15% public fill shall be used for
reclamation filling below +2.5mPD during construction of the seawall. After the
seawall is completed except for the
3.17H Only grab dredgers shall be used for dredging works in
this Project. Each grab dredger shall be enclosed by a cage type silt curtain
with steel enclosure as illustrated in Figure
8 of this Permit to reduce sediment loss to the surrounding environment
during dredging operation.
3.17I No more than 5 filling barge trips per day
shall be made with a maximum
daily rate of
3.17J Upon
completion of
3.17K During the stone column
installation, silt curtain shall be installed near the active stone column
installation points as indicated in Figure
29 of this Permit. A layer of geotextile with stone blanket on top shall be placed on the
seabed prior to stone column installation works.
Measures to mitigate water quality impacts from
re-deposition of Dredged Sediment in Sheet Pile Cellular Structures
3.18 The
dredged sediment from the Project shall be disposed of inside the sheet pile
cellular structures within the Project boundary or the re-deposition area
described in Condition
3.19 Before
re-deposition the dredged sediment, a layer of geotextile
shall be placed at the bottom of the sheet pile cellular structures to avoid
the direct contact of the re-deposited sediment and the bottom sediment.
3.20 Not used.
3.22 The dredged
sediment shall not be disturbed after re-deposition. No piling works or deep
foundation which may disturb the dredged sediment is allowed within the
cellular structures as described in Condition 3.18 of this Permit.
Measures to mitigate water quality impacts from
re-deposition of Dredged Sediment within Designated Re-deposition Area
3.22B Prior to the erection of the steel sheet piles and
re-deposition of sediment, silt curtain shall be installed around the area of
the re-deposition subarea.
3.22D After the re-deposition of sediment
within the re-deposition subarea, a layer of geotextile
and a minimum
3.22E Field
trial(s) shall be carried out to demonstrate that the removal of the temporary
steel sheet piles walls would not cause adverse water quality impacts. A Trial Report shall be endorsed by the
IEC and deposited to the Director.
No removal of the steel sheet piles, except those involved in the field
trial(s), shall be carried out before the Trial Report is endorsed by the IEC
and is deposited to the Director.
Measures to mitigate air
quality impacts during construction phase
3.23 The Permit Holder
shall undertake watering at least 8 times per day on all exposed soil within
the Project site and associated work areas throughout the construction phase.
Measures to mitigate environmental impacts from Floating Grout Production Facilities
3.24 The entire grouting process and materials unloading, loading and transfer shall be
performed within an enclosed system.
The material storage tanks shall be fully covered / enclosed.
3.25 The Permit Holder
shall not discharge any wastewater from the grouting
production process or domestic sewage to the sea.
3.26 Apart from the
air intakes for the ventilation fans, noisy equipment on the floating grout production facilities shall be housed below the ship
deck / inside ship body or provided with enclosures. The air intakes for the ventilation fans
and concrete pumps shall also be provided with acoustic decoupling measures.
Measures to mitigate water quality impacts during loading and unloading of excavated marine mud
3.27 If off-site
disposal is required, the excavated marine mud from the land-based works shall
be disposed of at the designated disposal sites within Hong Kong as allocated
by the Marine Fill Committee or other locations as agreed by the Director.
3.28 No spilling and
overflowing of materials during loading / unloading / transportation shall be
allowed.
4. Measures
or Submissions for Operation of the Project
Emergency
Response Plan for Spillage of Oil and Chemicals
4.1
The Permit Holder shall, no later than 2 months
before the commencement of operation of the Project, deposit with the Director
three sets of a detailed Emergency Response Plan (ERP) on how to prevent oil
and chemical spillages caused by
traffic incidents on the carriageway from entering into the waterbody. The ERP shall be verified by the IEC as
conforming to the recommendations contained in the EIA Report.
Artificial Reef(s)
4.2
The Permit Holder shall, in consultation with
the Director of Agriculture, Fisheries and Conservation, deploy artificial
reef(s) with a total volume of not less than
Treated Effluent Reuse
for Toilet
4.3
The Permit Holder shall ensure the distribution system
for the reclaimed water is only connected for the purpose of toilet flushing
for the Hong Kong Boundary Crossing Facilities. The system shall not be connected to the
Water Supplies Department¡¦s portable water distribution system.
4.4
To avoid cross contamination with Water Supplies
Department¡¦s potable water distribution system, the Permit Holder shall ensure
that the pipes for distributing the reclaimed water are clearly labeled with
warning signs and notices, colour-coded, and of
different pipes sizes to the potable water pipes so that physical connection of
the two distribution systems would not be possible.
4.5
The Permit Holder shall ensure the quality of
the reclaimed water shall meet the standards set out in Table 1 of this Permit.
4.6
There shall be no discharge of surplus reclaimed
water into the sea. In the
event of emergency, the surplus reclaimed water shall be diverted back to the
inlet of the on-site sewage treatment plant.
5.
Environmental Monitoring and Audit (EM&A) Requirements
5.1 The EM&A programme of the Project shall be implemented in accordance with the
procedures and requirements as set out in the EM&A Manual of the approved EIA Report.
Any proposed change to the EM&A requirements or programme shall be justified by the ET leader and
verified by the IEC as conforming to the information and requirements contained
in the EM&A Manual and shall seek the prior
approval from the Director before
implementation.
5.2 Samples, measurements and necessary remedial actions
shall be taken in accordance with the requirements of the EM&A Manual by:
(a) conducting baseline environmental monitoring;
(b)
conducting
impact monitoring;
(c)
carrying
out remedial actions described in the Event/Action Plans of the EM&A Manual
in accordance
with the time frames set out in the Event/Action Plans, or as agreed by the
Director, in case where specified criteria in the EM&A Manual are exceeded;
and
(d)
logging
and keeping records of details of (a) to (c) above for all parameters within 3
working days of the collection of data or completion of remedial action(s), for
the purpose of preparing and submitting the monthly EM&A Reports and to
make available for inspection on site.
5.3 Three hard copies and one electronic copy of the Baseline
Monitoring Report shall be submitted to the Director at least 2 weeks before
commencement of construction of the Project. The submission shall be verified
by the IEC. Additional copies of the submission shall be made available to the
Director upon his request.
5.4
Three hard copies and one electronic copy of monthly
EM&A Report shall be submitted to the Director within 10 working days after
the end of the reporting month. The EM&A Reports shall include a summary of
all non-compliance (exceedances) of the environmental
quality performance limits (Action and Limit Levels). The submissions shall be
verified by the IEC. Additional copies of the submission shall be provided to
the Director upon request by the Director.
5.5
All
environmental monitoring and audit data submitted under this Permit shall be
true, valid and correct.
5.6
To ensure a high degree of transparency
regarding the monitoring data and results in view of the public concern about
the Project, all environmental monitoring and audit data and results and all
submissions and performance test data and results required by this Permit shall
be made available by the Permit Holder to the public through a dedicated web
site to be set up by the Permit Holder under Condition 6.2 below, in the
shortest practicable time and in no event later than 2 weeks after such
information is available.
6.
Electronic Reporting of EM&A Information
6.1 To
facilitate public inspection of the Baseline Monitoring Report and monthly
EM&A Reports via the EIAO Internet Website and at the EIAO Register Office,
electronic copies of these Reports shall be prepared in Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF
version 1.3 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hardcopies as described in Condition 5 of this Permit. For the
HTML version, a content page capable of providing hyperlink to each section and
sub-section of these Reports shall be included in the beginning of the
document. Hyperlinks to all figures, drawings and tables in these Reports shall
be provided in the main text from where the respective references are made. All
graphics in these Reports shall be in interlaced GIF, JPEG or PDF format unless
otherwise agreed by the Director. The content of the electronic copies of these
Reports must be the same as the hardcopies.
6.2 The
Permit Holder shall, within six weeks to the commencement of construction of
the Project, set up a dedicated web site and notify the Director in writing the
Internet address, where the project information, all environmental monitoring
and audit data and reports described in Condition 6.1 above and all finalized submissions and
plans required under this Permit are to be placed. All environmental monitoring
and audit data and reports described in Condition 6.1 above shall be made available to the public
via this dedicated web site to be set up by the Permit Holder in the shortest
possible time and in no event later than 2 weeks after the relevant
environmental monitoring data and reports is/are collected or become available,
unless otherwise agreed with the Director. All finalized submissions and plans
shall be made available to the public via this dedicated web site to be set up
by the Permit Holder in the shortest possible time and in no event later than 2
weeks after they are deposited with or approved by the Director as required
under this Permit, unless otherwise agreed with the Director.
6.3
The
Internet website as described in Condition 6.2 above shall enable user-friendly public
access to the monitoring and project information including the project profile
of the Project, the EIA report, the environmental permit(s), all environmental
monitoring and audit data and report and all finalized submissions and plans
required under this Permit. Unless otherwise agreed with the Director,
the internet website shall have features capable of :
(a) providing access to all environmental monitoring data
collected since the commencement of works;
(b) searching by date;
(c) searching by types of monitoring data (e.g. noise, water and
air quality); and
(d) providing
hyperlinks to relevant
monitoring data after searching.
Notes :
µù¡G
1. This Permit consists of
three parts, namely, Part A (Main Permit), Part
B (Description of Designated Project) and Part C
(Permit Conditions). Any person relying on this permit should obtain
independent legal advice on the legal implications under the Ordinance, and the
following notes are for general information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡¡]³\¥iÃÒ¥Dn³¡¤À¡^¡FB³¡¡]«ü©w¤uµ{¶µ¥Øªº»¡©ú¡^¤ÎC ³¡¡]³\¥iÃÒ±ø¥ó¡^¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If there is a breach of
any conditions of this Permit, the Director or his authorized officer may, with
the consent of the Secretary for the Environment, order the cessation of
associated work until the remedial action is taken in respect of the resultant
environmental damage, and in that case the Permit Holder shall not carry out
any associated works without the permission of the Director or his authorized
officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The Permit Holder may
apply under Section 13 of the Environmental Impact Assessment Ordinance (the
¡§Ordinance¡¨) to the Director for a variation of the conditions of this Permit.
The Permit Holder shall replace the original permit displayed on the Project
site by the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·§â¸gק諸³\¥iÃÒ´À´«¦b«Ø¿v¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A person who assumes
the responsibility for the whole or a part of the Project may, before he
assumes responsibility of the Project, apply under Section 12 of the Ordinance
to the Director for a further environmental permit.
©Ó¾á«ü©w¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À«ü©w¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á«ü©w¤uµ{¶µ¥Øªº³d¥ô«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under Section 14 of the
Ordinance, the Director may with the consent of the Secretary for the
Environment suspend, vary or cancel this Permit. The suspended, varied or
cancelled Permit shall be removed from display at the Project site.
®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q«Ø¿v¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6. If this Permit is
cancelled or surrendered during construction or operation of the Project, another
environmental permit must be obtained under the Ordinance before the Project
could be continued. It is an offence under Section 26 (1) of the Ordinance to
construct or operate a designated project listed in Schedule 2 of the Ordinance
without a valid environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y©ÎÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò«Ø³y©ÎÀç¿ì¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ìÀôµû±ø¨Òªþªí2©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7. Any person who
constructs or operates the Project contrary to the conditions in the Permit,
and is convicted of an offence under the Ordinance, is liable:
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y©ÎÀç¿ì¤uµ{¶µ¥Ø¡A®Ú¾ÚÀôµû±ø¨Ò¡A§YÄݥǸo ¡Ð
(i) on a first conviction on indictment to a fine of $2 million
and to imprisonment for 6 months;
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii) on a second or subsequent conviction on indictment to a fine
of $5 million and to imprisonment for 2 years;
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii) on a first summary
conviction to a fine at level 6 and to imprisonment for 6 months;
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv) on a second or subsequent summary conviction to a fine of $1
million and to imprisonment for 1 year; and
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¤Î
(v) in any case
where the offence is of a continuing nature, the court or magistrate may impose
a fine of $10,000 for each day on which he is satisfied the offence continued.
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄݳsÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ³sÄòªº¨C¤@¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The Permit Holder may
appeal against any condition of this Permit under Section 17 of the Ordinance
within 30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The Notes are for
general reference only and that the Permit Holder should refer to the EIA
Ordinance for details and seek independent legal advice.
¤Wzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C
Environmental Permit No. EP-353/2009/I
Àô¹Ò³\¥iÃÒ½s¸¹EP-353/2009/I
| Figure 1 | Figure 8 | Figure 11 |
|
[ Back to First
Page ] / [
Back to Main Index ]
Table 1: The Standards of
Reclaimed Water for Reuse for Toilet
Water Quality Parameter |
Unit |
Reclaimed Water
Quality |
pH |
- |
6-8 |
Turbidity |
NTU |
¡Ø2 |
Total Suspended Solids (TSS) |
mg/L |
¡Ø10 |
5-Day Biochemical Oxygen Demand (BOD5) |
mg/L |
¡Ø10 |
E.coli |
No./100mL |
Not Detectable |
Total Residual Chlorine (TRC) |
mg/L |
¡Ù1 |
Environmental Permit No. EP-353/2009/I
Àô¹Ò³\¥iÃÒ½s¸¹EP-353/2009/I